PLANNING
DEVELOPMENT
Block 5 Lot 4 Jupiter St. Sunnyside Hts. Batasan Hills, QC
JULY 4,2013
To:
Re:
Dear Sir,
This billing is for the Construction of Steel and Spandek Perimeter Fence at
Evia Commercial Area (125 linear meter). The details:
30 pcs. #2 BI Pipe
20 pcs. #1 1/4 BI Pipe
25 pcs. #1 1/2 GI Pipe
95 pcs. 10 ft. long Spandek
1500 pcs. Tekscrew 1 1/2
40 bags Cement
4 cu.m. 3/4 Gravel
2.5 cu.m. White Sand
8 gal.
Red Oxide
1
lot
Power Tools & Hardware
MATERIAL COST:
LABOR COST:
SUB-TOTAL:
TAXES PROVISIONS:
MARK-UP:
GRAND TOTAL:
Thanks!
Floro Regencia
Php
Php
Gen Manager
MENT, INC.
CONSTRUCTION
26,400.00
7,700.00
16,250.00
90,250.00
2,250.00
13,200.00
4,200.00
2,375.00
4,160.00
15,000.00
181,785.00
63,000.00
244,785.00
10,500.00
25,000.00
280,285.00
30 pcs. #2 BI Pipe
20 pcs. #1 1/4 BI Pipe
25 pcs. #1 1/2 GI Pipe
95 pcs. 10 ft. long Spandek
1500 pcs. Tekscrew 1 1/2
40 bags Cement
4 cu.m. 3/4 Gravel
2.5 cu.m. White Sand
8 gal.
Red Oxide
1
lot
Power Tools & Hardware
MATERIAL COST:
LABOR COST:
SUB-TOTAL:
TAXES PROVISIONS:
MARK-UP:
GRAND TOTAL:
Php
Php
18,880.00
6,800.00
14,800.00
79,900.00
1,890.00
11,995.00
3,800.00
2,115.00
3,985.00
8,000.00
152,165.00
40,000.00
192,165.00
8,500.00
19,216.50
219,881.50
Project
Location
Date
ITEM
1
2
3
4
5
6
7
8
9
10
QUANTITY
BI Pipe #2
BI Pipe #1 1/4
GI Pipe #1 1/2
Spandek 10 ft.
Tekscrew 1 1/2
Cement
Gravel 3/4
White Sand
Red oxide
Power Tools & Hardware
UNIT
30
pcs.
20
pcs.
25
pcs.
95
pcs.
1500
pcs.
40 bags
4 cu.m.
2.5 cu.m.
8
gal
1
lot
MATERIAL COST
LABOR COST
TAXES
MARK-UP
GRAND TOTAL
NEGO. PRICE:
Prepared by:
CHLEI CONSTRUCTION
& DEVT., INC.
26,400.00
7,700.00
16,250.00
90,250.00
2,250.00
13,200.00
4,200.00
2,375.00
4,160.00
15,000.00
181,785.00
63,000.00
10,500.00
25,000.00
Php280,285.00
Php215,000.00
Noted by:
ENGR. AL CHUA
IN-HOUSE
18,880.00
6,800.00
14,800.00
79,900.00
1,890.00
11,995.00
3,800.00
2,115.00
3,985.00
8,000.00
152,165.00
40,000.00
8,500.00
19,216.50
Php219,881.50
Approved by: