DISEDIAKAN OLEH :
RS ARCHITECT
KONTRAKTOR:
KHARFIDA ENGINEERING
PELAN-PELAN AKITEK
LOCATION MAP
SEK. MEN
TAMAN MELAWATI
BUISNESS CENTRE
TAMAN MELAWATI
MRR2
LOCATION MAP
SEK. MEN
TAMAN MELAWATI
DESCRIPTION UNIT QTY RATE AMOUNT
1 PRELIMINARIES
To provide all necessary equipment, material
and labour for the safety, cleanness and local
authority procedure to the site with temporary
hording, project signboard and anything that
involve public utility. 27,000.00
2 CONSULTANT'S
a. Architect 25,000.00
b. Structure Engineer 25,000.00
c. Electrical and Mechanical Engineer 15,000.00
3 DEMOLITION WORKS. 30,000.00
a. Existing Main entrance / wall fencing
b. Existing ram and car porch
c. Existing mezzanine at living and staircase
d. Existing wall, cabinet and top at kitchen
e. Existing wall at bed room
f. Existing roof
4 EARTHWORK. 80,000.00
a. To excavate and chart away existing earth at
main entrance to the adjacent road level.
b. Excavation of pile cap and ground beam
DESCRIPTION UNIT QTY RATE AMOUNT
5 PILING 50,000.00
a. Retaining wall
b. New pile cap for 1st and 2nd / swimingpool
c. New entrance 3rd floor / connecting bridge
6 STRUCTURE 380,000.00
a. New slab, column, beam, stump and
foundation of GR, 1st, 2nd and 3rd floor.
b. Retaining wall
7 SWIMMING POOL 250,000.00
a. Structure
b. Tiling c/w all fin. Accessories
c. Piping, pump and related system
8 GLASS WORK 80,000.00
a. Window
b. Glass wall
c. Glass railing
9 COLD AND HOT WATER PIPING SYSTEM 30,000.00
a. Toilet
b. Kitchen
c. Pantry
d. Garden
e. Parking area
BIL DESCRIPTION UNIT QTY RATE AMOUNT
16 ACCONDITION 70,000.00
To supply and install new accond c/w all
necessary accessories.
TOTAL 1,682,000.000