00026 005921 Sticker Nr Job Nr RW 1 -

M i n i s t r y o f H e a l t h
E n g i n e e r i n g d i v i s i o n
C e n t r a l W o r k s h o p
J ob Card
External work 40,000 manufacturing of calibration tool for ether concentration lever
Miscellaneous 23,500
Model
Descriptor
Make
Facility
Building
12-345 3234-34 Serial number
Main Item Identification of item
PENLON
Anaesthesia unit, EMO, trolley mounted///
Internal
External
Kind Maint Corrective
Year Manufact 1981
Repair
performed
Repair Type/Location
Location of item
Region 024/District 106/Sub District 142//District Hospital 001 RL3 DH
Operating Theatre Operating Room, Main Dept/Room
Complaint
Concentration of Ether too low.
Temperature compensation unit broken
Repair Log
In spite of old unit, decided to Repair. Spares were
available
Total recondition. New Gaskets
New Temperature compensation unit
Recalibration of the unit
Failure reported Poor performance Failure found Incorrect maintenance
Spare descriptor Qty Part Nurmber Manuf Pack Qty/Pk Unit
Spare Parts Used
Price/Unit Total Price
2E+09 1 61601 each 1 pc Temperature Compensation unit / PENLON 4,700 4,700
2E+09 1 each 1 pc Gasketset for EMO / PENLON 10,000 10,000
14,700 Subtotal spare parts
By Hrs Description of work Position
Specification of labour
Cost/Hour Total Cost
GA 1632702038 1 -1196282023 Recalibration of EMO WshpMgrH 7,500 7,500
DA 1632702038 5 1654528952 Overauling of EMO unit BioMedEng 10,000 50,000
57,500 Subtotal labour
Description of travel / boarding / lodging Qty Cost/Unit Unit
Travel Expenses
Total
2E+09 1 -2E+09 day Out of station allowance, Engineer 2,000 2,000
2E+09 1 2E+09 night Per diem Hotel, Engineer 2,000 2,000
2E+09 500 -2E+09 km Vehicle, Four wheel drive 250 125,000
129,000 Subotal Travel Expenses
J ob Progress
Request Received 01/05/2000 Received by DA
Started 03/05/2000
Completed 10/05/2000
Collected/delivered 15/05/2000 Coll/deliv by Peter Dankwah
Date Invoice 15/05/2000 Invoice Nr 2015
Date Pro Forma 14/05/2000 Proforma Nr 2015
Performed by
Approved by
DA
GA 4 Remaining Lifespan Yrs
Lifespan (Corrected) 22.5 Yrs
Year Commissionned 1983
Life Cycle
Year write off override
2006 Year write off
Date Payment 20/06/2000
Total 264,700