You are on page 1of 46

Prepare a detailed estimate of a TWO room as per the plan and elevation given use

u1) Earthwork in excavation@375 RS /m^3.


u2)Ist class brickwork in foundation (1:6) @300 Rs /m^3

u3) PCC in foundation (1:2:4) @ 380 Rs /m^3

u4)DPC @ 20 Rs /m^2

u5) Ist class brick work in super structure (1:4)@390 Rs /m^2

u6) Plastering inside @12 Rs /m^2 and outside @15 Rs /m^2

u7)Inside two coats of white wash @9 Rs /m^2 with one coat of colou

u8)Outside two coats of white wash @ 9Rs /^2

6
+0.3/2+0.
Center to center length 3+3
of long wall = +0.3/2 = 9.6 NO
Center to center length
of shortwall = 4 + 0.3/2 +0.3/2 = 4.3 NO

DETAIL OF MEASUREMENT FORM


Sno Description No Length Breadth Height Quantity Unit
Earthwork in
excavation
1
Longwall 2 10.5 0.9 1.4 26.46 M^3

Short wall 3 3.4 0.9 1.4 12.85 M^3


Total 39.31 M^3
PCC in foundation

Longwall 2 10.5 0.9 0.3 5.67 M^3


2
Short wall 3 3.4 0.9 0.3 2.75 M^3
Total 8.42 M^3
Ist class brickwork in
foundation
Long wall

Step 1 2 10.4 0.8 0.6 9.98 M^3

3
step 2 2 10.2 0.6 0.5 6.12 M^3

3 step 3 2 10.1 0.5 0.4 4.04 M^3


Short wall

Step 1 3 3.5 0.8 0.6 5.04 M^3

step 2 3 3.7 0.6 0.5 3.33 M^3

step 3 3 3.8 0.5 0.4 2.28 M^3


Total 30.79 M^3

Longwall 2 9.9 0.3 5.94 M^2


4
Short wall 3 4 0.3 3.60 M^2
Total 9.54 M^2
Ist Class brickwork in
superstructure M^3

5 Longwall 2 9.9 0.3 4 23.76 M^3

Short wall 3 4 0.3 4 14.40 M^3


Total 38.16 M^3

Plastering Inside M^2


Longwall 2 9 4 72 M^2
6
Short wall 4 4 4 64 M^2
Total 136
Outside
Longwall 2 9.9 4.4 87.12 M^2
7 Short wall 2 4.6 4.4 40.48 M^2

Total 127.6 M^2


White wash Inside 1
Longwall 2 9 4 72 M^2
Short wall 4 4 4 64 M^2
Total 136
8
Outside 1
Longwall 2 9.9 4.4 87.12 M^2
Short wall 2 4.6 4.4 40.48 M^2
8

Total 127.6 M^2


Abstract of estimated cost
Sno Description Quantity Unit Rate Per unit Amount Unit
1 Earthwork in
excavation 39.31 M^3 375 Rs /M^3 14742
2 PCC in foundation 8.42 M^3 380 Rs /M^3 3201.12
3 Ist class brickwork in
foundation 30.8 M^3 300 Rs /M^3 9238.2
4 DPC 39.22 M^2 20 Rs /M^2 784.36
5 Ist Class brickwork in
superstructure 38.16 M^3 390 Rs /M^3 14882.4
6 Plastering Inside 136 M^2 12 Rs /M^2 1632
7 Outside 130.24 M^2 15 Rs /M^2 1953.6
8 white wash Inside 136 M^2 11 Rs /M^2 1496
9 white wash outside 130.24 M^2 11 Rs /M^2 1432.64
Total 49362.3 RS

Add
Continge
ncy 3% 986.1 RS

Add
work
charge
establish
ment 2% 657.4 RS
Overall
cost 51005.8 RS

Qno 2
Prepare a detailed estimate of a two room as per the plan and elevation given use fo
u1) Earthwork in excavation@375 RS /m^3.
u2)Ist class brickwork in foundation (1:6) @300 Rs /m^3

u3) PCC in foundation (1:2:4) @ 380 Rs /m^3

u4)DPC @ 20 Rs /m^2

u5) Ist class brick work in super structure (1:4)@390 Rs /m^2

u6) Plastering inside @12 Rs /m^2 and outside @15 Rs /m^2

u7)Inside two coats of white wash @9 Rs /m^2 with one coat of colou

u8)Outside two coats of white wash @ 9Rs /^2


5
+0.3/2+0.
Center to center length 3+4
of long wall = +0.3/2 = 9.6 NO
Center to center length
of shortwall = 5 + 0.3/2 +0.3/2 = 5.3 NO

