You are on page 1of 1

SECOND FLOOR LIVE LOAD COMPUTATION - Frame I

From NSCP Section 205 Live Loads


Table 205-1 Minimum Uniform and Concentrated Live Loads

Span 1-2 - Storage Room and Amusement Tom's World (Recreational Area)
6.0 Kpa (3.5m) + 3.6 Kpa (4m) = 35.4 Kn/m
Span 2-3 - Restroom and Amusement Tom's World (Recreational Area)
2.4 Kpa (3.5m) + 3.6 Kpa (4m) = 22.8 Kn/m
Span 3-4 - Corridor and Amusement Tom's World (Recreational Area)
3.8 Kpa (3.5m) + 3.6 Kpa (4m) = 27.7 Kn/m
Span 4-5 - Corridor
3.8 Kpa (7.5m) = 28.5 Kn/m
Span 5-6,6-7 - Activity Area (Assembly Area)
4.8 Kpa (3.5m) = 16.8 Kn/m
Span 7-8 - Activity Area and Coffee Shop
4.8 Kpa (3.5m) + 4.8 Kpa (4m) = 36 Kn/m
Span 8-9 - Corridor
3.8 Kpa (7.5m) = 28.5 Kn/m
Span 9-10 - Supply store and RRJ Store
4.8 Kpa (7.5m) = 36 Kn/m
Span 10-11 - Bank Office
2.4 Kpa (3.5m) = 8.4 Kn/m
Span 11-12 - Corridor
3.8 Kpa (3.5m) = 13.3 Kn/m

Isolate Frame I

35.4 Kn/m
22.8 Kn/m

27.7 Kn/m

36 Kn/m

28.5 Kn/m

10

11

12

36 Kn/m
28.5 Kn/m

16.8 Kn/m

13.3 Kn/m
8.4 Kn/m

8.00

8.00

6.00

7.00

8.00

8.00

8.00

6.00

8.00

8.00

6.00

You might also like