16,919,263.4
Project:- Bike Water Supply and Sanitation Project
Summary of Pipe works
Current
S.No Description of Item No Previous Amount
Amount
Supply of HDPE - Raising main and Fitting :- From
B-1 Borhole To 500m3 Booster Station and from booster 1 20,160,000.0 195,000
1 to Service Reservior
B-2 Mainline welding,laying & fitting 1 0.0 1,453,520
Main Line Trench excavation from BH to Service
B-3 1 666,839.3 3,953,795.0
Reservoir
B-4 Mainline pipe Civil Works 1 0.0 1,390,450.2
Sub Total 20,826,839.3 6,992,765.2
Contractor Client
Name: Eng Abiyot Demissie Name:
Signature Signature
Date Date
Total Executed Total Amount
0 3,634,315.1
0 494,100.0
0 2,367,872.5
0 2,464,941.0
0 1,129,500.0
0 8,627,405.2
0 349,200.0
0.0 19,067,333.7
_______________________________
_________________________
________________________
Project:- Bike Water Supply and Sanitation Project
Cost Summary all Works
Previous Current
Item No Item Description Quantity
Amount Amount
A-1 General Items 1 1,522,500 771,500
A-2 Pipe works 1 20,826,839 6,992,765
A-3 Civil works 1 1,816,250 13,189,128
A-4 Electromecnical 1 0 0
TOTAL 24,165,589 20,953,393
15% VAT 3,624,838 3,143,009
GRAND TOTAL 27,790,428 24,096,402
Contractor Client
Name: Eng Abiyot Demissie Name: __________________________________
Signature:________________________ Signature:_________________________________
Date:__________________________ Date:_____________________________
Contract
Total Amount
Amount
2,294,000 2,950,000 77.8% 90.0%
27,819,605 30,123,261 92.4% 93.3%
15,005,378 17,618,050 85.2% 83.4%
0 19,067,334 0.0%
45,118,983 69,758,645 64.7% 88.9%
6,767,847 10,463,797
51,886,830 80,222,442