Road Construction Estimate Jampur to Mud Khursheed Abad

The document provides a rough cost estimate and lead chart for constructing a 1.5 km metalled road from Jampur Dajal Road to Mud Khursheed Abad. It details the total lead of 109.3 km for sub base and base course materials from various sources. A second section gives the lead chart for test materials, with a total lead of 414.34 km from sources in Kot Chutta and Karana Hill to the construction site in Mud Khursheed Abad. The document was prepared by a sub engineer for the Deputy District Officer Roads in Rajanpur.

Uploaded by

MaharNadirAli
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
68 views2 pages

Road Construction Estimate Jampur to Mud Khursheed Abad

The document provides a rough cost estimate and lead chart for constructing a 1.5 km metalled road from Jampur Dajal Road to Mud Khursheed Abad. It details the total lead of 109.3 km for sub base and base course materials from various sources. A second section gives the lead chart for test materials, with a total lead of 414.34 km from sources in Kot Chutta and Karana Hill to the construction site in Mud Khursheed Abad. The document was prepared by a sub engineer for the Deputy District Officer Roads in Rajanpur.

Uploaded by

MaharNadirAli
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

ROUGH COST ESTIMATE CONSTRUCTION OF METALLED ROAD FROM JAMPUR DAJAL ROAD TO MUD KHURSHEED ABAD

LENGTH = 1.50 KM

LEAD CHART FOR SUB BASE / BASE COURSE


Sakhi
Sarwar

Total Lead: 40.25+48.30+20+0.75=109.30 km


Site of work

Mud khursheed Abad

0.75 km Av

40.25 KM

20 Km

D.G Khan
48.30 KM

Sub Engineer

Deputy District Officer Roads,


Rajanpur

ROUGH COST ESTIMATE CONSTRUCTION OF M/ ROAD FROM JAMPUR DAJAL ROAD TO MUD KHURSHEED ABAD
LENGTH = 1.95 KM
LEAD CHART FOR TST

Total Lead: -393.59+20+0.75=414.34 KM


Site of work
Mud Khursheed Abad
0.75 Km Av

20 Km

Kot chutta
D.G Khan
393.59 km

Karana
Hill

Sub Engineer

Deputy District Officer Roads,


Rajanpur