Knowledge Construction Supervision -

Page 1 of 18

-------------- --------------

----------- -----------

-------------- --------------

----------- -----------

-------------- --------------

----------- -----------

-------------- --------------

----------- -----------

-------------- --------------

----------- -----------

()

Sheet No. : TR-FP-06


January 10

1 Sleeve

1
Sleeve
Sleeve

2 Flexible Connector
Differential Settlement

2 Flexible Connector (Spool Piece)


Differential Settlement

http://www.iecm.co.th/iso_knowledge_fp.htm

10/12/2554

Knowledge Construction Supervision -

Page 2 of 18

3 Flexible Connector
Differential Settlement

3 Flexible Connector
Differential Settlement

4 Flow meter
( 3.20 . )

4 Flow meter
Meter

5 () Escutcheor

5 Escutcheor

6 Sleeve

6 2
Screw

http://www.iecm.co.th/iso_knowledge_fp.htm

10/12/2554

Knowledge Construction Supervision -

Page 3 of 18

7 Butterfly Valve Relief Valve /

7 /

8 Controller Jockey Pump

8 Controller Jockey Pump


-
( 1,800 .)

9 Gate valve Automatic Air vent

10 Fire Pump .
Bolt &
Nut

10 Fire Pump Rubber Pad


SPEC.

http://www.iecm.co.th/iso_knowledge_fp.htm

10/12/2554

Knowledge Construction Supervision -

Page 4 of 18

11 Globe Valve Needle Valve


Pressure Snubber Pressure Gauge

11
Drain
Pressure Gauge

12 Globe Valve Needle Valve Pressure


Snubber Pressure Gauge

12

13 Ball Valve Globe Valve Needle Valve


Pressure Snubber ( Controller Fire Pump)

13

14 Ball Valve Globe Valve Needle Valve


Pressure Snubber Pressure
Gauge

14

http://www.iecm.co.th/iso_knowledge_fp.htm

10/12/2554

Knowledge Construction Supervision -

Page 5 of 18

15 Sight Glass Jockey Pump

15 Sight Glass

16 Diesel Engine Fire Pump


Stainless or Aluminum Jacket

16
Jacket Flexible Connector

17 Bolts Flexible Connector


Bolts

17

18 Drain Gate Valve


Strainer

18

http://www.iecm.co.th/iso_knowledge_fp.htm

10/12/2554

Knowledge Construction Supervision -

Page 6 of 18

19 Pressure Gauge Suction Fire Pump


Vacuum Pressure SPEC.

19 Pressure Gauge Discharge Fire Pump


SPEC.

20 Valve Tag Valve

20 Valve Tag -
- N.O. (Normally Open) N.C. (Normally
Closed)

2 1 Battery Fire Pump

2 1 Battery Fire Pump

2 2 Header Sprinker

2 2 Header Sprinker
Ring Plate

http://www.iecm.co.th/iso_knowledge_fp.htm

10/12/2554

Knowledge Construction Supervision -

Page 7 of 18

23 Support .
( . )

2 3 Support .
( . )

24
-

24

25 Pressure Relief Valve & Enclosed Waste Cone

25

26 Flexible Connector

26 Flexible Connector
Differential Settlement
()

http://www.iecm.co.th/iso_knowledge_fp.htm

10/12/2554

Knowledge Construction Supervision -

Page 8 of 18

27 ()

27

28 Fire Hydrant Pipe Combined Shop


Drawing

28 Combined Shop Drawing


29 Fire Department Connection


(FDC) FDC
( 30 .)

29 Fire Department Connection

30 Fire Department Connection


( 29 )

30 Fire Hydrant
(Fire Hydrant Angle
Valve ())

http://www.iecm.co.th/iso_knowledge_fp.htm

10/12/2554

Knowledge Construction Supervision -

Page 9 of 18

31 Smoke Detector Combined Shop Dwg.

31 Combine

32 Sprinkler Combined Shop Dwg.

32 Combine

33 Sprinkler

33 Sprinkler
NFPA.

Top | post web board

( 1)

Sheet No. : TR-FP-05


February 10

... ( Centrifugal) Split Case


End Suction ()

