RINGKASAN KUANTITI

Bil Item Unit Kuantiti Jumlah


1 Kerja tanah
a) excavate m³ 10.8 10.8 m³
2 Membina tapak
a) Lean-grade 25 m³ 0.54 0.54 m³
3.78 + 0.28 + 0.93 +
b) Concrete G.25 m³ 1.03 + 0.18 + 0.6 + 1.5 8.40 m³
c) BRC A10 m² 10 10 m²
d) R10 kg 10.16 + 3.01 + 5.54 18.71 kg
3 Membina takungan batu bata
a) Lean concrete G.15 m³ 0.16 m³
b)Concrete G.25 m³ 0.97 m³
c) BRC A10 m² 2.25 m²
d) batu bata m² 9 m²
e) mili steel grating no 1
f) plastering m² 7.2 + 9.00 16.20 m²
4 Membina wingwall dan apron
a) Lean concrete G.15 m³ 0.16 m³
0.28 + 0.93 + 0.18 +
b)Concrete G.25 m³ 1.03 + 1.5 3.92 m³
c) T12 kg 8.64 + 17.82 + 20.4 46.46 kg
d) R10 kg 10.16 + 3.01 + 5.54 18.71 kg
e) F/Wall m² 0.94 + 6.2 + 0.3 7.4 m²
Harga
ASAS PENGIRAAN

TAJUK : MEMBINA DAN MENYIAPKAN KERJA PEMBENTONGAN DI JALAN MASUK ASRAMA SK KUALA SAT

Bil Item Unit Kuantiti Harga Jumlah


1 Kerja Tanah
a. Excavate for foundaton trenches maximum depth not
exceeding 1.0 m

2 Kerja membina penapok

a. Concrete grade 15 as specified as lean concrete 50 mm m³


b. Concrete grade 20 as specified in foundation m³
c. Weld steel fabric reinforcment 200 x 200 A10 (A 393) m²
3
Membekal dan memasang pembentong termasuk kerja
berkaitan

a. 1200 mm Dia precast reinforce spun concrete pipe class 's'


and jointing with and including concrete collars in cement
mortar 1:1 including forming fillet all around at each end. m 6 387.10
4
Membina dan menyiapkan takung batu bata termasuk kerja
berkaitan
a. One brickwall in common bricks in cement mortar 1:6 as
specified m²
b. Mild steel grating 1200 x 1200 mm no 1 444.30 444.30
5 Membina wingwall dan apron no 1
a. Lean concrete grade 15 as specified m³
b. Concrete grade 25 as specified in foundation m³
c. Sawn formwork as specified to side of wall m²
d. Mild steel bar in reinforcement to concrete work. kg
a. R10 mm
b. T12
Rujukan
Item 9 Excavator/2017/1

Item 1 Concretor/2017/1
Item 3 Concretor/2017/1
Item 28 Concretor/2017/1

Item 22 Ext. Work 2017/2

Item 1 Brick layer 2017/1


Ext Work/2017/5

Item 1 Concretor 2017/1


Item 3 Concretor 2017/1
Item 32 Concretor 2017/1
Item 18(b) Concretor 2017/1
Bil Item Kuantiti Jumlah
1 G/Beam 4/600/0.200 4 Excavator
4.1 x 0.2x 0.6 = 0.49 m²
0.49 x 4 no = 1.96 m²
F/work
i) 4.1 x 0.6 x 4 = 9.84 m²
ii) 3.7 x 0.6 x 4 = 8.88 m²
18.72 m²
Concrete
i) 4.1 x 0.6 x 0.2 x 2 = 0.98 m³
ii) 3.7 x 0.6 x 0.2 x 2 = 0.88 m³
1.86 m³
Lean concrete
4.1 x 0.2 x 4 = 3.28 m²
Besi
6T12
6 x 4.6 x 4 = 110.4 m
110.4 x 0.90 kg = 99.4 kg
R10-300
1.3 x13 x 4 = 67.6 m
67.6 m x 0.616 = 41.6 kg
2 Slab Concrete
dalam 0.700 x 2.5 x 0.1 x 2 = 0.34
0.700 x 3.7 x o.1 x 2 = 0.51
0.85 m³
luar 0.6 x 4.1 x 0.1 x 2 = 0.49
0.6 x 5.3 x 0.1 x 2 = 0.63
1.12 m³
T10-300 Besi
i) 1.4 x 14 x 4 = 78.4 kg
78.4 kg x 0.616 = 48.3 kg
ii) 3.7 x 2 x 4 = 29.6 kg
29.6 x 0.616 = 18.23 kg
iii) 5.3 x 2 x 4 = 42.4 kg
42.4 m x 0.616 = 26.11 kg
3 Dinding Batu bata
0.6 x 4.1 x 4 = 9.84 m²
Plastering
9.84 x 2 = 19.7 m²
Rendering
0.7 x 6.2 x 2 = 8.6 m²
0.6 x 9.4 x 2 = 11.28 m²
Crusher run
2.4 x 2.4 = 5.76 m²
Harga
Bil Item Unit Kuantiti Harga Jumlah
1 Kerja Pengorekan m³ 1.96 12.6 24.70
2 Kerja F/work to G/beam m² 18.72 42.9 803.1
3 Concrete G25 t o slab in G/beam m³ 3.86 312.4 1205.86
4 Lean concrete (50 mm) m³ 0.16 238.7 38.19
5 Tetulang
i) T12 kg 99.4 3.5 347.90
ii) T10 kg 92.64 3.5 324.24
iii) R10 kg 41.6 3.4 141.44
6 Batu bata (1/2 brick) m² 9.84 47.6 468.38
7 Plastering to brick 16 mm m² 19.7 11.3 222.61
8 Rendering to slab m² 19.88 12.5 248.50
9 Crusher run m² 5.76 10.7 61.63

TOTAL RM 3886.55
Rujukan
Excavator/2017/1 Item 9
Concretor/2017/1/ Item 31
Concretor/2017/1/ Item 6
Concretor/2017/1/ Item 1

Concretor/2017/1/ Item 19 (b)


Concretor/2017/1/ Item 19 (A)
Concretor/2017/1/ Item 18 (b)
Bricklayer/2017/1 Item 3
Pavior/2017/1 Item 41
Pavior/2017/1 Item 41