- DocumentDOR_-24-09-2022_WQ1-223_IDC-143-3uploaded bykareem
- DocumentDOR_-25-09-2022_WQ1-223_IDC-143-4uploaded bykareem
- DocumentBOP Configuration 9.625inch mud crossuploaded bykareem
- DocumentPO_4510089832uploaded bykareem
- DocumentPO_4510089833 (1)uploaded bykareem
- DocumentIDC-30 Report 02-11-2023uploaded bykareem
- DocumentWorkover Daily report WQ1-039uploaded bykareem
- DocumentDMR _08-12-2021_WQ1-374- IDC-143_2uploaded bykareem
- Document4-WQ1-239- IDC144-8-12-2021uploaded bykareem
- DocumentDMR _10-12-2021_WQ1-374- IDC-143_4uploaded bykareem
- Document6-WQ1-239- IDC144-10-12-2021uploaded bykareem
- Documentطلبات فارغةuploaded bykareem
- DocumentDOR_04-11-2019_ FH#5_IDC45_03uploaded bykareem
- DocumentDOR_03-11-2019_ FH#5_IDC45_02uploaded bykareem
- DocumentDOR_03-11-2019_ FH#5_IDC45_01uploaded bykareem
- DocumentDOR 19-11-2019 FH#5 IDC45 18uploaded bykareem
- DocumentIDC rig 45 POB-13-01-2020uploaded bykareem
- DocumentPICK UP TUBINGuploaded bykareem
- Documentmixing causticuploaded bykareem
- DocumentMAN RIDINGuploaded bykareem
- Documentlaying down drill pipeuploaded bykareem
- Documentjarring and fishinguploaded bykareem
- Documenthandling mud bucketuploaded bykareem
- DocumentIDC SOP # xx Laying Down Drill Pipe from Derrickuploaded bykareem
- DocumentIDC SOP # 13 POOH with DP, DC's and Bituploaded bykareem
- DocumentIDC SOP # 10 Operation of the Pipe Spinneruploaded bykareem
- DocumentIDC SOP # 2 Stump Test BOP (translated to Arabic) reviseduploaded bykareem
- DocumentIDC ARABIC 20# 17 Clean Mud Tank.docxuploaded bykareem
- DocumentIDC SOP # 11 POOH with DP, DC's and Bituploaded bykareem
- DocumentIDC SOP # 10 RIH with DC's and Drill Pipe (Bit on Bottom)uploaded bykareem
- DocumentIDC SOP #2 Pressure test of the standpipeuploaded bykareem
- DocumentIDC SOP #1 Press. test of the standpipe In the direction of flow (downstream) - MPs to TDSuploaded bykareem