NTPC

RIHAND
STANDARD CHECKLIST:: SYSTEM COMMISSIONING

STATION: NTPC /RhSTPP-II (2 x 500 Mw) ; UNIT: _____


PLANT ITEM: MANUALLY OPERATAED GATES

SHEET

1 OF 2

Date -

Name of the system: ___________________ Plant area: ________________________


System Drawing No: __________________ Manufacturers Name:__________________
Location :
SN

_____________________ Serial No: ________________________


ACTIVITY

1.

The nameplate legend agrees with the approved NTPC Plant


Nomenclature, is clearly visible, securely fixed, is durable and
correlates with any remote labels.
Number: Title: -

2.

Check that access is safe for operational purpose and adequate


access for adjustments, maintenance and repairs.

3.

Illumination in the plant area is adequate.

4.

Check receipt of manufacturers test certificate


Record ref. no.-

The installation is complete and correct in accordance with the


latest drawings and specifications.

Lubricating facilities are satisfactory and the correct lubricants


have been applied.

Check the gate plate for its correct operation in the horizontal
plane and straightness of gate frame.

Check the location of the flat guide bars on the frame. The ends
should not interfere with the travel of the plate or be in the path of
movement.

Check the proper stroking of the gate plate.

10

Check the condition of packing in the gland.

STATUS
Yes / No

SCL REF: M VOL I SEC H/05

NTPC

RIHAND

STATION: NTPC /RhSTPP-II (2 x 500 Mw); UNIT:

SHEET 2 OF 2

PLANT ITEM: MANUALLY OPERATAED GATES


11 Check the length of the chain for easy operation.
Remarks:

SCL REF: M VOL I SEC H/05


Name
Agency
NTPC-Erection
NTPC-Commissioning

Signature

Date