You are on page 1of 7

The Concrete Centre

Project

Spreadsheets to BS 8110

Client

Advisory Group

Location

D&D: Edge beam Grid 1 from A to J

Made by

Date

rmw

CONTINUOUS CONCRETE BEAM DESIGN to BS 8110:2005 TablChecked


Originated from RCC95.xls v4.0 on CD

LOCATION

ports: from grid

to grid

176

Revision

Job No

chg

2006 TCC

Page

17-Aug-2016

R68

STATUS

VALID DESIGN
DIMENSIONS
N of spans
Max Span
depth, h
bw
hf
bf
LOADING
Self Wt
+ Dead
Total Dead, gk
Imposed qk
Design load, n =

N
m
mm
mm
mm
mm

5
5.00
350
300
175
650

MATERIALS
fcu
N/mm
fyl
N/mm
fyv
N/mm
h agg
mm

Shape L BEAM
Top cover mm 40
Bottom cover mm 40
Side cover mm 40
pport steel in alt layer ? Y

40
500
500
20

m 1.50
m 1.15
steel class A
Density kN/m 23.6
(Normal weight concrete)

100
50

kN/m
kN/m
kN/m
kN/m
kN/m

BENDING

1.2
10.9
12.1
5.0
25.0

0
-50
-100

J
Geometry and Loading

END
SUPPORTS (A & J)

M kNm
d mm
bf mm
As mm
As' mm

0.0
276
300
0
0

Indicative Bending Moment Diagram

END
SPANS

FIRST INT
SUPPORTS

INTERIOR
SPANS

INTERNAL
SUPPORTS

56.2
290
650
470
0

68.7
270
300
648
0

43.7
294
650
360
0

50.0
270
300
457
0

BS8110
Reference
Table 3.5

3.4.1.5
3.4.4.4
3.4.4.4

Deflection

L/d Max
Actual L/d

36.46
17.24

37.98
17.01

OK

3.4.6.3

OK

3.4.6.1

Tension reinforcement

No
As prov mm
= %

16
2 Top
402
0.49

20
2 Btm
628
0.72

20
3 Top
942
1.16

12
4 Btm
452
0.51

20
2 Top
628
0.78

16
2 Btm
402
0.49

12
2 Top
226
0.26

12
2 Btm
226
0.28

12
2 Top
226
0.26

12
2 Btm
226
0.28

OUTER SUPT

FIRST INT SUPT

INT SUPT

NOMINAL

56.2
0.646
0.570
10
2
200

75.0
0.926
0.858
10
2
200

68.7
0.849
0.749
10
2
200

~
~
~
10
2
200

END
SPANS
2 H12 T
2 H20 B

FIRST INT
SUPPORTS
3 H20 T
Nominal B

INTERNAL
SPANS
2 H12 T
4 H12 B

INTERNAL
SUPPORTS
2 H20 T
Nominal B

2 H10 @ 200

2 H10 @ 200

2 H10 @ 200

2 H10 @ 200

Compression reinforcement

No
As' prov mm
= %
SHEAR
V kN/m
v N/mm
vc N/mm
Link mm
Legs No
@ mm

Table 3.5
Eqn 3
Table 3.8

OUTPUT/SUMMARY
END
SUPPORTS
PROVIDE
2 H16 T
Main reinforcement Nominal B
Links 2 H10 @ 200
from CL of support

CHECKS

for 800

for 600

for 600

BAR
< COVER

SINGLE
LAYERS

BAR
SPACING

DEFLECTION

SHEAR
LINKS

GLOBAL
STATUS

OK

OK

OK

OK

OK

VALID DESIGN

Project

Spreadsheets to BS 8110

Client

Advisory Group

Location

D&D: Edge beam Grid 1 from A to J

The Concrete Centre


Made by

rmw

CONTINUOUS CONCRETE BEAM DESIGN to BS 8110:2005 Table 3.5 Checked


Originated from RCC95.xls v4.0 on CD

chg

2006 TCC

Date

Page

17-Aug-2016
Revision

178
Job No

R68

SHEAR
OUTER
SUPPORT

FIRST INT
SUPPORT

INTERNAL
SUPPORT

NOMINAL

0.45
56.2

0.60
75.0

0.55
68.7

~
~

Table 3.5

v N/mm

0.646

0.926

0.849

Eqn 3

vc N/mm

0.570

0.858

0.749

Table 3.8

(v-vc)bv N/mm
Link
ok
Legs
ok
@ mm
Adjust to mm
for mm
Adjust to mm
As Dist
ok
As' Dist
ok

120.0
10
2
218
200
0
800
0.0
0.0

120.0
10
2
203
200
0
600
90.0
0.0

120.0
10
2
203
200
0
600
0.0
0.0

120.0
10
2
218
200
----0.0
0.0

Table 3.7

Factor
V

kN

ok
ok

ok
ok

ok
ok

ok
ok

ok
ok

ok
ok

-=-

3.12.7.1

3.12.7.1

from cl of supt
3.4.5.5
3.12.7.2

Project

Spreadsheets to BS 8110

Client

Advisory Group

Location

D&D: Edge beam Grid 1 from A to J

The Concrete Centre


Made by

rmw

CONTINUOUS CONCRETE BEAM DESIGN to BS 8110:2005 Table 3.5


Originated from RCC95.xls v4.0 on CD

2006 TCC

Checked

Date

Page

Aug-2016
Revision

179
Job No

chg

R68

APPROX WEIGHT of REINFORCEMENT


No Of

No

Type

Dia

Length

Unit wt

Weight

2
2
2
3
2

2
2
3
2
2

H
H
H
H
H

16
12
20
12
20

1925
3200
3000
3200
3000

1.578
0.888
2.466
0.888
2.466

12.2
11.4
44.4
17.0
29.6

2
2
2
3
2

2
2
2
4
2

H
H
H
H
H

16
20
12
12
12

950
4650
1200
4650
1200

1.578
2.466
0.888
0.888
0.888

6.0
45.9
4.3
49.5
4.3

2
2
3
3

7
18
6
19

H
H
H
H

10
10
10
10

1050
1050
1050
1050

0.617
0.617
0.617
0.617

9.1
23.3
11.7
36.9

TOP STEEL
End support
End span
First Int support
Internal span
Internal support
BOTTOM STEEL
End support
End span
First Int support
Internal span
Internal support
LINKS
End span
Internal span

