NAME OF THE PROJECT : LOCATION:

ARORA COLDSTORAGE GRAM TARAGANJ,TEH. SARANGPUR, DISTRICT UJJAIN(M.P.)

COOLING LOAD CALCULATION FOR COLDSTORAGE CAPACITY 1965x3Nos. = 5895MT


DIMENSIONS IN METERS/CHAMBER Length 16.385 Air Changes No. of Chambers Width 27.19 4 THREE Incoming product temp. 28 15 Height 15 Cu.Mtr. 6682.62225 TEMPERATURES Deg. C outside 45 ante room 15 room 3

Load/chamber : 1965 Total Loading 78.6 TRANSMISSION LOAD : DESCRIPTION AREA IN SQ.MT.

MT MT

Loading/day

78.6 MT

TD Deg C

U Factor No. of units Kcal/hr-sq.mt.degC 0.23 0.21 0.25

hours of operation 24 24 24

Kcal/24 hrs.

Walls Roof Floor TOTAL WORKMEN :

1307.25 445.51 445.51

43 43 43

310288.86 96550.53 114941.10 521780.49

33.71 KW

Nos. 8 LIGHTS : Nos. 10 OUTSIDE AIR : CM/day 26463.249 FAN MOTOR : KW 4.95 PRODUCT : Weight kg/24 hrs 78600 Density kg/m3 1.127 Wattage 23

Factor kcal/hr 220

Hours 12

Kcal/24 hrs. 2640

0.17

KW

Factor 0.86

Hours 12

Kcal/24 hrs. 2373.6

0.15

KW

Factor 0.4

h1 kcal/kg 10.83

h2 kcal/kg 3.6

Kcal/24 hrs. 86251.24

5.57

KW

Factor Kcal/kw 984

Hours 18

Kcal/24 hrs. 87674.4

5.66

KW

Cp Kcal/kg 0.82

TD deg. C 13

Hours 18

Kcal/24 hrs. 837876

54.14 KW 99.41 KW

TOTAL : SAFETY FACTOR :


5%

1538595.73 76929.79 89751.42 KW 104.38 313.15

TOTAL LOAD ON 18HR. BASIS(Kcal/hr.) CAPACITY IN KW

TOTAL FOR 03 CHAMBERS WITH A DIVERSITY OF ______% KW KW Notes: Product load based on _25___days equally divided in 03 chambers. Safety Factor would take care of respiration load etc.