Structural Steel Design Project: Calculation Sheet
Structural Steel Design Project: Calculation Sheet
Job No:
Sheet 1 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Structural Steel
Design Project
Calculation Sheet
Problem
Analyse and Design a single span portal frame with gabled roof. The frame
has a span of 15 m, the column height 6m and the rafter rise 3m. Purlins are
provided @ 2.5 m c/c.
D
5mc/c
3m
C
F
0.6 m
0.6 m
30 m
6m
3.25 m
G
15 m
15 m
Load
Dead Load
=
=
=
=
Total load /m 2
Version II
0.17 kN/m 2
0.025 kN/m 2
0.100 kN/m 2
0.100 kN/m 2
--------------0.395 kN/m 2
---------------
36 - {PAGE }
PORTAL FRAMES
Job No:
Sheet 2 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Structural Steel
Design Project
Calculation Sheet
Dead load/m run
1.2
= 0.395 * 5
= 1.975 kN / m
2.0 kN/m
Live Load
= 300 kN
= 300 kN
Weight of crab
= 60 kN
The extreme position of crane hook is assumed as 1 m from the centre line of
rail. The span of crane is approximately taken as 13.8 m. And the wheel
base has been taken as 3.8 m
1.3.1
Vertical load
The weight of the crane is shared equally by four wheels on both sides. The
reaction on wheel due to the lifted weight and the crab can be obtained by
taking moments about the centreline of wheels.
( 300 + 60 )
B
300
6.9 m
1m
13.8 m
MB = 0
Version II
36 - {PAGE }
PORTAL FRAMES
Structural Steel
Design Project
Calculation Sheet
Job No:
Sheet 3 of 30 Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
242 kN
3.8 m
5m
Transverse Load:
Version II
36 - {PAGE }
PORTAL FRAMES
Structural Steel
Design Project
Calculation Sheet
1.4
Job No:
Sheet 4 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Wind Load
Vz = k 1 k 2 k 3 Vb
Vz = 1 * 0.8 *1 * 50
Vz = 40 m/sec
Version II
36 - {PAGE }
PORTAL FRAMES
Job No:
Sheet 5 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Structural Steel
Design Project
Calculation Sheet
(b) External pressure coefficient
External pressure coefficient for walls and roofs are tabulated in Table 1 (a)
and Table 1(b)
1.4.2
h
w
w
elevation
plan
For walls, A pd = 30 * 0.96 = 28.8 kN
Table 1 (a): Total wind load for wall
Wind
Angle
Cpe
Cpi
Windward
Leeward
00
0.7
-0.25
900
-0.5
-0.5
0.2
-0.2
0.2
-0.2
Cpe Cpi
Wind
ward
Lee
ward
Total wind(kN)
(C pe-Cpi )Apd
Wind
Lee
ward
ward
0.5
0.9
-0.7
-0.3
-0.45
-0.05
-0.7
-0.3
14.4
25.9
-20.2
-8.6
-12.9
-1.4
-20.2
-8.6
Version II
(3.0 ) 2
+ (7.5) 2 = 40.4 m 2
36 - {PAGE }
PORTAL FRAMES
Job No:
Sheet 6 of 30 Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Structural Steel
Design Project
Calculation Sheet
For roof, Apd = 38.7 kN
Pressure Coefficient
900
2.0
Cpe
Cpe
Cpi
Wind
-0.328
-0.328
-0.7
-0.7
Lee
-0.4
-0.4
-0.7
-0.7
0.2
-0.2
0.2
-0.2
Cpe Cpi
Wind
ward
Lee
ward
-0.528
-0.128
-0.9
-0.5
-0.6
-0.2
-0.9
-0.5
Structural Steel
Version II
Job No:
Sheet 7 of 30 Rev
Job Title: Portal Frame Analysis and Design
36 - {PAGE }
PORTAL FRAMES
Design Project
Worked Example: 1
Made By
Date
PU
Checked By
Calculation Sheet
Date
VK
3.1
Load Factors
m = 1.15
4.0
Analysis
In this example, the following load combinations are considered, as they are
found to be critical.
Similar steps can be followed for plastic analysis under other load
combinations.
