Fatality 0 0
Loss Time Injury (LTI) 0 0
Restricted Workday Case (RWC) 0 0
Medical Treatment Case (MTC) 0 0
First Aid Case (FAC) 1 1
Property Damage 0 1
Fire Case 0 0
Nearmiss 0 0
Page 1
A. GENERAL MANPOWER AND MANHOURS
Page 2
D. MANPOWER & MANHOURS PT. KARYA INTERTEK KENCANA
E. PERSONNEL STRENGTH
Page 3
G. FINDING STATUS
1 - - -
Waiting
rebar
2 For temporary All scrap in good
team
tidied up first housekeeping
provide
scrap rack
Poor housekeeping (24-08-2018) OPEN
TATA
Waiting
electrical
3
team
- -
install the
temporary
lamp
Access need more lighting (29-08-2018)
OPEN TATA
PROCEDURE
1 TATA will send Incident Report (Property Damage) TATA 17-07-2018 Closed
RHDHV will sent letter to TATA safety team RHDHV 29-08-2018 Closed
RHDHV will sent letter to Safety leader PT. TATA TATA 04-09-2018 Open
RHDHV will sent letter to Safety leader PT. TATA RHDHV 04-09-2018 Open
Page 5
No Description PIC Issued Status
ELECTRICITY
WORKING AT HEIGHT
9 TATA will put stickers for those who follow WAH
TATA 31-07-2018 Open
training
10 Total of K3 team TATA = 4 person
TATA 04-09-2018 Info
lifeline 2, barricades 1, safety lines 1
HOUSKEEPING
13 After the canteen has finish, parking area in the TATA 07-08-2018 Open
project area will be restricted by using GATE PASS
14 TATA will provide dedicated access for evacuation TATA 07-08-2018 In Progress
routes in the building area
15 Smoking Area TATA 28-08-2018 Closed
RHDHV will sent letter to Project Manager PT.
16 RHDHV 04-09-2018 Open
TATA
PLATFORM & ACCESS
Page 6
No Description PIC Issued Status
PPE
20 For steel teams, it is mandatory to use safety shoes TATA 07-08-2018 Info
Regarding of AP boot shoes, TATA will spend the
stock of shoes in the warehouse and then will TATA 07-08-2018 Info
provided the safety shoes
J. SAFETY WALK
Closed out within
No Issue and action required (picture) Location (Days) Action by
(PIC)
1 3 7
1 TATA
TATA Office
2 TATA
TATA Office
3 TATA
Rest Area
Poor housekeeping
4 TATA
Rest Area
Page 7
5 TATA
Parking Area
6 TATA
Rest Area
Poor housekeeping
7 TATA
Rest Area
Poor housekeeping
8 TATA
Rest Area
Poor housekeeping
Page 8
11 Cipta Dimensi TATA
Office
12 TATA
Project Area
13 TATA
Project Area
Poor housekeeping
14 TATA
Project Area
Poor housekeeping
15 TATA
Utility Area
16 TATA
Generator Area
Page 9
17 TATA
Generator Area
18 TATA
Generator Area
19 TATA
Utility Area
20 TATA
Utility Area
21 TATA
Office Area
22 TATA
Office Area
Page 10
Warehouse TATA
23
Area
24 Production TATA
1st Floor
25 Production TATA
1st Floor
26 Rebar TATA
Fabrication 3
27 Rebar TATA
Fabrication 3
Rebar TATA
28
Fabrication 3
Page 11