DESIGN SHEET

Project :- Simse Sano Aahal irrrigation


Location: Aangna-5, Panchather
C.C.A.: 35 ha.

A.DESIGN OF RESERVOIR TANK SIZING

a) Scheme Information NCA: 35 ha


a.1 Duty
Gross Duty calculated from scheme water balance: #REF! l/s/ha
Using NITP, suppose only 50% of surface area is wetted; Net Duty: #REF! l/s/ha
Total Water Requirement: #REF! l/s
Total Water Requirement in litres per day #REF! ltr.

a.2 No. of Reservoir tank Proposed 1

a.3 Delivery System


Delivery system operation hours 10.00 hrs
Demand to be delivered through reservoir to CA #REF! l/s
Total Water delivered in a day #REF! ltr.

a.4 Supply (Pump) System


Pump Operating hours 7.00 hrs
Adjusted Supply through pipe to be done from sump well to tank 12.00 l/s
Total Water Pumped in a day 302,400.00 ltr.

b) Calculation of Reservoir Sizing

Time Period Hours Cumulative Cumulative


Inflow Outflow Balance
From To In out Inflow Outflow
6:30 PM 8:30 AM 0.00 0.00 #REF! #REF! #REF!
8:30 AM 12:30 PM 4 4 172,800.00 172,800.00 #REF! #REF! #REF!
12:30 PM 1:30 PM 1 0.00 172,800.00 #REF! #REF! #REF!
1:30 PM 4:30 PM 3 3 129,600.00 302,400.00 #REF! #REF! #REF!
4:30 PM 6:30 PM 2 0.00 302,400.00 #REF! #REF! #REF!

Required Reservoir capacity = #REF! ltr.


#REF! Cu.m.
Adopted reservoir capacity = #REF! Cu.m.

Required Dimension of the Reservoir = 10 x 5 x 1.5 = 75.00 Cu.m.

15 cm dead storage and 10 cm free board shall be added to make the total height of reservoir = 1.75 m.

Adopted Dimension of the Reservoir = 10m x 5m x 1.75m


DESIGN SHEET
Project:Tuka Irrigation Project
Location:Ajayameru RM-4 Dadeldhura
C.C.A.:- 10 ha.

A.DESIGN OF RESERVOIR TANK SIZING

a) Scheme Information NCA: 10.00 ha


a.1 Duty
Net Duty calculated from scheme water balance: 1.02 l/s/ha
Total Water Requirement From single Tank: 10.18 l/s
Total Water Requirement in litres per day frtom single tank 879,552.00 ltr.

a.2 No. of Reservoir tank Proposed 1

a.3 Delivery System


Delivery system operation hours 11.00 hrs
Demand to be delivered through reservoir to CA 22.0 l/s
Total Water delivered in a day 871,200.00 ltr.

a.4 Supply System


Operating hours 24.00 hrs
Adjusted Supply through pipe to be done from Intake to Single tank 10.20 l/s
Total Water Pumped in a day 881,280.00 ltr.

b) Calculation of Reservoir Sizing

Time Period Hours Cumulative Cumulative


Inflow Outflow Balance
From To In out Inflow Outflow

5:00 AM 7:00 AM 2 2 73,440.00 73,440.00 158,400.00 158,400.00 -84,960.00


7:00 AM 11:00 AM 4 3 146,880.00 220,320.00 237,600.00 237,600.00 -17,280.00
11:00 AM 3:00 PM 4 0 146,880.00 367,200.00 0.00 237,600.00 129,600.00
3:00 PM 7:00 PM 4 3 146,880.00 514,080.00 237,600.00 475,200.00 38,880.00
7:00 PM 5:00 AM 10 3 367,200.00 881,280.00 237,600.00 712,800.00 168,480.00

Check if Reservoir Gets Filled During Night


Supply to Reservoir From Intake During 7:00 PM to 5:00AM 367,200.00 Ltr
Supply to Field From Reservoir During 7:00 PM to 5:00AM 237,600.00 Ltr
Volume of Water Collected 129,600.00 Ltr
129.60 Cu.m. OK

Required Reservoir capacity = 168,480.00 ltr.


168.48 Cu.m.
Adopted reservoir capacity = 170.00 Cu.m.

Required Dimension of the Reservoir = 14 x 7 x 1.75 = 171.50 Cu.m.

15 cm dead storage and 10 cm free board shall be added to make the total height of reservoir = 2 m.

Adopted Dimension of the Reservoir = 14m x 7m x 2m