(i)
Structural Steel
Version II
Job No:
Sheet 8 of 30
Rev
Job Title: Portal Frame Analysis and Design
36 - {PAGE }
PORTAL FRAMES
Design Project
Worked Example: 1
Made By
Date
PU
Checked By
Calculation Sheet
(ii)
Date
VK
Structural Steel
Version II
Job No:
Sheet 9 of 30
Rev
Job Title: Portal Frame Analysis and Design
36 - {PAGE }
PORTAL FRAMES
Design Project
Worked Example: 1
Made By
Date
PU
Checked By
Calculation Sheet
H/2 @ eaves points
Date
VK
= 0.62/2 = 0.31 kN
Intermediate
Points
Eaves
Ridge
4.1.2
Crane Loading
Moment @ B
= 1.5 * 225 = 337.5 kNm
Moment @ F
= 1.5 * 82 = 123 kNm
Horizontal load @ B & @ F = 1.5 * 13.9 = 20.8 kN
Note: To find the total moment @ B and F we have to consider the moment
due to the dead load from the weight of the rail and the gantry girder. Let us
assume the weight of rail as 0.3 kN/m and weight of gantry girder as 2.0
kN/m
2 + 0.3
Dead load on the column = 2 * 5 = 5.75 kN
Structural Steel
Version II
Job No:
Sheet 10 of 30
Rev
Job Title: Portal Frame Analysis and Design
36 - {PAGE }
PORTAL FRAMES
Worked Example: 1
Made By
Design Project
Date
PU
Checked By
Calculation Sheet
Date
VK
5.2 kN
0.62 kN
5.2 kN
0.62 kN
2.6 kN
0.31 kN
3m
128
342
6m
20.8 kN 20.8 kN
3.25 m
27.2 kN
1.5 kN
15 m
4.2.1
Structural Steel
Version II
Job No:
Sheet 11 of 30
Rev
Job Title: Portal Frame Analysis and Design
36 - {PAGE }
PORTAL FRAMES
Design Project
Worked Example: 1
Made By
Date
PU
Checked By
Calculation Sheet
4.2.2
Date
VK
Crane Load
= 128 kNm
13.5 kN
13.5 kN
13.5 kN
13.5 kN
13.5 kN
3m
6.8 kN
128
342
20.8 kN
6m
20.8 kN
3.25 m
15 m
Factored Load (1.35 D.L + 1.5 C.L + 1.05 L.L)
4.3
Mechanisms
Beam mechanism
Sway mechanism
Gable mechanism and
Combined mechanism
Structural Steel
Version II
Job No:
Sheet 12 of 30
Rev
Job Title: Portal Frame Analysis and Design
36 - {PAGE }
PORTAL FRAMES
Design Project
Worked Example: 1
Made By
Date
PU
Checked By
Calculation Sheet
4.3.1
Date
VK
Beam Mechanism
(1) Member CD
Case 1: 1.35 D.L + 1.5 C.L + 1.05 W.L
4.7 kN
0.19 kN
5.2 kN
0.62 kN
5.2 kN
/2
0.62 kN
2.6 kN
0.31 kN
Structural Steel
Version II
Job No:
Sheet 13 of 30
Rev
Job Title: Portal Frame Analysis and Design
36 - {PAGE }
PORTAL FRAMES
Worked Example: 1
Made By
Design Project
Date
PU
Checked By
Calculation Sheet
Date
VK
13.5 kN
13.5 kN
13.5 kN
/2
6.8 kN
= 16.9 kNm
11
Wi = M p + M p +
+ M p
13
13
20.8 kN
= 3.69 M p
11 /13
27.2 kN
Structural Steel
Version II
Job No:
Sheet 14 of 30
Rev
Job Title: Portal Frame Analysis and Design
36 - {PAGE }
PORTAL FRAMES
Design Project
Worked Example: 1
Made By
Date
PU
Checked By
Calculation Sheet
Date
VK
11
11
1
11
+ 342 * + * 27.2 * 3.25
13
13
2
13
= 383.9
Equating Wi = We, we get
3.69 Mp = 383.9
Mp = 104.1 kNm.
(3) Member EG
Internal Work done,
342 kNm
11
11
Wi = M p + M p +
+ M p
13
13
= 3.69 M p
20.8 kN
11 /13
External Work done,
We = 20.8* 3.25 *
21.2 kN
11
1
11
+ 342 * + (21.2) * 3.25
13
2
13
= 428.3
Equating Wi = We, we get
3.69 Mp = 428.3
Structural Steel
Version II
Job No:
Sheet 15 of 30
Rev
Job Title: Portal Frame Analysis and Design
36 - {PAGE }
PORTAL FRAMES
Worked Example: 1
Made By
Design Project
Date
PU
Checked By
Calculation Sheet
Date
VK
Mp = 116.1 kNm
For members AC & EG, the 1st load combination will govern the failure
mechanism.
