Uraian Pekerjaan
Volume
Sat.
Pekerjaan Lantai 1
I
Pek. Pengukuran
II
Pek. Bongkaran
2.1
2.2
Dinding
Keramik lantai
48 M1
45.5 M2
6.4 M2
III
Pek.Pondasi
3.1
Galian tanah
39.5 M3
3.2
8.16 M3
3.3
Urugan tanah
15 M3
IV
Pekerjaan Beton
4.1 Balok Sloof 20 x 40
4.1.1
4.1.2
4.1.3
Bekisting
Pembesian 16
8
24.32 M2
238 Kg
12 Kg
4.1.4 Beton
4.2 Pondasi telapak 1.5 x 1.5 m
1.36 M3
4.2.1
4.2.2
4.2.3
Bekisting
Pembesian 12
Beton
4.5 M2
950 Kg
5.05 M3
Harga Satuan
Bahan
Upah
525000
Total Harga
Bahan
Total Harga
Upah
10,000
480,000
20,000
910,000
25,000
160,000
60,000
2,370,000
225,000
1,836,000
20,000
1,836,000
300,000
240,000
9,000
9,000
75,000
2,500
2,500
5,836,800
2,142,000
108,000
1,824,000
595,000
30,000
850,000
190,000
1,156,000
258,400
240,000
9,000
75,000
2,500
1,080,000
8,550,000
337,500
2,375,000
850,000
190,000
4,292,500
959,500