After drilling a well, one of the most major concerns is completion


operation. Although there are some different methods to completion,
according to reservoir properties, well situations and economical
considerations, the best efficient method must be selected to maximize the
production rate and minimize the costs.
In this paper, three methods of gas well completion have been introduced
and also their technical and economical aspects have been explained.
These methods include MonoBore (-in tubing), Big Bore (BB) and
Optimized Big Bore (OBB) completions.
Results show that the big bore concept, compared to the prior -in
MonoBore design, include reduced development costs by higher production
rate and requiring fewer wells. Therefore to achieve a safe, efficient and
reliable completion, modern methods can be more applicable. In fact
Optimization of big bore completion may be help to competent gas well
Completion.
Key Words: Completion MonoBore - Big Bore - Optimized Big Bore
(1

.
.

.
. .

.
.
.

7
.
(2
.

.

.
.
(1
HS CO
.
.
(2 :1
2 .

.
(3 :

.
(4 :

- Differential Sticking
- Open Hole


.
.

X Leak off
. .
(5 :

.

.
.
(6 :
.
.
(7 :

].[1
(3 Optimized Big Bore Big Bore Monobore

MonoBore .

. 7

. .

- Cased Hole

.

].[2

.
.

. .

Big Bore 9 5/8


. Big Bore 1990

.
.
].[3

.
. .
.

Monobore ) (Big Bore


. 9 5/8
7 . .
Big Bore %70 . 9 5/8
7 :
(
4 .
9 5/8.

- packer

13 3/8 9 5/8.
7 .
.
7
7.

)
(]. [3
( :
9 5/8 7 .

. Big Bore

Big Bore .

.
.
.
].[3

Big Bore) Optimized Big Bore (OBB


13 3/8*9 5/8*7 5 ) .(1
9 5/8*7 5/8*7
7 - MonoBore - Big Bore .


].[1

- Tapered

:1 [1] Optimized Big Bore

Big Bore 1991

. OBB 2002
2004 .
.
(4

.
(4-1 Big Bore :
1971
. 1000 10000
.
350 7100 1977 .
%15 50 ppm .

30 100 6 .
.
].[4
Big Bore .
7 9 5/8
.
4 .
:
) (Big Bore -
LNG

. 14 7

84 10 Big Bore

75 . 1

MonoBore Big Bore .

:1 Monobore Big Bore


in. Mono bore

Big Bore Well

200

30 )(Conductor pipe

2000

20

7300

17 1/2 13 3/8

12 1/4
9 5/8

10

7 /
-MMSCFD

2 .
MonoBore 7 7
10 9 5/8
].[3

:2 Monobore Big Bore


(4-2 :Optimized Big Bore
1971 . 6000
900 TCF .
)( 10000 .

.
LNG

LNG .
.

.
OBB .
:2

Monobore )(OBB
Tapered Bore

7 Monobore

13 3/8 9 5/8

9 5/8 * 7 5/8 * 7

10 3/4 * 9 5/8

200 MMscfd

9 5/8

125 MMscfd

Continuous Bore

9 5/8
) 25 ( 100
.
9 5/8 * 7 5/8 7 %22 .
) . . [5]( 3
.

:3 MonoBore OBB

:

.
.
MonoBore .

. Big Bore
.
Big Bore OBB . Big Bore
OBB
.


.

.

:
. B. M. Clancey et al. () Optimized Big Bore gas wells for Qatar
North Field, international petroleum technology conference held in
Malaysia - December, IPTC .
. Randy Simonds & Tom Swan, (), Development of a Large-Bore
Monobore Completion System for Gas Production, Asia Pacific oil
and gas conference and exhibition held in Australlia - October,
SPE .

. W. N. Cannan, (), Big Bore completions: A new completion


technique for Arun Field, , Asia Pacific oil and gas conference and
exhibition held in Singapore - February, SPE .
. J. Benesch & N. Nor & Ngatijan, (), Optimization of a Big-Bore
HP/HT wells to exploit a low pressure reservoir in Indonesia, SPE
drilling conference held in Dallas, USA ,- March, SPE .

. B. M. Clancey et al. (), Design, construction and optimisation of


BigBore gas wells in Giant offshore field SPE drilling conference held
in Amesterdam, Netherlands ,- February, SPE .

You might also like