You are on page 1of 6

MBHEP- HEADRACE TUNNEL DIAMETER OPTIMIZATION STUDY

Design discharge
Length
Manning
Overall efficiency
Plant load factor

Q=
L=
n=
=
Pl =
C0 =

Levellised selling cost


Works rates

Rc =
S1 =
n=

Interest and Maintenance


Thickness of Shotcrete

Tsfr =
Construction
Cost

Tunnel diameter
Dm
4.5
4.75
5
5.25
5.5
5.75
6
6.25
6.5
6.75
7
7.25
7.5
7.75
8

X-Area.H.S
16.793
18.711
20.733
22.858
25.086
27.419
29.855
32.395
35.038
37.785
40.636
43.590
46.648
49.810
53.075

X-Area Dshaped
18.077
20.142
22.317
24.605
27.004
29.515
32.137
34.871
37.717
40.674
43.742
46.922
50.214
53.618
57.133

X-Area Circ.
15.904
17.721
19.635
21.648
23.758
25.967
28.274
30.680
33.183
35.785
38.485
41.282
44.179
47.173
50.265

Total cost
866320771.963
965252465.057
1069531817.238
1179158828.505
1294133498.858
1414455828.297
1540125816.823
1671143464.434
1807508771.132
1949221736.916
2096282361.787
2248690645.743
2406446588.786
2569550190.914
2738001452.129

50.8 m3/s
5076 m
0.014
0.9
0.54
6.6 Rs/kWh
5748 Rs/m3
1
1 for Dn
0.17
0.1 m
Energy losses

Velocity Dshaped
2.81
2.52
2.28
2.06
1.88
1.72
1.58
1.46
1.35
1.25
1.16
1.08
1.01
0.95
0.89

2049
0.017

Total Cost

Headlosses
Cost
13.838428 1,937,777,009.90 2,804,097,781.86
10.371803 1,452,349,996.00 2,417,602,461.06
7.889452 1,104,749,590.88 2,174,281,408.12
6.081871
851,636,476.31 2,030,795,304.81
4.745542
664,512,051.86 1,958,645,550.72
3.743907
524,254,339.71 1,938,710,168.00
2.983643
417,795,608.25 1,957,921,425.07
2.399901
336,055,065.97 2,007,198,530.40
1.946924
272,625,183.20 2,080,133,954.34
1.591965
222,920,709.91 2,172,142,446.82
1.311286
183,617,608.12 2,279,899,969.90
1.087470
152,277,067.30 2,400,967,713.04
0.907598
127,089,733.14 2,533,536,321.92
0.761982
106,699,272.71 2,676,249,463.62
0.643290
90,079,079.99 2,828,080,532.12

Total Cost for 5.5 m Dia

USD
4787923.9
4398710.2

NRS
203796.6
187229806.0

478,996,181.57
627,100,826.00

1,106,097,007.57
5748.8090255328