You are on page 1of 3

No

Uraian Pekerjaan

Volume

Sat.

Pekerjaan Lantai 1
I

Pek. Pengukuran

II

Pek. Bongkaran

2.1
2.2

Dinding
Keramik lantai

48 M1

45.5 M2
6.4 M2

III

Pek.Pondasi

3.1

Galian tanah

39.5 M3

3.2

Pasangan batu kali

8.16 M3

3.3

Urugan tanah

15 M3

IV
Pekerjaan Beton
4.1 Balok Sloof 20 x 40
4.1.1
4.1.2
4.1.3

Bekisting
Pembesian 16
8

24.32 M2
238 Kg
12 Kg

4.1.4 Beton
4.2 Pondasi telapak 1.5 x 1.5 m

1.36 M3

4.2.1
4.2.2
4.2.3

Bekisting
Pembesian 12
Beton

4.5 M2
950 Kg
5.05 M3

Harga Satuan
Bahan
Upah

525000

Total Harga
Bahan

Total Harga
Upah

10,000

480,000

20,000

910,000

25,000

160,000

60,000

2,370,000

225,000

1,836,000

20,000

1,836,000
300,000

240,000
9,000
9,000

75,000
2,500
2,500

5,836,800
2,142,000
108,000

1,824,000
595,000
30,000

850,000

190,000

1,156,000

258,400

240,000
9,000

75,000
2,500

1,080,000
8,550,000

337,500
2,375,000

850,000

190,000

4,292,500

959,500