Main Bus-1 Charging with running (Grid) Supply via Line-4 (bay-409)

Checklist
Sl.no
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Checklist for Synchornisation of GT-1 with Live Bus-1 (bay-412)


Sl.no
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

Main Bus-1 Charging with running (Grid) Supply via Line-4 (bay-409)
Checklist
Steps
220V DCDB and 415V ACDB condition in Switchyard Panel room
Outgoing feeders from 220V DCDB panel to switchyard relay Panels
Outgoing feeders from 415V ACDB panel to BMK
Outgoing supply MCBs in BMK and relay panels
Any Protection group/Trip relay not operated.
Busbar Protection not Operated
409-52 Trip coil-1&2 condition healthy
PTW closed if any.Physically ensure the area for clearance
Bay Earthswitches and Bus Earthswitch condition OPEN (Confirm Physically)
Physical inspection of CVT,CT for oil leakages & oil level respectively.
Physical check of SF6 gas pressure and Spring status
Earthswitch handle interlock castle key is restored
Check the selector switch is in MASTER mode physically in R-Ph isolators control cubicle
Check the selector switch is in MASTER mode physically in R-Ph earthswitches control cubicle
Ensure bay isolators, Earth switches and Circuit breaker close permissves satisfied

Checklist for Synchornisation of GT-1 with Live Bus-1 (bay-412)


Steps
220V DCDB and 415V ACDB condition in Switchyard Panel room
Outgoing feeders from 220V DCDB panel to switchyard relay Panels
Outgoing feeders from 415V ACDB panel to BMK
Outgoing supply MCBs in BMK and relay panels
Any Protection group/Trip relay not operated.
Busbar Protection not Operated and bus-1 live & healthy
412-52 Trip coil-1&2 condition healthy
PTW closed if any.Physically ensure the area for clearance
Bay Earthswitches and Bus Earthswitch condition OPEN (Confirm Physically)
Physical inspection of CVT,CT for oil leakages & oil level respectively.
Physical check of SF6 gas pressure and Spring status
Earthswitch handle interlock castle key is restored
Check the selector switch is in MASTER mode physically in R-Ph isolators control cubicle
Check the selector switch is in MASTER mode physically in R-Ph earthswitches control cubicle
Ensure bay isolators, Earth switches and Circuit breaker close permissves satisfied
No alarm or Trip in ECP and GRP relays are healthy
Ensure GT-1 area clearance physically and no oil leakage in GT-1
Ensure Surge Arrester of GT-1 is healthy and leakage current is minimum
Generator in running condition.Voltage,frequency and Phase sequence normal

Status
ON
ON
ON
ON
Ok
Ok
Ok
Ok
Open
Normal
OK/Charged
Ok
Ok
Ok
Ok

Status
ON
ON
ON
ON
Ok
Ok
Ok
Ok
Open
Normal
OK/Charged
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok