SUBJECT: System Planning Guide, System Mapping Guide
TO: REA Electric Borrowers and REA Electric Staff
EFFECTIVE DATE: Date of Approval
EXPIRATION DATE: Three years from effective date
OFFICE OF PRIMARY INTEREST: Distribution Branch, Electric Staff
Division
FILING INSTRUCTIONS: This Bulletin replaces Bulletin 40-4,
"Guide Mapping and Location Numbering, Electric Distribution Systems," dated July 8, 1974, which was rescinded by REA on December 18, 1991. File along with 7 CFR 1724 in the blue binders.
PURPOSE: The purpose of this bulletin is to provide guidance to
borrowers and engineers for the preparation of various maps and system diagrams required for facilities identification and location, planning and the operations of the electric distribution systems.
James B. Huff, Sr. 07/19/93
_______ _____________________________ __________________ Administrator Date Bulletin 1724D-103 Page 2
TABLE OF CONTENTS
1. Introduction
2. Purpose
Exhibit: Mapping Symbols
INDEX: System Planning Guide
Bulletin 1724D-103 Page 3
1. Introduction: A series of symbols, and their definitions,
pertaining to electrical lines, equipment, facilities and appurtenances used on electric utility power systems, and geographic and political mapping symbols and their definitions has been developed. They are attached to this bulletin as "Mapping Symbols."
1.1 It is suggested that REA electric borrowers adopt these
symbols as a standard and use them on maps and system diagrams which are furnished to REA for various reasons.
1.2 It is anticipated that the adoption and use of these
standard symbols will improve clarity and expedite reviews of maps and system diagrams furnished to REA.
2. Purpose: The purpose of this bulletin is to provide guidance
to borrowers and engineers for the preparation of various maps and system diagrams required for facilities identification and location, planning and the operations of the electric distribution systems.