Professional Documents
Culture Documents
Mechanical Tabulation For Hot Water Services Rev 01
Mechanical Tabulation For Hot Water Services Rev 01
1
Serai Project Item Description Qty Unit rate Total Amount Total Unit (RM)
9-Jul-12
1 a. b.
TYPE A Hot Water for toilet (Hot Water Storage) Hot Water for Wet & Dry Kitchen (Instantaneous Hot Water)
5 2
1,000.00 1,000.00
5,000.00 2,000.00
7,000.00 2 a. b. TYPE B1 Hot Water for toilet (Hot Water Storage) Hot Water for Wet & Dry Kitchen (Instantaneous Hot Water)
21
147,000.00
6 2
1,000.00 1,000.00
6,000.00 2,000.00
8,000.00 3 a. b. TYPE B2 Hot Water for toilet (Hot Water Storage) Hot Water for Wet & Dry Kitchen (Instantaneous Hot Water)
20
160,000.00
6 2
1,000.00 1,000.00
6,000.00 2,000.00
8,000.00 4 a. b. TYPE B3 Hot Water for toilet (Hot Water Storage) Hot Water for Wet & Dry Kitchen (Instantaneous Hot Water)
20
160,000.00
6 2
1,000.00 1,000.00
6,000.00 2,000.00
8,000.00 5 a. b. TYPE C Hot Water for toilet (Hot Water Storage) Hot Water for Wet & Dry Kitchen (Instantaneous Hot Water)
21
168,000.00
7 2
1,000.00 1,000.00
7,000.00 2,000.00
9,000.00 Grand Total Equipment Costing Estimated installation cost inclusive PPR pipe and T&C Hot Water System our estimated cost Note:1) The type E & F is not inclusive in this cost estimated is due to Architecture drawing not freezed 2,000.00
37 119 119