EMERGENCY DRILL LEVEL 1 at HDPE PLANT
Objective:
1. Raising up awareness of employees of Long Son Petrochemical Co., Ltd and Contractors at HDPE area in emergency case
2. Practice of emergency response plan and the facility equipment at HDPE Plant
3. Practice communication of SECL & LSP in case of emergency happen
4. Enhancing readiness, commanding, and operating capability on firefighting.
Detail of Scenario:
At 15:00 Pm of normal operation day in HDPE Plant, leak observed by site
SECL Commissioning Supervisor at butane line at top of R-201. SECL COM
proceed site, verify leak point and leak can not stop, Immediately deploy
SECL ERT. SECL COM request SECL supervisor to stop leak but unsuccessful.
He inform LSP shift supervisor and update information to LSP Dept.
Mangr..[Due to breakdown of operating equipment, uncontrolled flammable
gas were leak, ignition occurs, and fire happens]. Evacuation announce and
personnel proceed to muster point.
SECL COM & LSP Shift Supervisor set up command post. LSP Shift Spvr
(OSC-2) request LSP DCS operator and FO to activate fire fighting system. 1
SECL was burned at left hand & collapsed & LSP OSC call ECC to request
support from LSP. LSP ERT arrive incident location & coordinate with SECL &
HDPE operation to control the scene. After 3 minute, HDPE-BM close all
ESDs & LSP ERT cooling area & the fire under control.
1st Reactor HDPE Plant : Leak & Firefighting Drills at R-201
1. SECL CoS 1. SECL CoS found leak point on Butane-1/Propylene line at the top of reactor R-201 & Activate Manual call point
2. SECL CoS (MCP) 20-FH-MN-4-06
To confirm
3. LSP BM
situation and 2. SECL Cos inform SECL BM & SECL BM inform to LSP BM about situation
LSP Unit Sup
activate the 3. LSP Boardman inform to unit supervisor & he require LSP BM to close supply valve (FV-222). LSP unit sup call LSP
4. LSP Unit sup
1. 15.00 emergency FO to come to site to check & support.
5. SECL CoS &
procedure
4. LSP Unit Supervisor require LSP Boardman to Stop all works at site & evacuate to nearest assembly point by IPAS.
SECL CoM
5. SECL CoS inform CoM to proceed to site for inspection and found that the leak point & cannot stop & CoM call SECL
ERT leader to deploy SECL ERT
1. SECL CoM
1. SECL CoM requests SECL CoS use liquid gasket to stop leak [but unsuccessful].
2. SECL CoS
2. Suddenly the leak point becomes bigger and leak too much gas. The SECL CoS quickly escape from the area.
Unfortunately, he slip & fall at the stair under reactor. (Broken Left leg) Then he rescued by SECL ERT to safe
3. LSP Unit Sup Update
location
4. LSP Unit sup information to
15.05 3. LSP unit supervisor call LSP Dept Manager to make decision to shutdown due to the big vapor cloud at site.
2. 5. LSP BM LSP Operation
6. SECL CoM & team 4. LSP Shift supervisor request to LSP BM press ESD button [At that time, the generation of sparks from the operating
LSP Unit Sup equipment or due to a breakdown in combination with the leaking flammable vapor cause’s fire. ] If ESD can not
work as normal, LSP FO & LSP ERT have to isolate by Manual Valve.
5. LSP Boardman inform Tank Farm Boardman to cut flow of [ALL] Raw materials
6. SECL COM & LSP Unit Supvr. set up Command Post at scene
Scenario Timeline
1. SECL ERT leader 1. SECL ERT Leader Assign SECL ERT to open 2 fix monitor {WM-813(Broken)/WM-824} to cool down
the area & Deploy 1 hose to cooling down by FH 839.
2. SECL ERT Leader
2. SECL ERT leader assign 2 worker to close gate valve of storm pit.
3. LSP Unit Sup & LSP
3. Cooling down area 3. LSP supervisor request LSP BM to activate deluge valve {tag name: DV-809/DV-810} to cooling
15.10 FO
down reactor area & LSP FO deploy 1 hose line from FH 827.
4. SECL ERT & LSP Operation can not control the fire, LSP Supervisor request support from
4. SECL ERT
ECC ( LSP-ERT) and LSP Shift Supervisor update situation to LSP Dept Manager
1. LSP Unit Sup 1. LSP Unit supervisor call LSP ECC by radio and request support from LSP ERT
2. ECC Staff
Update situation to ECC 2. ECC staff inform to ERT & EMT follow the communication flow.
15.15 3. ECC Staff
4. & On call team 3. ECC staff activate On call team by send the message to group. ( On call team has come to CCB
within 45 minutes in case of emergency )
1. LSP Medical Team 1. LSP Medical transfer IP to LSP center & update to ECC staff & ECC staff update to LSP Management
2. SECL OSC 2. SECL OSC follow up and summarize number of SECL Personnel from assembly point then update to
3. LSP Operation LSP OSC [include IP status]
Rescue IP and Head
6. 4. LSP OSC 3. LSP Operation team carry out head count at CCB-Poly by radio.
15.25 count and report
5. LSP Fire Chief 4. LSP OSC follow up and summarize SECL & LSP site personnel and update to LSP Dept Manager.
5. LSP Fire chief update to ECC staff & ECC staff update to LSP Emergency Management Team (Follow
Communication Chart).
