You are on page 1of 2

KORBA WEST THERMAL POWER PROJECT

1 x 500MW (EXTENSION - STAGE III)

0802-FCE-DO-C0104

STAAD INPUT FILE FOR THRUST BLOCK & BEAMS SUPPORTING THRUST BLOCK FOR COOLING WATER
PUMPS
STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 09-Mar-11
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 0 0 0; 2 0 0 6.7; 3 0 0 3.35; 4 0 3.35 3.35;
MEMBER INCIDENCES
1 1 3; 2 3 2; 3 3 4;
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.17185e+007
POISSON 0.17
DENSITY 23.5616
ALPHA 1e-005
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
1 2 PRIS YD 1.2 ZD 1.2
MEMBER PROPERTY INDIAN
3 PRIS YD 3 ZD 1.2
CONSTANTS
BETA 90 MEMB 3
MATERIAL CONCRETE ALL
SUPPORTS
1 2 FIXED
LOAD 1 LOADTYPE None TITLE LOAD CASE 1
SELFWEIGHT Y -1 LIST 1 TO 3
MEMBER LOAD
1 2 UNI GY -45
1 2 UNI GY -11.481
LOAD 2 LOADTYPE None TITLE LOAD CASE 2
MEMBER LOAD
3 CON GX 1090 1.8
1 2 UNI GY -50.06
LOAD COMB 3 1.5DL+1.5LL
1 1.5 2 1.5
PERFORM ANALYSIS
PRINT ALL
****************************
START CONCRETE DESIGN
CODE INDIAN
CLEAR 0.05 MEMB 3
FC 25000 MEMB 3
FYMAIN 500000 MEMB 3
FYSEC 50000 MEMB 3
MAXMAIN 32 MEMB 3
MAXSEC 12 MEMB 3
MINMAIN 16 MEMB 3
MINSEC 8 MEMB 3
RATIO 4 MEMB 3
REINF 0 MEMB 3
BRACE 3 MEMB 3
TRACK 0 MEMB 3
ELZ 2 MEMB 3
ELY 2 MEMB 3
DESIGN COLUMN 3
****************************
CLEAR 0.05 MEMB 1 2
FC 25000 MEMB 1 2
FYMAIN 500000 MEMB 1 2
FYSEC 50000 MEMB 1 2
MAXMAIN 25 MEMB 1 2

KORBA WEST THERMAL POWER PROJECT


1 x 500MW (EXTENSION - STAGE III)

MAXSEC 12 MEMB 1 2
MINMAIN 16 MEMB 1 2
MINSEC 8 MEMB 1 2
TORSION 0 MEMB 1 2
TRACK 0 MEMB 1 2
DESIGN BEAM 1 2
END CONCRETE DESIGN
FINISH

0802-FCE-DO-C0104

You might also like