4.3.2
Panel Mechanism
5.2
0.62
0.31
0.19
5.2
0.62
4.2
1.0
4.2
1.0
2.6
342 kNm
2.1
0.5
128 kNm
20.8 kN
20.8 kN
27.2 kN
1.5 kN
Structural Steel
Version II
Job No:
Sheet 16 of 30
Rev
Job Title: Portal Frame Analysis and Design
36 - {PAGE }
PORTAL FRAMES
Worked Example: 1
Made By
Design Project
Date
PU
Checked By
Calculation Sheet
Date
VK
5.2
0.62
2.6
0.31
5.2
0.62
4.7
0.19
4.2
1.0
4.2
1.0
2.1
0.5
342 kNm
128 kNm
20.8 kN
27.2 kN
20.8 kN
1.5 kN
Structural Steel
Version II
Job No:
Sheet 17 of 30
Rev
Job Title: Portal Frame Analysis and Design
36 - {PAGE }
PORTAL FRAMES
Worked Example: 1
Made By
Design Project
Date
PU
Checked By
Calculation Sheet
Date
VK
13.5
13.5
6.8
342
128
kNm
kNm
20.8 kN
20.8 kN
= 40.6 kNm
Structural Steel
Version II
Job No:
Sheet 18 of 30
Rev
Job Title: Portal Frame Analysis and Design
36 - {PAGE }
PORTAL FRAMES
Worked Example: 1
Made By
Design Project
Date
PU
Checked By
Calculation Sheet
Date
VK
/2
/2
12 m
5.2
0.62
2.6
5.2
0.62
4.7
0.19
4.2
1.0
4.2
1.0
2.1
0.31
0.5
342 kNm
128 kNm
20.8 kN
20.8 kN
27.2 kN
/2
1.5 kN
Structural Steel
Version II
36 - {PAGE }
PORTAL FRAMES
Worked Example: 1
Made By
Design Project
Date
PU
Checked By
Calculation Sheet
Date
VK
Equating Wi = We
4Mp = 411.86
Mp = 102.9 kNm
(ii) Internal work done, Wi = Mp /2 + Mp ( /2 +/2) + Mp ( /2 + )
+Mp
Wi = 4Mp
/2
/2
12 m
5.2
0.62
2.6
5.2
0.62
4.7
0.19
0.31
4.2
1.0
4.2
1.0
2.1
0.5
342 kNm
128 kNm
20.8 kN
20.8 kN
/2
27.2 kN
Structural Steel
Version II
1.5 kN
Job No:
Sheet 20 of 30
Rev
Job Title: Portal Frame Analysis and Design
36 - {PAGE }
PORTAL FRAMES
Worked Example: 1
Made By
Design Project
Date
PU
Checked By
Calculation Sheet
Date
VK
+ 342* + * 27.2 * 6 0.31* 6 * 0.62* 7 *
2
2 2
2
2
2
+ 1.0 * 11* + 0.5* 12* + 4.2 * 5.0* + 4.2* 2.5* + 20.8* 3.25 128 *
2
2
2
2
1
+ * 1.5* 6
2
= 251.35
We = 20.8 * 3.25 *
/6
/6
36 m
0.31
5.2
0.62
2.6
5.2
0.62
4.7
0.19
4.2
1.0
4.2
1.0
2.1
0.5
342 kNm
128 kNm
20.8 kN
27.2 kN
20.8 kN
5 /6
Structural Steel
Version II
1.5 kN
Job No:
Sheet 21 of 30
Rev
Job Title: Portal Frame Analysis and Design
36 - {PAGE }
PORTAL FRAMES
Design Project
Worked Example: 1
Made By
Date
PU
Checked By
Calculation Sheet
Date
VK
= M p + M p +
+ M p + + M p ( )
6
6
6
6
= 4M p
External Work done, We =
5
5 1
5
5
20.8*3.25 * + 342 *
+ * 27.2 * 6 *
0.31* 6 *
0.62* 35 *
6
2
6
6
6
6
= 97.7 kNm
2
2
Wi = M p + M p + + M p + + M p ( )
3
3
3
3
= 4M p
Structural Steel
Version II
Job No:
Sheet 22 of 30
Rev
Job Title: Portal Frame Analysis and Design
36 - {PAGE }
PORTAL FRAMES
Worked Example: 1
Made By
Design Project
Date
PU
Checked By
Calculation Sheet
Date
VK
/3
/3
18 m
0.31
5.2
0.62
2.6
5.2
0.62
4.7
0.19
4.2
1.0
4.2
1.0
2.1
0.5
342 kNm
128 kNm
20.8 kN
20.8 kN
2 /3
27.2 kN
1.5 kN
2
2
2
0.62* 7 * 0.62 * 16 * + 0.19*15 * + 5.2 * 2.5* + 5.2* 5 *
3
3
3
3
3
Structural Steel
Version II
Job No:
Sheet 23 of 30
Rev
Job Title: Portal Frame Analysis and Design
36 - {PAGE }
PORTAL FRAMES
Worked Example: 1
Made By
Design Project
Date
PU
Checked By
Calculation Sheet
Date
VK
(i)
/6
/6
36 m
13.5
