Total work done from Eid-ul-fitre to Eid-ul-Azha in my projects.
Name
of
Project
s
Members (casting
done)
(A)Col B)Sla (C)Pi
le
umn, b
cap /
stair &
(No) Roof
top
lift(lev
el)
S.Moloy
a
-----
------
S.Karim
s
Delight
S. MM
point
01
S.Raha
m
Manjil
Moshar
af
Tower
03
02
01
01
Chondr
omollik
a
Total=
03
03
=8.5le
vel
=8
nos.
28
nos
out
of
49
------
Casting volume
Colu
mn,
stair
& lift
(cft)
Slab
(cft)
R.
pile
cap/
Roof
top
(cft)
559
6
Total
castin
g
volum
e
in
(cft)
5596
Tota
l
reb
ar
in
(ton
)
Total
QMD
Visit
(time
)
28.5
45
40
(Apx)
Passe
d
Cylind
er test
Result
Casti
ng
perio
d
Day /
Night
Day
553
3600
------
4153
29.9
06
Passe
d
Night
------
867
2984
-------
4718
34
15
Passe
d
-------
651
2180
-------
6152
31.3
74
24
Passe
d
Day
or
Night
Day
01(
Roof
Too
p)
------
680
3300
151
2
5492
22.1
02
09
Passe
d
Night
561
2330
/211
8
-------
8249
41.5
27
Passe
d
Day
=1/
1
-------
-------
------
3436
0 cft
=
=121
187. times
5to
ns
Total
visit =
## All information (rebar consumption, casting area & casting volume) collected from
the Project-in-charge by over phone.
**All Cylinder design strength has been achieved at 7 days or 28 days successfully.
Note: Each level of column set casting done in two times & each time QMD checked
in three stages (Rebar, shutter & casting check). So, 6 times visit required before one
level of column set casting. And 3 times (Beam rebar, slab rebar & slab casting) of
QMD visit needed before a slab casting.
So, total visit with Report 121 times & Random visit without report
20 times (approximately) = 141 times (approximately).