Client:

Consultant:

Contractor:

Project:

INSPECTION REQUEST

Ref No.
Rev No.

Sub Contractor:

Date :

Original of the IR :

Area of Inspection (Grid):


Authorized Signature:

Type of Work (MEP)


Elements to be inspected : (enclosed copy of the relevant drawing )

MEP CoOrdinator Signature :


Main Contractor Signature :

Consultant Received :

Date :

Date :

Coordination of Trades :
Mechanical

Comments of Consultant /Signature / Date & time

Consultant Resident Engineer :


Inspected By :

Engr. Abdul Kawi

Inspection Date
Consultant Engineer's Comment

Action

Approved

Approved with Comments

Not Approved,Resubmit
Rejected

Date :
Received by MainContractor

Date :