1. Centrifugal Pumps
Horizontal Split Case Centrifugal Pump ( Suction)
(Discharge) -

http://www.iecm.co.th/iso_knowledge_fp.htm

10/12/2554

Knowledge Construction Supervision -

Pressure gauge 2
()

( )

Page 10 of 18

1. Pressure Gauge Horizontal


2.
() Pressure Differential Switch
Fire Pump

Pressure Gauge
( )
( Pressure Drop Flexible Connector, Valve )
Suction
Eccentric Reducer (Spool piece) 100 .
(Flange) Slip-On Plate Flange Welding Neck Flange
Discharge
Concentric Reducer (Spool piece) 100 . (Flange) SlipOn Plate Flange Welding Neck Flange

2. Vertical Turbine Fire Pump


Vertical Turbine Fire Pump :NFPA 20
Cover
Guard

http://www.iecm.co.th/iso_knowledge_fp.htm

10/12/2554

Knowledge Construction Supervision -

Page 11 of 18


(Discharge Pipe)

()

1. Supplier Installation Manual Rubber Pad


2. Gutter 5 x 5 . / ()
3. Aluminum Jacket or Stainless Jacket 4.5 .
( Flexible Connector Jacket)
4. Vertical Turbine Supplier Installation Manual
5. Pressure Relief Valve & Enclosed Waste Cone
6. Pressure Gauge

7.
8.
9.
10.

(Weekly Exercise)
Steel Plate () .
Discharge to FP. Pipe Line
Check Valve

http://www.iecm.co.th/iso_knowledge_fp.htm

10/12/2554

Knowledge Construction Supervision -

Page 12 of 18

11. OS & Y Gate Valve


12. Bolt, Nut Washer Sheet No. TR-GE-03 : Bolt, Nut, Washer

1. OS & Y Gate Valve



2. Butterfly Valve Hand Wheel Gear
Operator 6

SPEC. Horizontal


3. Check Valve
4. Enclosed Waste Cone and Sight Glass
5. Pressure Relief Valve (PRV.)
6. Concentric Reducer
7. Suction and Discharge Pressure Gauge
(Pressure Drop)
8. Suction and Discharge Pressure Gauge
(Pressure Drop)
:{

{
{

)
Flexible Connector
4


Suction Scale Vacuum Pressure (Scale
)
Liquid Filled

9. Automatic Air Vent Air Release Valve



10. OS & Y Gate Valve
11. Y-Strainner
Suction Fire
Pump
SPEC.
12. Flow Meter
13. Butterfly Valve Hand Wheel Gear Operator
Supervisory Switch
Horizontal

14. Bolt, Nut Washer Sheet No.


TR-GE-03 : Bolt, Nut, Washer

http://www.iecm.co.th/iso_knowledge_fp.htm

10/12/2554

Knowledge Construction Supervision -

Page 13 of 18

3. Jockey Fire Pump

1. OS & Y Gate Valve


2. Y-Strainer Suction Fire Pump
SPEC. Y-Strainer Drain
- 1
3. Suction Pressure Gauge () Scale Vacuum Pressure
(Scale ) Flex ()

Gate Valve
( )

Globe Valve

( )

4. Flexible Connector Bolts Washer (Nut Washer )

5. Jockey Fire Pump Rubber Pad


6. . 10 -15 . Gutter 5 x 5 .
7. Discharge Pressure Gauge 3 Scale Range
8. Check Valve
9. Flow Meter

http://www.iecm.co.th/iso_knowledge_fp.htm

10/12/2554

Knowledge Construction Supervision -

Page 14 of 18

Top | post web board

Fire Hose Cabinet

Sheet No. : TR-FP-04


September 09

Typical Detail Fire Hose Cabinet


Fire Hose Cabinet
Fire Extinguisher

1 = Fire Hose Reel


Fire Extinguisher

2 =
3 = Side Plate

4 = Quick Coupling

Fire Hose Cabinet


Fire Hose Cabinet
:1. Plan Layout Fire Hose Cabinet

2. Side Plate (Automatic Fire Hose Reel)


()

http://www.iecm.co.th/iso_knowledge_fp.htm

10/12/2554

Knowledge Construction Supervision -

Page 15 of 18

3. Fire Extinguisher Piano Type


180
4. Quick Coupling
5. (Automatic Hose Reel)
-
6. Fire Extinguisher ()
Fire Extinguisher
7. -
(
)
8.

