Proposal Cost of Muju-Resort Design & Construction Drawings

Work Scope Proposal cost

1. MasterPlan 25,000

2. Basic Design 15,000

3. Engineering Design 270,000

4. Sewage Treatment Plant Design 40,000

5. Water Supply Structure Design 50,000

6. Landscape Design 30,000

7. Electrical & Telecommunication Design 90,000

Total 520,000

* Utility Design Cost for whole resort is included


oposal Cost of Muju-Resort Design & Construction Drawings

Remarks

1 Step, 2Step Ski and Golf resort

1 Step design for Zonning

Ski Resort & Infra

Filtration plant, Forebay plant,


Drain field, Pressurization plant