Letter No:

Date:

From: Dy. Executive Engineer, PIU Sub division, Maddur, MBNR Dist.

To: M/s. P. Manohar Reddy & Bros.

Sub: NABARD-RIDF-XI- Phase-ll - PIU.Division, Mahabubnagar - Providing B.T surface on R/F PWD Road Yadgir-Kodangal to Nagasar (via) Anthwar, Balampet, Sulthanpur MP. Ref: Memo No: DB3/RIDF-Xl/Nagasar/2012-13. ********* Gentlemen, As per the memo of the Executive engineer PIU division Mahabub nagar, the undersigned has inspected the above said road and following observations are pointed out you have not rectified the carriage way, formation width at reaches and also damaged C.C wearing

coat on road dam portions at reaches KM 2/2 to 2/4 KM, 4/8 to 5/0, 5/8 to 6/0 KM is still to be attended.

Then the Dy. Executive Engineer PIU Sub Division Maddur vide Letter No: 1/NABARD/2010, Dated: 28/11/2011, has pointed out that rectifications of patches is not done from KM 10/0 to 12/5 KM reach and a lot of undulations on tank bund portion is still required to be rectified.

Therefore you are requested to contact the undersign for rectification of the said items so as to enable, this office to take necessary action for submission of the complete report.

Dy. Executive Engineer PIU Sub Division, Maddur

Copy submitted to the Executive Engineer, PIU Division Mahabubnagar, for favour of information and for further necessary action. Copy submitted to the Superintending Engineer, P.R.Circle, Mahabubnagar for favour of kind information.