Item #

Item Description

Action by

Action Date

Silo 1 (Geophysical survey) Marking axis (6 axis) expect to Surveyor complete on 04/02/2013 Monday. Silo 2 Pile load testing will be completed on 31st January 2013. Settlement should be 8.7 mm at load 1090 kg. Pile load testing reports Arch plan report to be submitted to Ayman, Koubr, Dedry, to make the Edwin settlement & load %. Gate house ,Scale house & check point building These buildings are waiting to get the Riyath Backfilling material & Block work office. approval. Slab Push consultant to approve the material Amirdeep, ASAP to start the electrical for roof Zahid slab. Slab should be casted on 04/02/2013.

04-02-13

31-01-13

04-02-13

Sanitary Items Sanitary material and location shop Ibrahim drawings should prepared for plumbing work.

Material approval for slab General note of slab drawing should Mostafa/Ri check to confirm the required approved yad office material.

Gate house B30, B55

Slab Formwork should be finished 60% on 31/01/2013. Steel WSHP for beams. Slab Re-inforcement will be started on 02/02/2013. Slab Formwork & Re-inforcement work Should complete on 03/02/2013. Concrete casting for slab on 04/02/2013. Scale house Exploration for the existing pipe. Solution for existing tunnel Check point Concrete will cast on 05/02/2013 Cafeteria Fix the next mile stone for project cast the concrete for footing Waiting for approval drawing Temperory Gate To be completed on 10/02/2013 Scale House

31-01-13

02-02-13

03/02/2013. 04-02-13

05-02-13

10

11 12

10-02-13