13.5
13.5
13.5
13.5
6.8
6.8
342
128
20.8 kN
20.8 kN
5 /6
/6
5 /6
5
5
= 4M p
Structural Steel
Version II
Job No:
Sheet 24 of 30
Rev
Job Title: Portal Frame Analysis and Design
36 - {PAGE }
PORTAL FRAMES
Worked Example: 1
Made By
Design Project
Date
PU
Checked By
Calculation Sheet
Date
VK
/3
/3
18 m
13.5
13.5
13.5
13.5
13.5
6.8
6.8
342
20.8 kN
2 /3
128
20.8 kN
2 /3
Structural Steel
Version II
Job No:
Sheet 25 of 30
Rev
Job Title: Portal Frame Analysis and Design
36 - {PAGE }
PORTAL FRAMES
Design Project
Worked Example: 1
Made By
Date
PU
Checked By
Calculation Sheet
Date
VK
2
2
Wi = M p + M p + + M p + + M p ( )
3
3
3
3
= 4 M p
External Work done, We=
2
2
2
2
20.8 * 3.25 * + 342 * + 13.5 * 2.5 * + 13.5 * 5.0 * + 13.5 *7.5 * +
3
3
3
3
3
= 86.9 kNm
Plastic hinged is formed at 4 and 7
= 4 M p
Structural Steel
Version II
Job No:
Sheet 26 of 30
Rev
Job Title: Portal Frame Analysis and Design
36 - {PAGE }
PORTAL FRAMES
Worked Example: 1
Made By
Design Project
Date
PU
Checked By
Calculation Sheet
Date
VK
/2
/2
12 m
13.5
13.5
13.5
13.5
13.5
6.8
6.8
128
342
20.8 kN
20.8 kN
/2
/2
Equating Wi = We
4Mp = 296.3
Mp = 74 kNm
Structural Steel
Version II
Job No:
Sheet 27 of 30
Rev
Job Title: Portal Frame Analysis and Design
36 - {PAGE }
PORTAL FRAMES
Worked Example: 1
Made By
Design Project
Date
PU
Checked By
Calculation Sheet
(iv)
Date
VK
= M p + M p + + M p ( + ) + M p ( )
2
2
Wi = 5 M p
13.5
13.5
13.5
13.5
6m
13.5
6.8
342
20.8 kN
128
/2
kN
20.8 kN
/2
Structural Steel
Version II
Job No:
Sheet 28 of 30
Rev
Job Title: Portal Frame Analysis and Design
36 - {PAGE }
PORTAL FRAMES
Design Project
Worked Example: 1
Made By
Date
PU
Checked By
Calculation Sheet
Date
VK
Equating Wi = We
5Mp = 346.9 *
Mp = 69.4 kNm
Design Plastic Moment = 116.1 kNm.
5.0 DESIGN
For the design it is assumed that the frame is adequately laterally braced so
that it fails by forming mechanism. Both the column and rafter are
analysed assuming equal plastic moment capacity. Other ratios may
be adopted to arrive at an optimum design solution.
5.1 Selection of section
Plastic Moment capacity required= 116 kNm
Required section modulus, Z = Mp / f yd
116*106
=
250
1.15
= 533.6 * 10 3 mm 3
From IS: 800-1984 (Annexure F)
ISMB 300 @ 0.46 kN/ m provides
Zp = 683 * 10-3 mm3
b = 140 mm
Ti = 13.1 mm
A = 5.87 * 10 3 mm2
t w =7.7 mm
rxx =124 mm
ryy =28.6 mm
Structural Steel
Version II
Job No:
Sheet 29 of 30
Rev
Job Title: Portal Frame Analysis and Design
36 - {PAGE }
PORTAL FRAMES
Design Project
Worked Example: 1
Made By
Date
PU
Checked By
Calculation Sheet
Date
VK
T1
136
fy
bf = 140/2 = 70 mm
T1 = 13.1 mm
t = 7.7 mm
bf
T1
70
= 5.34 < 8.6
13.1
Web
d1 1120 1600 P
t
f y Py
f y
300 1120
1600
(0.27 )
7.7 250y
250 y
38.9 68,Hence O. K
5.2.2 Effect of axial force
Maximum axial force in column, P = 40.5 kN
Structural Steel
Version II
Job No:
Sheet 30 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
36 - {PAGE }
PORTAL FRAMES
Design Project
Made By
Date
PU
Checked By
Calculation Sheet
Date
VK
Version II
36 - {PAGE }