DETAIL OF MEASUREMENT FORM


Sno Description No Length Breadth Height Quantity Unit
Earthwork in
excavation
1
Longwall 2 10.5 1 0.7 14.70 M^3
Short wall 3 4.3 1 0.7 9.03 M^3
Total 23.73 M^3
PCC in foundation
Longwall 2 10.5 1 0.2 4.20 M^3
2
Short wall 3 4.3 1 0.2 2.58 M^3
Total 6.78 M^3
Ist class brickwork in
foundation
Long wall
Step 1 2 10.4 0.8 0.2 3.33 M^3
step 2 2 10.2 0.6 0.3 3.67 M^3
3 step 3 2 10 0.4 0.5 4.00 M^3
Short wall
Step 1 3 4.5 0.8 0.2 2.16 M^3
step 2 3 4.7 0.6 0.3 2.54 M^3
step 3 3 4.9 0.4 0.5 2.94 M^3
Total 18.64 M^3

DPC
Longwall 2 10.2 0.3 6.12 M^2
4
Short wall 3 5 0.3 4.50 M^2
Total 10.62 M^2
Ist Class brickwork in
superstructure M^3
5 Longwall 2 10.2 0.3 4.2 25.70 M^3
Short wall 3 5 0.3 4.2 18.90 M^3
Total 44.60 M^3

Plastering Inside M^2


6
Longwall 2 9 4.2 75.6 M^2
6
Short wall 4 5 4.2 84 M^2
Total 159.6
Outside
Longwall 2 9.9 4.7 93.06 M^2
7 Short wall 2 5.6 4.7 52.64 M^2

Total 145.7 M^2


White wash Inside
Longwall 2 9 4.2 75.6 M^2
Short wall 4 5 4.2 84 M^2
Total 159.6
8
Outside 1
Longwall 2 9.9 4.7 93.06 M^2
Short wall 2 5.6 4.7 52.64 M^2
Total 145.7 M^2
Abstract of estimated cost
Sno Description Quantity Unit Rate Per unit Amount Unit
1 Earthwork in
excavation 23.73 M^3 375 Rs /M^3 8898.75
2 PCC in foundation 6.78 M^3 380 Rs /M^3 2576.4
3 Ist class brickwork in
foundation 18.6 M^3 300 Rs /M^3 5592
4 DPC 10.62 M^2 20 Rs /M^2 212.4
5 Ist Class brickwork in
superstructure 44.6 M^3 390 Rs /M^3 17394
6 Plastering Inside 159.6 M^2 12 Rs /M^2 1915.2
7 Outside 145.7 M^2 15 Rs /M^2 2185.5
8 white wash Inside 159.6 M^2 11 Rs /M^2 1755.6
9 white wash outside 145.7 M^2 11 Rs /M^2 1602.7
Total 42132.6 RS

Add
Continge
ncy 3% 1263.98 RS

Add
work
charge
establish
ment 2% 842.651 RS
Overall
cost 44239.2 RS
Prepare a detailed estimate of a three room as per the plan and elevation given use
u1) Earthwork in excavation@375 RS /m^3.
u2)Ist class brickwork in foundation (1:6) @300 Rs /m^3

u3) PCC in foundation (1:2:4) @ 380 Rs /m^3

u4)DPC @ 20 Rs /m^2

u5) Ist class brick work in super structure (1:4)@390 Rs /m^2

u6) Plastering inside @12 Rs /m^2 and outside @15 Rs /m^2

u7)Inside two coats of white wash @9 Rs /m^2 with one coat of colou

u8)Outside two coats of white wash @ 9Rs /^2


Calculate deductions where ever applicable

4
+0.3/2+0.
3+3
Center to center length +0.3+2+0.
of long wall = 3 = 9.9 NO
Center to center length
of shortwall = 5 + 0.3/2 +0.3/2 = 5.3 NO

DETAIL OF MEASUREMENT FORM


Sno Description No Length Breadth Height Quantity Unit
Earthwork in
excavation
1
Longwall 2 M^3

