FAST PLANETS ENGINEERING DESIGN CONSULTANTS

Name of Site/Project/Contractor : ZJZ684_A/Coverage Improvement & 3G Project/MSE

TOWER COMPARISON REPORT @ 39 M/S


h of tower = 36.58 m
GH = 0.65 + 0.60/(h/10)^1/7 Gust Response Factor
GH = 1.008855866 1.0 < GH < 1.25 Sec 2.3.4.1 TIA-EIA-222-F

GH = 1.008 Input Value

Kz = (z/10)^2/7 Exposure Coefficient


Kz = > 1.0 < 2.58 Sec 2.3.3. TIA-EIA-222-F

ORIGINAL DESIGNED ANTENNA LOADS @ 39 M/S

Exposure Coeff . Basic WL Antenna WL Base Moment


S No Design Loads Size Dept Quantity z 1<Kz<2.58 Fa = CC*AA Fa*GH*Kz*no Fa*GH*Kz*no*z
1 GSM 900 MHZ GSM 6 35.1 1.4315095286 0.886 7.670783891 269.2445146
2 M/W 1.20 DIA. M/W 1 32 1.39418802707 1.39 1.953424728 62.50959131
3 M/W 2.40 DIA. M/W 1 32 1.39418802707 5.56 7.813698914 250.0383652
Total 8 Total 581.79

ACTUAL & EXISTING ANTENNA LOADS @ 39 M/S

Exposure Coeff . Basic WL Antenna WL Base Moment


S No Design Loads Size Dept Quantity z 1<Kz<2.58 Fa = CC*AA Fa*GH*Kz*no Fa*GH*Kz*no*z
1 LR GSM 1 37.58 1.45970518553 0.094 0.138309986 5.197689264
2 GSM 900 MHZ GSM 6 35 1.4303431494 0.886 7.664533816 268.2586835
3 3G GSM 3 35 1.4303431494 0.668 2.889338933 101.1268626
4 VP GSM 3 35 1.4303431494 0.194 0.839119391 29.36917867
5 MW 0.30 DIA MW 1 27 1.32813012447 0.149 0.19947452 5.385812031
6 MW 0.30 DIA MW 1 26 1.31388660641 0.149 0.197335257 5.130716687
7 MW 0.20 DIA MW 1 24.5 1.2917686794 0.066 0.085938787 2.105500274
8 MW 0.30 DIA MW 1 24 1.28418133029 0.149 0.192873762 4.628970297
MW 0.30 DIA MW 1 23 1.26866115587 1.39 1.777546519 40.88356993
Total 18 Total 462.09

PROPOSED ADDITIONAL ANTENNA LOADS @ 39 M/S

Exposure Coeff . Basic WL Antenna WL Base Moment


S No Design Loads Size Dept Quantity z 1<Kz<2.58 Fa = CC*AA Fa*GH*Kz*no Fa*GH*Kz*no*z
1 NEW M/W 0.60 DIA MW 1 31 1.38159908179 0.149 0.207505129 6.432659008
Total 1 Total 6.43

Grand Total 19 Grand Total 468.52

Designed Antenna Loads > Actual & Existing Antenna Loads + Proposed Additional Antenna Loads
581.7925 > 468.5196424
Therefore OK!
FAST PLANETS ENGINEERING DESIGN CONSULT

Name of Project :
Programmed by : FCFalgui

TOWER COMPARISON REPORT @ 39


h of tower = 34 m
GH = 0.65 + 0.60/(h/10)^1/7 Gust Response Factor
GH = 1.012624 1.0 < GH < 1.25 Sec 2.3.4.1 TIA-EIA-222-F

GH = 1.0126 Input Value

Kz = (z/10)^2/7 Exposure Coefficient


Kz = > 1.0 < 2.58 Sec 2.3.3. TIA-EIA-222-F

ORIGINAL DESIGNED ANTENNA LOAD


Exposure Coeff . Basic Windload
S No Design Loads Size Dept Quantity z 1<Kz<2.58 Fa= CC*AA
1 GSM 900 MHZ GSM 18 29 1.355524 0.886
2 M/W 0.60 DIA. M/W 2 26 1.313887 0.46

ACTUAL & EXISTING ANTENNA LOAD


Exposure Coeff .
S No Design Loads Size Dept Quantity z 1<Kz<2.58 S No
1 LR GSM 1 35 1.43034315 1
2 VP GSM 3 34 1.41854634 2
3 GSM 900 MHZ GSM 6 34 1.41854634 3
4 MW 0.30 DIA MW 1 30 1.36871663 4
5 MW 0.20 DIA MW 2 29 1.35552368 5
6 MW 0.30 DIA MW 1 28 1.34200165 6
7 GSM 900 MHZ GSM 3 28 1.34200165 7
8 VP GSM 1 28 1.34200165 8
9 GSM 1800 MHZ GSM 1 28 1.34200165 9
10 GSM 900 MHZ GSM 6 25 1.29924622 10
11 GSM 1800 MHZ GSM 2 25 1.29924622 11
12 VP GSM 2 25 1.29924622 12
13 MW 0.30 DIA MW 1 25 1.29924622 13
14 GSM 2100 MHZ GSM 1 24 1.28418133 14
15 MW 0.20 DIA MW 1 23 1.26866116 15
16 VP GSM 1 22 1.2526512 16
17 VP GSM 1 21 1.23611265 17
18 GSM 2100 MHZ GSM 1 21 1.23611265 18
Total 35

PROPOSED ADDITIONAL ANTENNA L


Exposure Coeff .
S No Design Loads Size Dept Quantity z 1<Kz<2.58
1 NEW MW 0.60 DIA MW 1 18 1.18285458 19
Total 1

Grand Total 36

Designed Antenna Loads > Actual & Existing Antenna Loads + Proposed Additional A
NG DESIGN CONSULTANTS

ON REPORT @ 39 M/S

D ANTENNA LOADS @ 39 M/S


Basic Windload Antenna Windload Base Moment
Fa*GH*Kz*no Fa*GH*Kz*no*z
21.89028 634.818
1.224006 31.82416
Total 666.6422

ANTENNA LOADS @ 35 M/S


Basic Windload Antenna Windload Base Moment
Fa= CC*AA Fa*GH*Kz*No Fa*GH*Kz*no*Ht
0.075707 0.109651 3.837782
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
Total #NAME?

ONAL ANTENNA LOADS @ 35 M/S


Basic Windload Antenna Windload Base Moment
Fa= CC*AA Fa*GH*Kz*No Fa*GH*Kz*no*z
0.120003 0.143735 2.587226
Total 2.587226

Grand Total #NAME?

ds + Proposed Additional Antenna Loads Therefore OK!