Compare Volume Prisma
Compare Volume Prisma
1
TAMPAK ATAS
Ruang kosong
No.
1
2
3
48,595.30
40
114,491.44
92,569.66
60
89,052.69
32,313.92
65
4
42,363.97
5
81,619.72
total 395,125.38 173,478.88
w1
w2
Volume (m3)
44.90
127.85
340.14
1,175,183.70
99.99
198.40
466.58
4,176,706.00
250.13
189.96
170.11
2,433,037.40
7,784,927.10
Dinding tegak
(tanpa
bench)
w
1
H
w2
No.
1
2
3
Luas Lahan
Luas Prisma
67,597.56
48,595.30
114,491.44
92,569.66
89,052.69
32,313.92
4
42,363.97
5
81,619.72
total 395,125.38
173,478.88
Volume rumus
(m3)
Minescape (m3)
1,175,183.70
1,255,801.13
4,176,706.00
3,590,108.25
2,433,037.40
716,994.75
7,784,927.10
5,562,904.13
Di persempit
mengikuti
kemiringan
bukit
Dinding highwall
masih tegak (tanpa
bench)
Volume
(m3)
35
AVG
TONASE
(1.8
kg/m3)
1,272,260.5
Top
surface
menggunakan
PIT 1
706,811.40 2
topografi hasil total station
Bottom surface
menggunakan
1,518,270.9
2,732,887.6
desain
final
pit
35
PIT 2
0
2
Jalan tambang ketika
pit mencapai elevasi dasar
(FINAL
PIT)
Tinggi bench:
5m
Lebar : 2 m
Kemiringan : 35
Grade Jalan : 7 %
Lebar jalan 10.5 m
Dinding highwall
dg bench
35
PIT 3
1,434,628.9
797,016.06 1
3,022,098. 5,439,777.
total
36
05
Jika kemiringan di buat 40 maka
Volumenya :
PIT LOM Kemiringan 40
AVG
Volume
TONASE
LOKASI
(1.8
(m3)
kg/m3)
PIT 1
1,026,745.6 1,848,142.1
1
0
Resume
Model 3 Dimensi
Prisma dg rumus
Prisma dg minescape
Desain PIT LOM 35
Desain PIT LOM 40
Volume (m3)
7,784,927.10
5,562,904.13
3,022,098.36
3,423,297.52
Average Tonase
(1.8 kg/m3)
14,012,868.78
10,013,227.43
5,439,777.05
6,161,935.54