1. SECL, HDPE Op & LSP ERT have controled the fire.
1. All Team 2. Because of heat & high temprature so all team maintain cooling down the area
2. All Team 3. LSP Fire Chief assign 2 firemen to go to incident location to carry out gas monitoring & confirm
7. 15.30 Stop the fire
3. LSP Fire Chief oxygen 20.9% & another reading are 0.
4. LSP Fire chief
4. LSP fire chief update to LSP OSC & SECL OSC that area is safe
1. LSP Unit Sup & Dept 1. LSP OSC ask permission of Dept Manager to back to normal & He agreed.
Manager 2. LSP OSC request to LSP BM to Announce emergency done and Announce back to
8. 15.35 Confirm back to normal
2. LSP Unit Sup (OSC) Normal by IPAS
3. LSP BM
3. LSP BM activate IPAS to announce back to normal flow standard message
9. 15.40 1. All Team Investigation & Recovery 1. LSP-Fire chief , ERT & SECL OSC conduct the investigation & make the recovery plan
INTERNAL & EXTERNAL COMMUNICATION OF LSP & SECL
SECL Team LSP Emergency management team
HDPE
supervisor TFU BM
SECL COM (OSC
(OSC no.2) LSP D-GD
no.1)
WKTK TFU
Mr Paisan L.
Mr. Clark
Or LSP HSSE
(Duty N/S- ECC Staff
Refer on shifting sched.) Manager LSP GD
Mr. Prasert Mr. Tharna
LSP ER
SECL ER Team
Team Pre-com HSSE
Manager
Mr. Trung LSP Fire
Chief Mr. Montree
SECL LSP
LSP
Medical Medical
Emergency
Team Team
On Call Team Within 45 Minutes
Ms. Dung Ms. Ha
IC, D-IC, HSSE,
CCB-Poly
Welfare &
Mutual Team
Level 1
LSP Emergency Organization
BRVT PC
Chairman
Coordinate Incident Commander
(IC)
* P. Witoon
P. Nathika
Finance/
Accounting
Business Supply Chain Communication team
Brand/GA/CSR/IT
* Draft Message
with Brand Management
(Business impact) & Government Affair (GA)
Approve by GD
Authority related
Case
(References ERP)
Incident commander
(IC)
Coordinate Deputy Incident commander
(D-IC)
* P. Surachet
Inform Authority
From Fire Police (On call duty)
1. LSPC
Bundit &
P. Ball
SHE Technical Team
* Process Technical Team
2. VTPC
3. BRVTPC
4. LS Police
Evacuation and
Administration Team
Welfare Team
* Mutual Coordinate
Team
* P. Chanathip
5. VT Police
6. MONRE
7. DONRE
P. Sayan
8. DOIT
9. NAVYBASE Z.2
External On Scene
Commander Coordinate
Internal On Scene
Commander
Safety & Envi
Impact team
* Assembly Team
(By area)
Emergency resources
supply Team
10. LS Border Guard
VTFP Initial Attack Team EPC Initial Attack Team * • On call duty
• Work online
As require
• Work on scene
BRFP Process Isolation Team
• Authority action
As require Note : All function need to come to site all Function
Navy Base LSP Firefighting team • Acknowledge &
As require prepare response
Medical team
7
LSP Emergency On Call Duty
Young Hoon Jeong Project Control Manager/Incident commander (IC) On time call 0896461666
Seong Min Han Field Control Manager/ Deputy IC On time call 0706584011
Dang The Trung Site safety coordinator/ERT Leader On time call 0939050535
Pham Gia Hung Site Commissioning Safety Supvr.(evacuation leader) On time call 0985248602
Wind direction
Fire water source and Firefighting equipment arrangement Level I
LSP OSC, SECL OSC & Fire Chief Control at site & update situation
LSP Fire truck
LSP Operation Deploy 1 hose line from FH 827
Ambulance
Fire water
Monitor
Add picture of
Fire truck
Manual Valve
1st Reactor
Fire water
Hydrant
ESD 001: PLANT SHUT DOWN
HS I
3PB-4 001
• Off gas compressor C-302 (I-305)
• Flare gas compressor C-881A/B
Stop (I-881)
• P-708A/B (I-702)
Evaluate area
impact by Fire 15:30 PM: Sluice gate valves be
fighting water closed to isolate, and prevent
water flows to common
drainages
Fire location
03:00PM, fire Occurs
Deluge Valve
> 20-DV-808
Command post location
> 20-DV-809
> 20-DV-810
Water Monitor
>20-WM-824 Windsock
>20-WM-813
Observe & Take Picture
Location Observer Remarks (evaluate the phases of drill, not limited with the following key checkpoints)
a. Verify the sequential communication flow from the detection of leak and fire, exact location of emergency,
confirmation of incident to DCS.
1. Leak and fire point Tam b. Skills of ERT team in operating fire fighting system.
c. Condition of Fire fighting system
a. To check the communication flow from the PIC at emergency location to LSP-EMT.
2. DCS-CCB Binh b. Effectiveness of communication materials; Radio, DCS..etc
c. Head count at CCB
a. The capability of OSC’s to handle situation (strategy..etc.)
3. Incident Command Post Yen b. Correct Post location
c. Wind Speed
a. To check security protocol during emergency (close security gate upon emergency alarm is sounded)
b. Security to check the IN and OUT of vehicles.
5. Security main gate Cuong c. Ability to handle traffic situation
d. Prohibit the unauthorize entry of personnel.
TimeLine