Piping progress has been made on two lines, CX-1 and CX-2. CX-1 is 160 inches in diameter and 528 inches have been completed. CX-2 is 210 inches in diameter and 2,486 inches have been completed. No progress was made on CX-C in December with a total of 744 inches remaining.