You are on page 1of 3

BILL OF QUANTITIES

Sr. No.
1

Particulars
Excavation for building foundation in all kinds of soils (soft, hard, gravelly, murum etc.) including trimming and dressing sides to true alignment / design section / profile and grade, bailing out subsoil water or water from any other source, timbering, strutting where required, backfilling the trenches in 6" layers, and disposal of surplus earth after backfilling the trenches at specified location as directed by the Engineer In charge including all leads and lifts, providing fence guard, lights, flags and temporary crossings for non vehicular traffic where ever required.

Qty.

Unit

Rate In Figure In Words

Amount (Rs.)

25 2 Providing & laying soling stones 6" to 9" size under floors including packing with spawls, chips & consolidating etc complete including all leads and lifts up to site of works. 80 3 Cement concrete plain including placing compacting, finishing and curing, complete (including screening and washing of stone aggregate) without shuttering . Ratio 1:4:8. Cement concrete plain including placing compacting, finishing and curing, complete (including screening and washing of stone aggregate) without shuttering . Ratio 1:3:6. Supplying earth from approved outside sources including digginhg, loading and unloading and filling in foundatin trenches, plinth or under floor etc. includig breaking clods, dressing, watering and consolidation by ramming in layers not ecxceeding 9 " in depth to full compaction complete with all leads and lifts up to work site. 25.00 6 Providing & laying Reinforced cement concrete work using graded crushed stone 3/4" (19 mm) and down gauge having minimum works cube crushing strength of 3000 psi @ 28 days with the mix not leaner than 1:2:4. This rate also includes all kinds of forms, moulds, lifting of shuttering, curing rendering and finishing the exposed surface including screening the crush, etc. complete.(for culumns, footings , lintles, beams and roof slabs) 30.00

Cu.m

Sq.m

5.00

Cu.m

25.00

Cu.m

Cu.m

Cu.m

Sr. No.
7

Particulars
Providing reinforcement with & including the cost of straightening, cutting, bending, binding, wastage and placing on CC precast or MS chairs and binding with binding wire, cost of chairs and binding wire, including removal of rust etc. complete in all respects. (i) MS Plain round bar (ii) Tor bars with strength of 60000 psi Providing and laying first class solid burnt brick masonry set in cement mortar 1:6 in straight or curved wall including scaffolding, raking out joints and curing etc. complete in foundation, plinth and ground floor super structure.

Qty.

Unit

Rate In Figure In Words

Amount (Rs.)

(a) (b) 8

350 2015

Kg. Kg.

65.00 9 Providing & laying 1:9 cement concrete using graded stone crushed 3/4" and down gauge in terracing 3" avg. thickness to required slope in pannels including form work consolidation, finishing and curing etc and painting the surface with Plastic bitumen no. 4 @ 15 lbs per 100 sft blended with sand @ 2 cft per 100 sft, complete on ground floor roof. 70.00 10 3/4" thick Cement Plaster 1:4 on walls and columns etc. in basement, plinth, mezzanine and ground floor including making edges, corners, and curing etc., complete. 400.00 11 Providing and fixing 1-1/2" thick best quality deodar wood shutter fully glazed with plain glass panes 24 oz (7.3 kg./s.m) approved iron hinges, tower bolts, deodar wood beading and putty packing to glasses etc., complete. 20.00 12 Providing & laying floors of 3" thick 1:2:4 cement concrete using graded crushed stone 3/4" and down gauge in ground floors laid in pannels including form works, consolidation, finishing and providing and laying 3mm glass patties 1" depth, curing etc complete. 160.00 13 Providing & fixing CC Jali of approved quality jointing with 1:3 CC mortar complete in all respect. 10.00

Cu.M

Sq.M

Sq.M

Sq.m

Sq.m

Sq.m

Sr. No.
14

Particulars
Distempering with vinyle distemper of approved make and shade in 2 coats over and including the cost of one priming coat of lime wash including sand papering, dusting and filling the holes & inequalities, in ground floor.

Qty.

Unit

Rate In Figure In Words

Amount (Rs.)

400.00 15 Preparing the surface & painting two coats on new surface with weather coat including the rubbing the surface with rubbing brick / sand paper, filling the voids with chalk / plaster of Paris and then painting with weather coat of approved make. 215.00 16 Primer coat on new work, such as timber work, ceiling and timber boarding etc., of any description, as specified. 2 coats of painting on new work, such as timber work, ceiling and timber boarding etc. of any description with synthetic enamel paint. 10.00

Sq.m

Sq.m

10.00

Sq.m

17

Sq.m

Total Rs.

(Rupees ________________________________________________________________________) (In Words)

___________________ CONTRACTOR

_________________________________________