Core 1 Containment
Priority
(C)
Core 3 Containment
514 bundles (GEH) - damage suspected (JAIF 3/28); Temp: 56 0 C (JAIF, 4/3); Level: fresh water spray periodically (DOE 4/3) latest spray initiated via concrete pumping vehicle 0400EDT4/4 (TEPCo 4/4), 70 Tons of water added (Site Team) 4 SF Pool 1331 bundles in SFP (GEH & NISA) Temp & Level: 420 C (JAIF 4/3). On offsite AC power (DOE 4/3), 150 Tons of water added (Site Team)
0 (NISA); Offsite AC 548 assemblies - no damage; RPV intact; temp 32.8 Ct (TEPCo 4/5); Cold shutdown at 1430 JDT 3/20 power supplying house loads (IAEA 3/28) injection via normal make-up water (IAEA 3/31);
Core SF Pool
946 bundles (JAIF); Temp: 35.5 C,1, (TEPCo 4/5); Cooling capability recovered (JAIF 4/1) 764 assemblies - no damage; RPV intact; Temp: 22.5 0 CJ, (TEPCo 4/5); Cooling using RHR; Cold shutdown at 1927 JDT 3/20 (NISA); offsite AC power to house loads (IAEA 3/28); injection via normal make-up water (IAEA 3/31); 6
876 bundles (GEH); Temp: 28.5C'1t (TEPCo 4/5); Cooling capability recovered (JAIF 4/1) 6,000 bundles (GEH) maintained at 28.0C,4 (TEPCo 4/4); normal cooling started 1805 JDT 3/24/2011 (NISA) 7