THE NATIONAL COMMERCIAL BANK

SOLUTION TO REGULATE RAIN WATER FLOOD

4/29/12

PROJECT : Rain Water Flood Control Client : THE NATIONAL COMMERCIAL BANK SUBJECT : FINAL REPORTS ON SYSTEM APPLICATION BUILDING REFERENCE: NCB MAIN HEADQUARTER Applicable to install two numbers (2) of water wells, 50 meter deep in south east side elevation. Two water chambers will be installed with two submersible water pumps each. Water drainage pipe line to be constructed along the road from water chamber to open sea. AL MAHMAL BUILDING Applicable to install three numbers (3) of water wells, 50 meter deep in south east and west side elevation. Two water chambers will be installed with two submersible water pumps each. Water drainage pipe line to be constructed along the road from water chamber to open sea. BAGDADIYAH BUILDING Applicable to install four numbers (4) of water wells, 50 meter deep in NEWS side elevation. Two water chambers will be installed with two submersible water pumps each. Water drainage pipe line to be constructed along the road from water chamber to open sea. KILO 10 FACILITY Applicable to install four numbers (4) of water wells, 50 meter deep in south east and north side elevation. Two water chambers will be installed with two submersible water pumps each. Water drainage pipe line to be constructed along the road from water chamber to government storm water ways

4/29/12

SECTIONAL DETAILS
FINISH LEVEL

WE LL Non clog Pump To underground storm drainage system

WATER LEVEL

4/29/12

The proposed water well with 12 dia. 50 to 80 meter

PHOTOS OF PREVIOUS PROJECTS


PREVENTIVE MAINTENACE
4/29/12

4/29/12

4/29/12

4/29/12

4/29/12

ARIAL VIEW

Water flow from high land

High level

4/29/12

THE END THANK YOU