SUMMARY

spacers not included Approx total reinforcement in bay (kg)


Reinforcement density (kg/m3: based on bw.d)

305
115.0

Project

Spreadsheets to BS 8110

Location

D&D: Edge beam Grid 1 from A to J

GRAPH DATA I

CONTINUOUS CONCRETE BEAM DESIGN to BS 8110:2005 Table 3.5


Originated from RCC95.xls v4.0 on CD

LOADING DIAGRAM
0
0
25
X
0
12.14 12.14
Dead
17.14 17.14
Imposed 12.14
0
0
0
Base
0
0
Supports
-3.428
0
BM DIAGRAM
1
Support
0
0
0.5
Local X
0
0
0.5
Global X
0
0
0
Base
0
0
-21.247
Moment
28.121
5
5
Gridlines
75.613 -47.492

2006 TCC

25
0
12.14
0
5
-3.428

gk = 12.14
qk = 5.00
F/2 = 62.49
5
0

10
-3.428

10
0

15
-3.428

15
0

20
-3.428

20
0

25
-3.428

25
0

25
-3.428

25
0

25
-3.428

25
0

2
3
End
Mid
1
1.5
2
2.5
3
3.5
4
4.5
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
5.5
6
6.5
7
7.5
8
8.5
9
9.5
10
10.5
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
-36.244 -44.993 -47.492 -43.743 -33.745 -17.497 4.9992 33.745 68.739 38.744 14.998 -2.4996 -13.748 -18.747 -17.497 -9.9984 3.7494 23.746 49.992 21.872
49.992 65.615 74.988 78.113 74.988 65.615 49.992 28.121
10
10
15
15
20
20
25
25
25
25
25
25
25
25
75.613 -47.492
75.613 -47.492
75.613 -47.492
75.613 -47.492
75.613 -47.492
75.613 -47.492
75.613 -47.492

25
-3.428

25
0
Mid

1
11
0
0

1.5
2
2.5
11.5
12
12.5
0
0
0
-15.623 -24.996 -28.121

GRAPH DATA II

3
3.5
13
13.5
0
0
-24.996 -15.623

4
14
0
0

4
5
Mid
End
4.5
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
14.5
15
15.5
16
16.5
17
17.5
18
18.5
19
19.5
20
20.5
21
21.5
22
22.5
23
23.5
24
24.5
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
21.872 49.992 23.746 3.7494 -9.9984 -17.497 -18.747 -13.748 -2.4996 14.998 38.744 68.739 33.745 4.9992 -17.497 -33.745 -43.743 -47.492 -44.993 -36.244 -21.247

6
0
25
0
0

0
25
0
0

0
25
0
0

0
25
0
0

GRAPH DATA III


Made by rmw

0
25
0
0

0
25
0
0

0
25
0
0

0
25
0
0

0
25
0
0

0
25
0
0

7
0
25
0
0

0
25
0
0

0
25
0
0

0
25
0
0

0
25
0
0

0
25
0
0

0
25
0
0

0
25
0
0

0
25
0
0

0
25
0
0

8
0
25
0
0

Job No R68
Date
17-Aug-16

0
25
0
0

0
25
0
0

0
25
0
0

0
25
0
0

0
25
0
0

0
25
0
0

0
25
0
0

0
25
0
0

0
25
0
0

9
0
25
0
0

Disclaimer
All advice or information from MPA-The Concrete Centre is intended for those who will evaluate the significance and limitations of its
contents and take responsibility for its use and application. No liability (including that for negligence) for any loss resulting from such advice
or information is accepted by MPA-The Concrete Centre or its subcontractors, suppliers or advisors. Users should note that all MPA-The
Concrete Centre software and publications are subject to revision from time to time and they should therefore ensure that they are in
possession of the latest version.
This spreadsheet should be used in compliance with the accompanying publication 'User Guide RC Spreadsheets: v4' available from The
Concrete Centre www.concretecentre.com/rcdesign Tel +44 (0)1276 606800

Status of spreadsheet
Public release version.

This spreadsheet is shareware but may not be used for commercial purposes until the user has
registered with The Concrete Centre using the licence validation form available on The Concrete
Centre website www.concretecentre.com/rcdesign

Revision history RCC95 Continuous Beams (Tables)

Date

Version

Action

Size (kB)

1-Apr-10

RCC95 v4.0

Re-badged as TCC/Mineral Products Association.

300

28-Jun-06

RCC95 v3.1

v3 release. Page nos, User Guide and registration details amended.

265

12-Nov-05

RCC95 v3.0

Updated to 2005 versions of BS8110 & BS8666

295

22-Jan-03

RCC95 v2.1

DETR logo replaced by DTI.

258

26-Nov-02

RCC95 v2.0

Version 2 enhancements & 3 span bug fixed.

276

RCC11 v1.0

First public release.


Includes b version comments

189

6-Aug-99