You are on page 1of 1

465

Offshore Estimating

N.6 LaborSubcontracts
Hours
Equip erection
Field erect. tanks
Piping
Instrumentation
Electrical
Site preparation
Fire protection
Concrete
Structural steel
Buildings
Insulation
Paint

6,300
2,000
3 1,000
9,200
10,100
1,100
1,500
10,000
4,000208
4,100
5,300
500

Total Labor Subcont.

85,100

U.S.
$/Hr

K$

Hours
$/Hr

55.0

346

12,600
4,000
62,000
18,400
20,200
2,200
3,000
20,000
8,000
8,200
10,600
1.ooo

Jauja

(1)

50.0
48.0
48.0

1,550
442
486
(1)
(1)
(1)

52.0
(1)

3,032

K$
11.5
6.50
6.50
4.50
4.50
1S O
1S O
1S O
8.50
1S O
1S O
1S O

172,000

790

Note
(I)

Cost of labor included in subcontract in N.5.

N.7 IndirectCosts
Jauja us.

Engineering

urs

Work 35,000

(23

Engineering
Total

1.25

27,900

75.00
K$

Thousand Dollars
Factor

420

12.00

2,090

Field
*Appx. 25% of subcontracts

*350

Spare
* 15% of equip. plus freight& duty

350