Professional Documents
Culture Documents
• Low Cost
• Rapid Coverage
• Continuous information
• Optimization of dill holes
• Minimization of ‘Surprises’
• Early stage application…Better
planning, smooth execution.
• Surface only
• Inspector Dependent
• Standards?
Assumptions
&
Opinions
Data
Assumptions
&
Opinions
Data
• Objective of Investigation
• Resolution required
• Depth penetration required
• Physical property to be defined
• Geometry of Dam
• Nature of target & host material
Electrical Resistivity Section from dam crest of a masonry dam Showing Zone of Saturation (Green & Blue)
300
200
100
Streaming Potential (mV)
0
200 400 600 800 1000 1200 1400 1600 1800 2000
-100
-200
• Principle- EM Reflections
• Bedrock mapping
Inversion in process
Inversion in
Progress