This document outlines the total project costs and percentages of various water and infrastructure projects for the Zamboanga City Water District. It lists 6 categories of projects: 1) Construction/Rehabilitation of Water Systems, 2) Pipe laying/Rehabilitation of Distribution/Feeder Lines, 3) Construction/Upgrading of Electrical Power Systems, 4) Construction of Treatment Facilities, 5) Construction of Bulk Water Supply Transmission & Distribution Mains, and 6) Construction of Support Structures. The largest project by cost and percentage is the Construction of 50,000 m3/day Transmission & Distribution Pipelines at 53.38% of the total budget. The total budget for all projects is 907,852,441.
This document outlines the total project costs and percentages of various water and infrastructure projects for the Zamboanga City Water District. It lists 6 categories of projects: 1) Construction/Rehabilitation of Water Systems, 2) Pipe laying/Rehabilitation of Distribution/Feeder Lines, 3) Construction/Upgrading of Electrical Power Systems, 4) Construction of Treatment Facilities, 5) Construction of Bulk Water Supply Transmission & Distribution Mains, and 6) Construction of Support Structures. The largest project by cost and percentage is the Construction of 50,000 m3/day Transmission & Distribution Pipelines at 53.38% of the total budget. The total budget for all projects is 907,852,441.
This document outlines the total project costs and percentages of various water and infrastructure projects for the Zamboanga City Water District. It lists 6 categories of projects: 1) Construction/Rehabilitation of Water Systems, 2) Pipe laying/Rehabilitation of Distribution/Feeder Lines, 3) Construction/Upgrading of Electrical Power Systems, 4) Construction of Treatment Facilities, 5) Construction of Bulk Water Supply Transmission & Distribution Mains, and 6) Construction of Support Structures. The largest project by cost and percentage is the Construction of 50,000 m3/day Transmission & Distribution Pipelines at 53.38% of the total budget. The total budget for all projects is 907,852,441.
a . Construction/Rehabilitation/Improvement of Mangga Bolong-Bolong-Bunguiao-Sangali Water System 52,561,743.20 5.79% b . Construction/Rehabilitation/Improvement of Water System at Pamucutan & La Paz 51,056,508.17 5.62% c . Construction/Rehabilitation/Improvement of Water System at Guisao Interior 5,233,465.06 0.58% d . Construction/Rehabilitation/Improvement of Water System at Mangusu 11,422,918.39 1.26% e . Construction/Rehabilitation/Improvement of Water System at Cahumban, Tolosa 46,370,133.70 5.11% Subtotal 166,644,768.52 18.36% II. Pipe laying/Rehabilitation of Distribution/Feeder Lines a . Don Pablo Lorenzo St. Pipeline Replacement 4,304,827.30 0.47% b . Gov. Lim Avenue Pipeline Replacement 4,801,965.30 0.53% c . Campo Islam Pipeline Replacement 6,904,553.00 0.76% d . Johnston Subdivision ACP Pipe Replacement 4,493,794.00 0.49% e . Pipeline Extension Project (For Decommissioning of MC Climaco Old Pipelines) 1,634,238.56 0.18% g . Construction of Errea Compound Feeder line 828,210.00 0.09% h . Construction of Doa Benita Drive Feeder line 1,477,303.00 0.16% Subtotal 24,444,891.16 2.69% III. Construction/Upgrading of Electrical Power Systems a . Upgrading of ZCWD Main Office Electrical Power Systems 3,039,753.48 0.33% b . Upgrading of Luyahan Booster Station Primary Line from Single Phase to Three Phase Power Supply 1,248,821.00 0.14% Subtotal 4,288,574.48 0.47% Particulars Republic of the Philippines Zamboanga City Water District Pilar St., Zamboanga City LIST OF PROJECTS REQUIRING FINANCING ESTIMATED PROJECT COST in PhP Page 1 of 2 III. Construction of Treatment Facilities a . Construction of 20,000 m 3 /day Capacity Water Treatment Facility at Old Reservoir, Pasonanca 136,197,168.00 15.00% b . Construction of 6,000 m 3 /day Capacity Sewerage Treatment Plant 75,000,000.00 8.26% Subtotal 211,197,168.00 23.26% IV. Construction of Bulk Water Supply Transmission & Distribution Mains a . Construction of 50,000 m 3 /day Transmission & Distribution D.I. Pipelines 484,643,350.34 53.38% Subtotal 484,643,350.34 53.38% VI. Construction of Support Structures a . Gov. Ramos I Production Well Pay Center 4,300,000.00 0.47% b . Pasobolong II Production Well Civil Works 3,744,595.00 0.41% c . ZCWD Main Office Elevator System 4,284,054.97 0.47% d . Suspension Footbridge at Banuang 2,204,219.14 0.24% f . Suspension Footbridge at Intake 2,100,820.17 0.23% Subtotal 16,633,689.28 1.83% GRAND TOTAL 907,852,441.78 100.00% Prepared by: MARLI P. ACOSTA-DE FIESTA OIC, Planning & Design Division Page 2 of 2