You are on page 1of 3

SALIENT FEATURES OF LOWER ANKHU KHOLA

HYDROPOWER PROJECT (LAKHEP)


1. Project Location
Development Region
Zone :
District
Geographical Co-ordinates
Latitude
Longitude

: Central
: Bagmati
: Dhadhing
: 28 1' 8 "N to 280 04' 7"N
: 840 56' 43 "E to 840 59'31 "E

2. General Features
Name of River
Nearest Town
Type of Scheme
Gross Head
Capacity
Average Annual Energy after Outage & Losses

: Aankhu Khola
: Bidur
: Run-of-river
: 95 m
: 25,000 kW
: 140.311 GWh

3. Hydrology
Catchment Area
Mean Annual Discharge
Design Discharge
Probability of Exceedance
Riparian Release
Design Flood Discharge

: 620 Km2
: 55.84 m3/s
: 30.65 m3/s
: 40 %
: 0.40 m3/sec
: 1,500 m3/s (100Yr. flood)

4. Headworks
Type
With Undersluice
Length of Diversion Weir
Height of Weir
Size of Undersluice Gate

: 28.0 m
: 8.0 m (Excluding Foundation)
: (3.0 m x 3.0 m) x 2 No.

5. Desilting Basin
Type
No of Chamber
Dimension (L x B x H) m
Particle Size to be Settled

: Hopper Type
:2
: 80 m x 10 m x 6.7 m
: 0.20 mm

: Free Overflow Diversion Weir

6.

Water Conveyance System


Type
Shape
Length
Size

: Headrace Tunnel (Pressurized)


: Inverted D Shape
: 3650 m
: 4 m Dia

Surge Tank
Type
Diameter
Height

: Restricted Orifice, Circular


: 14.0
: 45.0 m

Penstock
Type
Length
Finished Diameter
Thickness

: Supported Steel Pipe


: 420 m
: 3.2 m
: 10-16 mm

10 Powerhouse
Type
Size (L x B x H)

: Semi-Underground
: 35 m x 15.4 m x 16.6 m

11 Tailrace Canal
Type
Length
Size (W x H)

: RCC Rect. Semi-underground Culvert


: 800 m
:4mx4m

12 Turbine
Type
Number
Rated Output Capacity per Unit
Efficiency

: Vertical Axis Francis


: Two
: 12500 kW
: 90.0

13 Governor
Type
Adjustment for Speed Droop

: Electro-hydraulic PID
: Between 0 to 5%

14 Generator
Type
Rated output capacity per unit
Power factor
Voltage
Frequency
No of units
Excitation system
Efficiency

: Synchronous, Three phase


: 14700 kVA
: 0.85
: 11 kV
: 50 Hz.
: Two
: Brushless
: 96.5 %

15 Transformer
Type
Number
Voltage ratio
Efficiency

: Single Phase, Oil Immersed


: 3+1 Auxiliary
: 11/132 kV
: 99 %

16 Transmission Line
Voltage level
Length
(approx.)

: 132 kV Single Circuit


: 22 km

17 Status
Detail Feasibility Study License
Time Required for DFS preparation
IEE
PPA
Time to start construction
Construction Cost

: Received
: 1 year
: Not done
: Not done
: 1.5-2 years
: USD 42-46M