Fire Extinguisher
9. Fire Hose Cabinet

10. Fire Hose Cabinet Fire Extinguisher


()
11.
?

Hose Reel
12. Hose Reel :{ Hose Rell
Hose Reel
{ Hose
Reel

Top | post web board

http://www.iecm.co.th/iso_knowledge_fp.htm

Sheet No. : TR-FP-03


March 09

10/12/2554

Knowledge Construction Supervision -

Page 16 of 18

Horizontal Split Case Centrifugal Pump


/ /

(Eccentric Reducer)

Air Pocket ()

Top | post web board

Sheet No. : TR-FP-02


August 08

Teloscopic Expansion Joint

Expansion Joint Telescopic


Loop Loop Expansion Joint Shaft
(Fire Hose Cabinet) Sprinkler

http://www.iecm.co.th/iso_knowledge_fp.htm

10/12/2554

Knowledge Construction Supervision -

Page 17 of 18


1. Expansion
Joint
Expansion Joint Catalog Expansion Joint
(Spool Piece)
() Expansion Joint

2. Concrete Slab /


Stainless Steel PE



Top | post web board

Pressure Switch Fire Pump Jocky Pump

Electric Motor Driven Fire Pump

Sheet No. : TR-FP-01


April 07

Fire Pump Controller

Diesel Engine Fire Pump


Pressure Switch Controller Fire Pump Jocky Pump
Pump Set point Pressure
Switch
1. Fire Pump Jocky Pump
1.1 Jocky Pump
1.2 Electric Motor Driven Fire Pump
1.3 Diesel Engine Driven Fire Pump
2. Orifice Check Valve Pressure Switch 2 1.5
(Orifice Check Valve Check Valve Swing Check Valve ( Flow Direction Flow
Switch Header ) Valve Disc 3/32
3. Pressure Switch Fire Pump Jockey Pump
3.1 Jockey Pump
3.1.1 Stop Churn Pressure Fire Pump Minimum Static Pressure

http://www.iecm.co.th/iso_knowledge_fp.htm

10/12/2554

Knowledge Construction Supervision -

Page 18 of 18

Water Supply Pump


3.1.2 Start Stop 10 PSI
3.1.3 Stop Start Jockey Pump 3.1.1 3.1.2
Jockey Pump 1
3.2 Fire Pump
3.2.1 Start Fire Pump Start Jockey Pump 5 PSI
Start 10 PSI
3.2.2 Stop Fire Pump Manual Stop Stop
Churn Pressure Maximum Static Pressure Water Supply
3.2.3 Fire Pump Electric Fire Pump

Churn Pressure Pressure Fire Pump Flow 0 GPM (No Flow) (


Performance Curve Fire Pump)
Minimum Static Pressure Maximum Static Pressure Water Supply 0
SPI Water Storage Tank Fire Pump Water
Storage Tank Static Pressure Pressure Setting
Test Fire Pump
Flow 3
1. Churn Pressure 0% Rated Flow
2. Pressure 100% Rated Flow
3. Pressure 150% Rated Flow
Pressure - Flowrate Plot Curve Curve Fire Pump
Pressure 95% Pressure
Curve /

Churn Pressure 175 PSI Pressure Relief Valve Fire Pump

1. Diesel Fire Pump (FP- 01, FP- 02) 1,000 GPM, 125 PSI
2. Electric Fire Pump (FP- 03, FP- 04) 1,000 GPM, 125 PSI
3. Jockey Pump (JP- 01, JP- 02)
Performance Curve Fire Pump
{
{

Churn Pressure
Static Pressure Water Supply Max Min

Stop JP-01, JP-02


Start JP-01, JP-02
Start FP-03
Start FP-04
Start FP-01
Start FP-02
Stop FP-01 to FP-04

=
=
=
=
=
=
=

=
=

147
0

PSI
PSI

147 PSI
147 + 0 =
137 PSI
147 - 10 =
132 PSI
137 - 5 =
122 PSI
132 - 10 =
112 PSI
122 - 10 =
102 PSI
112 - 10 =
Manual Stop Pressure Switch Stop
147 + 0 =
147 PSI