Professional Documents
Culture Documents
3. Operate Generator:
KERRY supervisor/s should operate the generator set to
resume the power inside the factory.
Remarks:
4. Resume Operation/s:
Once the power resumes, continue activities inside the
factory.
Remarks:
CHECK
LIST
TIME