You are on page 1of 7

Rescue plan

Confined space and working at height in


Thickener Package ODI3-P2 PAP

OWNER

OCP / JESA

CONTRACTOR.

SAMSUNG C&T

SUBCONTRACTOR

DLM

PROJECT

ODI #3&4(P2&P5) PROJECT

LOCATION

JORF LASFAR MOROCCO.

DOC. No.

1
REV

18/12/2014 For Approval


Date

Description

-DLM-SAM-M-CMST-

/Rev 1

A.CHENNANE
Prepared (DLM)

Cheeked

Approved

Table of contents

Introduction ........................................................................................ 1
Scope................................................................................................... 1
People in Charge ................................................................................. 1
Emergency case................................................................................... 2
Requirement for rescuing operation ................................................... 3
Rescue Operation................................................................................ 4

Introduction

We all collaborating to execute the work of erecting Slurry Thickener and Rock Slurry Tanks in
PAP area of P2 but this kind of work exposes workers and also supervisors to a lot of risks which
their health and safety is our priority.
In order to achieve our goal with 0 accident or at least minimize damages, DLM is engaged to follow
HSE rules for prevention of incidents or accidents that might result from abnormal operating conditions
on the one hand and reduction of adverse effects that result from normal operating conditions on the
other hand.

Scope

The purpose of this Document is to establish guidelines for responding to an emergency case for
working in Slurry Thickener or Rock Slurry Tanks. These instructions should ensure that the victims
health risks are minimized and that the rescue is conducted in a safe and professional manner.

People in Charge
Name

Position

Mr. ABBOUCHI.EL MAATI

DLM Site manager

Mr. ELGUARNI Mehdi

DLM Contract Manager

Mr. CHENNANE Amine

DLM Site Engineer

Mr. BENDAGHA Mohammed

DLM HSE Supervisor

Mr. JUNG Juyoung

Samsung HSE Engineer

Mr. BOULMANE Abdelghani

Samsung HSE Supervisor

Mr. Hamada

DLM construction
supervisor
Samsung Ambulance Driver

Mr. SAIH Youssef


Mr. BOUATERE Mustapha

Contact
Email : abbouchi_maati@hotmail.fr
Phone : 06 61 13 98 74
Email : m.elguarni@dlm.ma
Phone : 06 62 19 46 77
Email : amine.chennane@gmail.com
Phone : 06 02 42 29 22
Email : mohammedbendagha@gmail.com
Phone : 06 62 45 63 36
Email : john2.jung@samsung.com
Phone : 06 62 72 69 31
Email : abdel.boulmane@gmail.com
Phone : 06 41 29 04 94
Phone : 06 66 93 24 72
Phone: 06 36 86 06 31
Phone: 06 64 21 71 18

Mr. JEBOURI

DLM HSE INSPECTOR &


First Aider
DLM Watchman

Mr. ZOUHARI

Crane operator

Phone: 06 61 83 47 86

Phone: 06 02 62 77 55

Emergency case

Requirement for rescuing operation

Equipment:
Mobile crane
4 Slings and Stretcher
Stop chute
Samsung Ambulance
First Aid Box
Talkie-walkie

HSE animator.

First aider.

Have access to the ambulance.

The figure below shows the area of work.

Rescue Operation

The present section describes the principal steps to be carried out to rescue victim by:
1. Protect the IP, inform about the accident and asking for help.
2. Lift the stretcher by mobile crane to the place of accident

3. Take out the victim from confined space which located inside the Slurry Thickener and
Rock Slurry Tanks.
The aid will try to recover and take out the victim to the scaffold platform using stretcher or Man
basket.
4. This step is consisted of evacuation of the victim from the scaffold platform to the
ground, to ensure safe operation, we are going to use stretcher with slings and mobile
crane.
Take the victim into the stretcher and tight it with the stop-chute
Start up the lifting of the victim
Take down the victim carefully to the ground level and move it to the ambulance.