Project : . Footing No.: F2 Engineer :P.THEERABOON Date : 26/1/48 CALCULATION SHEET OF RC.

C.PILE CAP WITH NINE(9) PILES BY USING ELASTIC THEORY (EIT. Standard)

1) Strength of materials 1.1 Concrete


fc' = fc = 0.45 fc' =
1/2

240 108

ksc. ksc. ksc.

Ec = 15210*fc' = 235,632

1.2 Steel

SD - 40 fy = 4,000 ksc. fs = 0.50 fy = 1,700 ksc. Es = 2,040,000 ksc. n =Es/Ec = k = 1/(1+fs/(n*fc) = j = 1-k/3 = R = 1/2*fc*k*j = 10 0.32 0.89 15.4

1.3 Parameter
ksc. ksc. ksc. kg. kg.m m. kg.m m. kg. Num.piles = 9 piles m. Weight Footing= 71,885 kg. m. Load/pile = 60,272 kg./pile. m. m. Distance between pile= 180 cm. m. 1.8 m. m. m.

2) Loading
Total Axial load , P = 470,560 Moment about Y - axis, My = 0 Eccentricity // X - axis, ex = 0.00 Total Moment about Y - axis,My = 0

3) Configuration of Pile cap & Column


Dimension / Diameter of pile, D = 0.60 Capacity of pile, Psave = 62,000 Short side, W= 4.80 Long side, L= 4.80 Trial Total depth of pile cap, D1= 1.30 Cover to cg. Of bars, d'= 0.05 Effective depth, d= 1.25 Dimension of column // X-axis, a= 0.65 Dimension of column // Y-axis, b= 0.65

4) Piles arrangement
Load on pile, P1 to P9 = P/N-(My*dy/total dy )= 60,272
2

kg. ksc. kg. ksc. ksc. kg. ksc. kg.m

<

62,000

kg

OK.

5) Shear
Vc = 0.29 x fc'= 4.49 5.1 Flexure Shear Actual Reduction or Add shear, V= 180,815 Actual shear stress, v= 3.01 5.2 Punching Shear Vc = 0.53 x fc'= 8.21 Actual Reduction or Add shear, V= 482,173 Actual shear stress, v= 9.41 Actual moment , My = 269,568
2

<

4.49

ksc.

OK.

<

8.21

ksc.

NOT

6) Moment about Y - axis and Main reinforcement along X - axis


Mr=Rbd = 1,157,760 kg.m As Required = M/fs*j*d= 142.00 Trial Diameter of bar = 28 As Provided= 153.86 cm2 mm cm
2

OK.

(Singly Reinforcement.)
Trial Number of bar = > 142.00 cm
2

25 OK. Status OK. OK.

7) Temperature Steel, (0.0018/0.002/0.0025)xbxt


Along X-axis Along Y-axis

,coeff = 0.0018
As Reqcm2 Number & Dia mm. 112.32 25 DB 28 112.32 25 DB 28 28 12.67 6.581 As Provide cm2 154 154 25

8) Bonding
Diameter of bars= Allowable bonding stress, u= Provided Perimeter, 0= mm. Trial Number of bar = ksc. ksc. < 13 ksc.

OK

9) Conclusion of Reinforcements
Use Steel bars along X-axis, DIA.= Use Steel bars along Y-axis, DIA.= 28 28 mm. mm. Number of bar= Number of bar= 25 25

Project : . Footing No.: F2A Engineer :P.THEERABOON Date : 26/1/48 CALCULATION SHEET OF RC.PILE CAP WITH TEN(10) PILES BY USING ELASTIC THEORY (EIT. Standard)

1) Strength of materials 1.1 Concrete


fc' = fc = 0.45 fc' =
1/2

240 108

ksc. ksc. ksc.

Ec = 15210*fc' = 235,632

1.2 Steel

SD - 40 fy = 4,000 ksc. fs = 0.50 fy = 1,700 ksc. Es = 2,040,000 ksc. n =Es/Ec = k = 1/(1+fs/(n*fc) = j = 1-k/3 = R = 1/2*fc*k*j = 10 0.32 0.89 15.4

1.3 Parameter
ksc. ksc. ksc. kg. kg.m m. kg.m m. kg. Num.piles = 10 piles m. Weight Footing= 89,060 kg. m. Load/pile = 61,962 kg./pile. m. m. m. m. m.

2) Loading
Total Axial load , P = 530,560 Moment about Y - axis, My = 0 Eccentricity // X - axis, ex = 0.00 Total Moment about Y - axis,My = 0

3) Configuration of Pile cap & Column


Dimension / Diameter of pile, D = 0.60 Capacity of pile, Psave = 62,000 Short side, W= 4.325 Long side, L= 6.60 Trial Total depth of pile cap, D1= 1.30 Cover to cg. Of bars, d'= 0.05 Effective depth, d= 1.25 Dimension of column // X-axis, a= 0.65 Dimension of column // Y-axis, b= 0.65

4) Piles arrangement
Load on pile, P1 to P9 = P/N-(My*dy/total dy )= 61,962
2

kg. ksc. kg. ksc. ksc. kg. ksc. kg.m

<

62,000

kg

OK.

5) Shear
Vc = 0.29 x fc'= 4.49 5.1 Flexure Shear Actual Reduction or Add shear, V= 185,886 Actual shear stress, v= 3.44 5.2 Punching Shear Vc = 0.53 x fc'= 8.21 Actual Reduction or Add shear, V= 495,696 Actual shear stress, v= 4.56 Actual moment , My = 333,977
2

<

4.49

ksc.

OK.

<

8.21

ksc.

OK.

6) Moment about Y - axis and Main reinforcement along X - axis


Mr=Rbd = 1,043,190 kg.m As Required = M/fs*j*d= 175.93 Trial Diameter of bar = 28 As Provided= 196.94 cm2 mm cm
2

OK.

(Singly Reinforcement.)
Trial Number of bar = > 175.93 cm
2

32 OK. Status OK. OK.

7) Temperature Steel, (0.0018/0.002/0.0025)xbxt


Along X-axis Along Y-axis

,coeff = 0.0018
As Reqcm2 Number & Dia mm. 101.205 20 DB 28 154.44 20 DB 28 28 12.67 5.286 As Provide cm2 123 123 32

8) Bonding
Diameter of bars= Allowable bonding stress, u= Provided Perimeter, 0= mm. Trial Number of bar = ksc. ksc. < 13 ksc.

OK

9) Conclusion of Reinforcements
Use Steel bars along X-axis, DIA.= Use Steel bars along Y-axis, DIA.= 28 28 mm. mm. Number of bar= Number of bar= 32 32