Total Work Done (RCC) from Eid-ul fitre to Eid-ul

Azha
Total work done from Eid-ul-fitre to Eid-ul-Azha in my projects.
Name
of
Project
s

Members (casting
done)
(A)Col B)Sla (C)Pi
le
umn, b
cap /
stair &
(No) Roof
top
lift(lev
el)

S.Moloy
a

-----

------

S.Karim
s
Delight
S. MM
point

01

S.Raha
m
Manjil
Moshar
af
Tower

03

02

01

01

Chondr
omollik
a
Total=

03

03

=8.5le
vel

=8
nos.

28
nos
out
of
49
------

Casting volume
Colu
mn,
stair
& lift
(cft)

Slab
(cft)

R.
pile
cap/
Roof
top
(cft)

559
6

Total
castin
g
volum
e
in
(cft)
5596

Tota
l
reb
ar
in
(ton
)

Total
QMD
Visit
(time
)

28.5
45

40
(Apx)

Passe
d

Cylind
er test
Result

Casti
ng
perio
d
Day /
Night
Day

553

3600

------

4153

29.9

06

Passe
d

Night

------

867

2984

-------

4718

34

15

Passe
d

-------

651

2180

-------

6152

31.3
74

24

Passe
d

Day
or
Night
Day

01(
Roof
Too
p)
------

680

3300

151
2

5492

22.1
02

09

Passe
d

Night

561

2330
/211
8

-------

8249

41.5

27

Passe
d

Day

=1/
1

-------

-------

------

3436
0 cft

=
=121
187. times
5to
ns
Total

visit =

121 times (apx)

## All information (rebar consumption, casting area & casting volume) collected from
the Project-in-charge by over phone.
**All Cylinder design strength has been achieved at 7 days or 28 days successfully.

Note: Each level of column set casting done in two times & each time QMD checked
in three stages (Rebar, shutter & casting check). So, 6 times visit required before one
level of column set casting. And 3 times (Beam rebar, slab rebar & slab casting) of
QMD visit needed before a slab casting.

So, total visit with Report 121 times & Random visit without report
20 times (approximately) = 141 times (approximately).

** Special Thanks:

Head of DQM Division


Head of QMD
All QMD Engr.
All Project-in- Charge
Regards
Engr. Md. Rasheduzzaman
Deputy Executive Engineers
Quality Management Department