This proposal outlines the design and construction drawing costs for the Muju-Resort totaling 520,000. It includes costs for master planning, basic design, engineering design, sewage treatment plant design, water supply structure design, landscape design, and electrical and telecommunication design. The utility design cost covers the infrastructure for the entire resort, which is planned as a one and two-step ski and golf resort.
This proposal outlines the design and construction drawing costs for the Muju-Resort totaling 520,000. It includes costs for master planning, basic design, engineering design, sewage treatment plant design, water supply structure design, landscape design, and electrical and telecommunication design. The utility design cost covers the infrastructure for the entire resort, which is planned as a one and two-step ski and golf resort.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
This proposal outlines the design and construction drawing costs for the Muju-Resort totaling 520,000. It includes costs for master planning, basic design, engineering design, sewage treatment plant design, water supply structure design, landscape design, and electrical and telecommunication design. The utility design cost covers the infrastructure for the entire resort, which is planned as a one and two-step ski and golf resort.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd