You are on page 1of 31

Enter Data in White Background Cells

Calculate Size of Transformer / Fuse / Circuit Breaker


Calculation Size of Circuit Breaker & Fuse are as per NEC 450.3

CONNECTED EQUIPMENT TO TRANSFORMER


Sr.No

Equipment

Kw

P.F

Qty

Equipment D.F Total Kva


100%

Total Load (Kva)


Total Load D.F
Total D.F (Kva)

D.F (Kva)

3
0
0
0
0
0
0

3
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0
0

0
0
0
0

0
0

0
0
3
100%
3

Jignesh.Parmar www.electricalnotes.wordpress.com,
jiguparmar@yahoo.com

Enter Detail of
TC/CB/Fuse

Transformer Details
Total D.F Load
Primary Side Voltage (L-L):
Secondary Side Voltage (L-L):
Transformer Impedance:
Transformer Connection
Size of Transformer:
Efficency of Transformer at Full Load
Efficency of Transformer at 1/4 Load

Kva

415
230
5%
Y-Y
3
98.40%
97.50%

Volt
Volt

Kva OR
0.984
0.975

Supervised

Location of Transformer

Kva

Not Supervised

Pri.Side & Sec.Side

Provide Protection on Transformer:


Type Protection on Primary & Secondary Side:

Circuit Breaker

Fuse

:Results:

Transformer Voltage / Current


Primary Line Voltage (L-L)
Primary Phase Voltage (L-P)
Primary Line Current(L-L):
Primary Phase Current(L-P):
Secondary Line Voltage (L-L)
Secondary Phase Voltage (L-P)
Secondary Phase Current(L-P):
Secondary Line Current(L-L):

415
240
4
4
230
133
7.5
7.5

Volt
Volt
Amp
Amp
Volt
Volt
Amp
Amp

Size of Circuit Breaker / Fuse (As per NEC 450.3)


Size of Circuit Breaker on Primary Side:
Size of Fuse on Primary Side:
Size of Circuit Breaker on Secondary Side:
Size of Fuse on Secondary Side:

10
10
10
10

Amp
Amp
Amp
Amp

Transformer Losses
Total Losses@ Full Load
Total Losses@ 1/4 Load
Full Load Copper Loss
Core Loss

49
19
32
17

Watt
Watt
Watt
Watt

Size of Transformer / Fuse / Circuit Breaker


Standard Size of 3 Phase
Transformer (KVA)
1
3
6
9
15
25
30
37.5
45
50
75
112.5
150
225
300
500
750
1000
1500
2000
2500
3750
5000
7500
10000
12000
15000
20000
25000
30000
37500
50000
60000
75000
100000

Standard Size of Fuse / C.B


(Amp)
1
3
6
10
15
20
25
30
35
40
45
50
60
70
80
90
100
110
125
150
160
175
200
225
250
300
350
400
450
500
600
700
800
1000
1200
1600
2000
2500
3000
4000
5000
6000

HOME

UnSupervised

Supervised

Fuse / Inverse Time C.B as per NEC (Amp)

Fuse / Inverse Time C.B as per NEC (Amp)

1
3
6
10
15
20
25
30
35
40
45
50
60
70
80
90
100
110
125
150
160
175
200
225
250
300
350
400
450
500
600
700
800
1000
1200
1600
2000
2500
3000
4000
5000
6000

1
6
10
15
20
25
30
35
40
45
50
60
70
80
90
100
110
125
150
160
175
200
225
250
300
350
400
450
500
600
700
800
1000
1200
1600
2000
2500
3000
4000
5000
6000
6000

1
3
6
10
15
20
25
30
35
40
45
50
60
70
80
90
100
110
125
150
160
175
200
225
250
300
350
400
450
500
600
700
800
1000
1200
1600
2000
2500
3000
4000
5000
6000

1
3
6
10
15
20
25
30
35
40
45
50
60
70
80
90
100
110
125
150
160
175
200
225
250
300
350
400
450
500
600
700
800
1000
1200
1600
2000
2500
3000
4000
5000
6000

3
2

2
3
3

3 Phase T.C (KVA)


1
3
6
9
15
25
30
37.5
45
50
75
112.5
150
225
300
500
750
1000
1500
2000
2500
3750
5000
7500
10000
12000
15000
20000
25000
30000
37500
50000
60000
75000
100000

1
3
6
9
15
25
30
37.5
45
50
75
112.5
150
225
300
500
750
1000
1500
2000
2500
3750
5000
7500
10000
12000
15000
20000
25000
30000
37500
50000
60000
75000
100000

Primary

1
3
6
9
15
25
30
37.5
45
50
75
112.5
150
225
300
500
750
1000
1500
2000
2500
3750
5000
7500
10000
12000
15000
20000
25000
30000
37500
50000
60000
75000
100000
100000

1
2

C.B
600%
600%
600%
25
25

%Imp

Fuse
300%
300%
300%
13
10

More Than 600V


Primary
>600
C.B

1%
2%
3%
4%
5%
6%
7%
8%
9%
10%

600%
600%
600%
600%
600%
600%
400%
400%
400%
400%

Prim.
Sec.

5%

0
0

Prim.
Sec.

5%

0
0

%Imp
1%
2%
3%
4%
5%
6%
7%
8%
9%
10%

More Than 600V


Primary
>600
C.B
600%
600%
600%
600%
600%
600%
400%
400%
400%
400%

Maximum Rating of Over current Protection fo

Protection
Method
Primary only
protection
Primary and
secondary protection

Primary Only

4.17
7.53

Primary Protectio
More than
9A
125%(NH)
250%

Primary only protection


Amp
Pri
1
300%
2
167%
3
167%
4
167%
5
167%
6
167%
7
167%
8
167%
9
167%
10
125%
167%
6.97
6
Primary & Secondary protection

Amp
1
2
3
4
5
6
7
8
9
10
4.17
7.53

Pri
250%
250%
250%
250%
250%
250%
250%
250%
250%
250%
250%
10.43
10

10

Secondary
C.B
250%
125%
250%
19
15

More Than 600V


Primary
>600
Fuse
300%
300%
300%
300%
300%
300%
300%
300%
300%
300%

Fuse
250%
125%
250%
19
15

C.B
300%
300%
300%
300%
300%
300%
250%
250%
250%
250%

C.B
10

Primary
Fuse
10

Supervised
secondary
>600
<600
Fuse
C.B/Fuse
250%
250%
250%
250%
250%
250%
225%
225%
225%
225%

250%
250%
250%
250%
250%
250%
250%
250%
250%
250%

C.B
C.B

600%
250%

Fuse
Fuse

300%
250%

C.B
C.B

600%
125%

Fuse
Fuse

300%
125%

Secondary
C.B
Fuse
10
10

More Than 600V


Primary
>600
Fuse

Not Supervised
secondary
>600
<600
Fuse
C.B/Fuse

C.B

300%
300%
300%
300%
300%
300%
300%
300%
300%
300%

300%
300%
300%
300%
300%
300%
250%
250%
250%
250%

250%
250%
250%
250%
250%
250%
225%
225%
225%
225%

125%
125%
125%
125%
125%
125%
125%
125%
125%
125%

of Over current Protection for Transformers Less than 600 Volts

Primary Protection

Secondary Protection

2A to 9A

More than
Less than
9A
9A
Not required Not required

167%

Less than
2A
300%

250%

250%

nly protection
Sec
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
N/A
N/A

condary protection

125%(NH)

167%

Sec
167%
167%
167%
167%
167%
167%
167%
167%
125%
125%
167%
12.58
10

10

You might also like