SOX-F39 / 00

SITE: GIPCL/SLPP

DAILY STATUS REPORT FOR COMMISSIONED UNIT UNIT : 3

REPORT NO.: 015


PS-WR
DATE: 4/07/2010

01 MAXIMUM LOAD (for the day) : 125 MW

02 RUNNING HOURS SINCE LAST SYNC. : 66.48 hr

03 CUMULATIVE RUNNING HOURS : 1071 hrs 30 min


(Since First Synchronising)

04 GENERATION (For the day) (million units) : 2.882 mu

05 CUMULATIVE GENERATION : 87.476mu


(since First synchronising)(million units)

06 NUMBER OF TRIPS FOR THE DAY : 0

07 CUMULATIVE NO. OF TRIPS : 19

08 TIME OF TRIPPING : N/A

09 TIME OF SYNCHRONISING : na

10 TRIP / FAILURE OF ANY MAJOR


COMPONENT WITH DETAILS (ENCLOSED): EBFP

11 REASON FOR TRIPPING : NA

12 CONSTRAINT FOR FULL LOAD


OPERATION : NA

13 NEW EQUIPMENTS / SYSTEM /


AUTO LOOP COMMISSIONED OR
UNDER COMMISSIONING :
14 ABNORMAL OPERATION, IF ANY : Vacuum pumps casing leakage/ESP hoppers chocked

15 MAJOR JOBS DONE IF UNIT


IS UNDER SHUTDOWN :

16 VISIT OF MFG. UNIT /


SUPPLIER’S REPRESENTATIVE :

17 ASSISTANCE REQUIRED : YES


__________________________________________________________________________________________
Signature…………………
UCE/(Site Incharge)
Ref: PW: SLP/05
Date: 4/07/2010
Distribution: Head (TSX) , Head (PMX)

BHARAT HEAVY ELECTRICALS LTD., POWER SECTOR WESTERN REGION