GTG Hydraulic System SOP

This document provides a standard operating procedure for starting up the hydraulic oil pump system of a 384 MW combined cycle power plant. The procedure involves: 1) Opening various valves to line up the hydraulic pumps and accumulator; 2) Normalizing the hydraulic pump power supply module per electrical procedures; 3) Verifying start permissives such as hydraulic pump suction pressure; 4) Performing pre-start checks of pumps, pressures, and valves; 5) Starting one hydraulic pump via the DCS and observing normal operation of pressures and pumps.

Uploaded by

Sarah Cohen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
265 views2 pages

GTG Hydraulic System SOP

This document provides a standard operating procedure for starting up the hydraulic oil pump system of a 384 MW combined cycle power plant. The procedure involves: 1) Opening various valves to line up the hydraulic pumps and accumulator; 2) Normalizing the hydraulic pump power supply module per electrical procedures; 3) Verifying start permissives such as hydraulic pump suction pressure; 4) Performing pre-start checks of pumps, pressures, and valves; 5) Starting one hydraulic pump via the DCS and observing normal operation of pressures and pumps.

Uploaded by

Sarah Cohen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

GMR RAJAHMUNDRY ENERGY LIMITED

2 X 384 MW COMBINED CYCLE POWER


PLANT
Standard Operating Procedure
for
[Link]
SystemE!"#$me%t
N&me'
GTG (y)*&"+#, - +#.t /#+ system %/*m&+#0&t#/%
I1 SYSTEM LINE UP
1. Open hydraulic pump#A&B uction !al!e "#$%1A&1B'
2. Open hydraulic pump#A&B dicharge !al!e "#$%2A&2B'
(. Open hydraulic pump#A&B high compenator actuation !al!e "#$%(A&(B'
4. Open hydraulic oil accumulator )lling !al!e "#$%4A'
*. +loe accumulator oil ide drain !al!e "#$%4B' & cloe accumulator ga ide
!ent !al!e
,. -nure [Link] intrument/ impule line !al!e are open
P0 12%,A&,B 1ydraulic pump uction preure indicator
PS ,(12%,A&,B 1ydraulic pump uction preure .itch
P3S ,(1#%1&2 1ydraulic pump dicharge )lter di4erential preure
.itch
P35 6,1#%1&2 1ydraulic pump dicharge )lter di4erential preure
tranmitter
P0 12%1&2 1ydraulic pump dicharge preure indicator
P0 12%( 1ydraulic oil common header preure indicator
PS ,(12%1A&1B 1ydraulic oil common header preure .itche
P5 6,12%1 1ydraulic oil common header preure tranmitter
P0 2B%1 7ift oil header preure indicator
PS ,(2B%1 7ift oil header preure .itch
P30 12 8 4 09$ 1ydraulic oil upply line )lter di4erential
preure indicator
:. Open ga compartment hydraulic oil ditri;ution line iolation !al!e
8. <ormali=e hydraulic pump "8812%1&2' [Link] upply module a per
electrical normali=ation procedure
6. [Link] O< lift oil olenoid !al!e "202B%1' [Link] upply >+B "*0&*1%1*'
II1 START UP PERMISSI2ES
1. 1ydraulic pump uction preure i ? 10 @ 1 PS09
2. <o )re alarm perit
III1 PRE 3 START CHEC4S
Page 5 of 2
GMR RAJAHMUNDRY ENERGY LIMITED
2 X 384 MW COMBINED CYCLE POWER
PLANT
Standard Operating Procedure
for
[Link]
1. Any one AOP & O>- are running and repecti!e dri!e&ytem operating
parameter are normal
2. 959 81 - >++A A+ >++%2B i [Link] a per normal chematic
(. 1ydraulic oil header accumulator preure i normal "minimum of 60 ;ar
.hen pump i not in er!ice'
4. P--++ 41*&240$ ditri;ution tranformer uptream & [Link] iolator
i cloed
*. 0ndi!idual ;earing !aria;le Bo. control !al!e "$2+/' etting are not
changed
I21 START UP PROCEDURE
1. Select 7-A3 for the hydraulic oil pump to ;e tarted
2. -Cecute 95 +OO7 3OD< O< command
(. -nure the tart of 7-A3 elected A1OP after tart of AOPA O>-
21 OBSER2ATIONS
-nure [Link] immediately after ytem tart up
1. <o a;normal&rough noie from hydraulic oil pump&motor
2. O;er!e hydraulic pump dicharge & header preure are normal "hould
;e ? 112 ;ar'
(. -nure energiation of lift oil olenoid !al!e & o;er!e it header normal i
normal "hould ;e ? 1,2 ;ar'
Page 2 of 2