DESIGN SHEET

Project :- Dawali Khet Irrrigation Project


Location: Nabadurga 7,8,9 Dadeldhura
C.C.A.: 20 ha.

A.DESIGN OF RESERVOIR TANK SIZING

a) Scheme Information NCA: 20 ha


a.1 Duty
Gross Duty calculated from scheme water balance: 0.20 l/s/ha
Using NITP, suppose only 50% of surface area is wetted; Net Duty: 0.10 l/s/ha
Total Water Requirement: 2.00 l/s
Total Water Requirement in litres per day 172,800.00 ltr.

a.2 No. of Reservoir tank Proposed 1

a.3 Delivery System


Delivery system operation hours 10.00 hrs
Demand to be delivered through reservoir to CA 4.80 l/s
Total Water delivered in a day 172,800.00 ltr.

a.4 Supply (Pump) System


Pump Operating hours 7.00 hrs
Adjusted Supply through pipe to be done from sump well to tank 9.72 l/s
Total Water Pumped in a day 244,944.00 ltr.

b) Calculation of Reservoir Sizing

Time Period Hours Cumulative Cumulative


Inflow Outflow Balance
From To In out Inflow Outflow
6:30 PM 8:30 AM 0.00 0.00 0.00 0.00 0.00
8:30 AM 12:30 PM 4 4 139,968.00 139,968.00 69,120.00 69,120.00 70,848.00
12:30 PM 1:30 PM 1 0.00 139,968.00 17,280.00 86,400.00 53,568.00
1:30 PM 4:30 PM 3 3 104,976.00 244,944.00 51,840.00 138,240.00 106,704.00
4:30 PM 6:30 PM 2 0.00 244,944.00 34,560.00 172,800.00 72,144.00

Required Reservoir capacity = 106,704.00 ltr.


106.70 Cu.m.
Adopted reservoir capacity = 110.00 Cu.m.

Required Dimension of the Reservoir = 8 x 8 x 1.75 = 112.00 Cu.m.

15 cm dead storage and 10 cm free board shall be added to make the total height of reservoir = 2 m.

Adopted Dimension of the Reservoir = 8m x 8m x 2m


DESIGN SHEET RESERVOIR TANK
Project:Bahirisen Irrigation Project
Location:Aalital-3 Dadeldhura
G.C.A.:- 40 ha.

A.DESIGN OF RESERVOIR TANK SIZING

a) Scheme Information NCA: 15.00 ha


a.1 Duty
Gross Duty calculated from scheme water balance: 0.15 l/s/ha
Using NITP, suppose only 50% of surface area is wetted; Net Duty: 0.08 l/s/ha
Total Water Requirement From Tank: 3.00 l/s
Total Water Requirement in litres per day frtom single tank 259,200.00 ltr.

a.2 No. of Reservoir tank Proposed 1

a.3 Delivery System


Delivery system operation hours 9.00 hrs
Demand to be delivered through reservoir to CA 8.0 l/s
Total Water delivered in a day 259,200.00 ltr.

a.4 Supply (Pump) System


Pump Operating hours 12.00 hrs
Adjusted Supply through pipe to be done from sump well to Reservoir 6.11 l/s
Total Water Pumped in a day 263,952.00 ltr.

b) Calculation of Reservoir Sizing

Time Period Hours Cumulative Cumulative


Inflow Outflow Balance
From To In out Inflow Outflow

5:00 AM 7:00 AM 2 1 43,992.00 43,992.00 28,800.00 28,800.00 15,192.00


7:00 AM 11:00 AM 4 1 87,984.00 131,976.00 28,800.00 28,800.00 103,176.00
11:00 AM 12:00 PM 0 0 0.00 131,976.00 0.00 28,800.00 103,176.00
12:00 PM 4:00 PM 4 4 87,984.00 219,960.00 115,200.00 144,000.00 75,960.00
4:00 PM 5:00 AM 2 3 43,992.00 263,952.00 86,400.00 230,400.00 33,552.00

Required Reservoir capacity = 103,176.00 ltr.


103.18 Cu.m.
Adopted reservoir capacity = 105.00 Cu.m.

Required Dimension of the Reservoir = 8 x 8 x 1.75 = 112.00 Cu.m.

15 cm dead storage and 10 cm free board shall be added to make the total height of reservoir = 2 m.

Adopted Dimension of the Reservoir = 8m x 8m x 2m