You are on page 1of 1

CONTRACT N:

CONTRACT
TITLE:
CONTRACTOR:
REVIEW
SUBJECT:

ITEM

PG-01

ENGINEERING REVIEW COMMENTS ERC


PIC G-1507A
Construction of Two(2) Schools for IG HAII AL-JAAR and SG for
Aziziah-5
Condensate drain line for Boys Secondary School, please review
and comment on the clarification of condensate darin outlets as per
attached IFC drawings.

REFERENCE
DWG. PAR

General

Page 1 of 1
March 1 , 2015
EWR N:
DISCIPLINE:
REVIEWER:
SECTION
MGR:

COMMENTS

CC*

1.) Current design of condensate drain for said school


does not comply with higher management direction.it
is recommended to reroute condensate drain and
connect it to the internal scuppers (@ internal
courtyard) and replacing these scuppers to
downspout pipe and connect it directly to storm
drainage network, instead of using the external
scuppers, to avoid sidewalk getting constantly wet.

92214
ME
Arturo Jasme
Emad Wazzudin

ACTION

2.) Contractor to submit shop drawing for approval.

*CC= Comment Category


A- Non-compliance with Codes and
Standard
B- Incomplete / Missing Information
C- Constructability Issues

D- Maintainability of Facilities

G- Lack of coordination

E- Maintainability of Documents
F-Non-Compliance with Concept/Scope

H- Value Engineering
I- Minor Comment

R- Repeat Comment
FORM: Y02-02-00-01/02 (Rev. 01)

You might also like