Method Statement For Interlock Works
Method Statement For Interlock Works
There are projects that sometimes can proceed for interlock or paving block works while
progressing the main project. This is sometime a technique of the management to avoid workers
to be idle if they have extra people while the project is at starting stage.
So here are the method statement for interlock work that you might want to learn how it will be
done.
1. Title
Method Statement for Interlock Works
2. Purpose and scope
The purpose of this method statement is to describe the measures and ways of proper installation
of interlock or paving block within our project. The work will be as per the project specification
and approved drawing.
3. Work procedure
1. Preparation
o Before interlock work starts, make sure that sub-grade is compacted when the
area is above natural ground.
o The sub-base shall be compacted with vibratory roller, size of roller shall be
suitable for the area where it could maneuver and can move back and fort.
o Once compacted and met the specification requirement for compaction and
approved by Engineer, base course shall then be placed above compacted subbase but make sure thickness of the bases are as per approved drawing.
o MEP rough-in or underground embedments (wherever applicable) shall be in
placed before interlock work commences.
o In the areas where there are kerb stone, the blinding shall be constructed first
serve as the base but make sure it shall be as per drawing.
o The importance of pre-installation of kerb stone is to prevent the migration or disalignment of interlock or block, and it will serve as reference line or level.