Volume Prisma Trapesium dengan RUMUS

1
TAMPAK ATAS

LUAS IUP : 318,012 m2

Lahan 1 (67,597.56 m2)

Lahan 2 (114,491.44 m2)

Lahan 3 (89,052.69 m2)


TAMPAK SAMPING

Ruang kosong

No.
1
2
3

Luas Lahan Luas Prisma H


67,597.56

48,595.30

40

114,491.44

92,569.66

60

89,052.69

32,313.92

65

4
42,363.97
5
81,619.72
total 395,125.38 173,478.88

w1

w2

Volume (m3)

44.90

127.85

340.14

1,175,183.70

99.99

198.40

466.58

4,176,706.00

250.13

189.96

170.11

2,433,037.40

7,784,927.10

Dinding tegak
(tanpa
bench)

w
1
H

w2

Volume Prisma Trapesium Hasil Minescape

No.
1
2
3

Luas Lahan

Luas Prisma

67,597.56

48,595.30

114,491.44

92,569.66

89,052.69

32,313.92

4
42,363.97
5
81,619.72
total 395,125.38

173,478.88

Volume rumus
(m3)
Minescape (m3)
1,175,183.70

1,255,801.13

4,176,706.00

3,590,108.25

2,433,037.40

716,994.75

7,784,927.10

5,562,904.13

Di persempit
mengikuti
kemiringan
bukit

Dinding highwall
masih tegak (tanpa
bench)

Volume Desain PIT dengan Bench (Slope 35 & 40 )


PIT LOM
Kemiringan
LOKASI

Volume
(m3)

35
AVG
TONASE
(1.8
kg/m3)

1,272,260.5
Top
surface
menggunakan
PIT 1
706,811.40 2
topografi hasil total station
Bottom surface
menggunakan
1,518,270.9
2,732,887.6
desain
final
pit
35
PIT 2
0
2
Jalan tambang ketika
pit mencapai elevasi dasar
(FINAL
PIT)
Tinggi bench:
5m
Lebar : 2 m
Kemiringan : 35
Grade Jalan : 7 %
Lebar jalan 10.5 m

Dinding highwall
dg bench
35

PIT 3

1,434,628.9
797,016.06 1

3,022,098. 5,439,777.
total
36
05
Jika kemiringan di buat 40 maka
Volumenya :
PIT LOM Kemiringan 40
AVG
Volume
TONASE
LOKASI
(1.8
(m3)
kg/m3)
PIT 1

1,026,745.6 1,848,142.1
1
0

Resume

Resume Perbandingan volume dengan beberapa


cara perhitungan

Model 3 Dimensi
Prisma dg rumus
Prisma dg minescape
Desain PIT LOM 35
Desain PIT LOM 40

Volume (m3)
7,784,927.10
5,562,904.13
3,022,098.36
3,423,297.52

Average Tonase
(1.8 kg/m3)
14,012,868.78
10,013,227.43
5,439,777.05
6,161,935.54