Short wall 4 M^3


Total 0.00 M^3
PCC in foundation M^3

Longwall 2 M^3
2
Short wall 4 M^3
Total 0.00 M^3
Ist class brickwork in
foundation
Long wall
Step 1 2

step 2 2
3 step 3 2
Short wall

Step 1 4

step 2 4
step 3 4
Total 0.00 M^3

DPC

Longwall 2 M^2
4
Short wall 2 M^2
Total 0.00 M^2
Deduct door sills 3 1.2 0.3 0.36
Total -0.36 M^2

Ist Class brickwork in


superstructure

5 Longwall 2 M^3

Short wall 4 M^3


Total 0.00 M^3
DEDUCTIONS
DOORS 3 1.2 0.3 2.1 2.27 M^3
WINDOWS 5 1.4 0.3 1.7 3.57 M^3

LINTELS OVER DOORS 3 1.4 0.3 0.15 0.19 M^3

LINTELS OVER
WINDOWS 5 1.6 0.3 0.15 0.36 M^3
Total 6.39
Total quantity -6.39 M^3

Plastering Inside M^2


Longwall 2 M^2

6
Short wall 6 M^2
Total 0 M^2
Deductions
6
Doors 3 1.2 2.1 7.56 M^2
windows 5 1.4 1.7 11.90 M^2
Total 19.46 M^2
Final quantity -19.46 M^2

Outside 1
Longwall 2 M^2
Short wall 2 M^2
Total 0 M^2
Deductions
7
Doors 3 1.2 2.1 7.56 M^2
windows 5 1.4 1.7 11.90 M^2
Total 19.46 M^2
Final quantity -19.46 M^2

White wash Inside 1


Longwall 2 M^2
Short wall 6 M^2
Total 0
Deductions
Doors 3 1.2 2.1 7.56 M^2
windows 5 1.4 1.7 11.90 M^2
Total 19.46 M^2
Final quantity -19.46 M^2
8
Outside 1
Longwall 2 M^2
Short wall 2 M^2
Total 0 M^2
Deductions
Doors 3 1.2 2.1 7.56 M^2
wndows 5 1.4 1.7 11.90 M^2
Total 19.46 M^2
Final quantity -19.46 M^2
Abstract of estimated cost
Sno Description Quantity Unit Rate Per unit Amount Unit
1 Earthwork in
excavation M^3 375 Rs /M^3 375
2 PCC in foundation M^3 380 Rs /M^3 380
3 Ist class brickwork in
foundation M^3 300 Rs /M^3 300
4 DPC M^2 20 Rs /M^2 20
5 Ist Class brickwork in
superstructure M^3 390 Rs /M^3 390
6 Plastering Inside M^2 12 Rs /M^2 12
7 Outside M^2 15 Rs /M^2 15
8 white wash Inside M^2 11 Rs /M^2 11
9 white wash outside M^2 11 Rs /M^2 11
Total 1514 RS

Add
Continge
ncy 3% 579.9 RS

Add
work
charge
establish
ment 2% 386.6 RS
Overall
cost 2480.5 RS
and elevation given use following specifications

Rs /m^3

@390 Rs /m^2
@15 Rs /m^2
ith one coat of colour wash @11 Rs /m^2

Remarks
Height is from ground
level till bottom
length of long wall = 9.6
+ 0.9/2 +0.9/2
length of Short wall = 4.3
- 0.9/2 -0.9/2

length of long wall = 9.6+


0.9/2 +0.9/2
length of Short wall = 4.3
- 0.9/2 -0.9/2

length of long wall = 9.6


+ 0.8/2 +0.8/2
length of long wall = 9.6
+ 0.6/2 +0.6/2
length of long wall = 9.6
+ 0.5/2 +0.5/2

length of Short wall = 4.3


- 0.8/2 -0.8/2
length of Short wall = 4.3
- 0.6/2 -0.6/2
length of Short wall = 4.3
- 0.5/2 -0.5/2

length of long wall = 9.6


+ 0.3/2 +0.3/2
length of Short wall = 4.3
- 0.3/2 -0.3/2

length of long wall = 9.6


+ 0.3/2 +0.3/2
length of Short wall = 4.3
- 0.3/2 -0.3/2

inner length of room


inner width of room

outer length of room uptoL =9.6+0.3


outer length of room uptoH= 4+0.4

inner length of room


inner width of room

outer length of room upto ground level


outer length of room upto ground level
d elevation given use following specifications

Rs /m^3

@390 Rs /m^2
@15 Rs /m^2
ith one coat of colour wash @11 Rs /m^2
2

Remarks
Height is from ground
level till bottom

10.4

10.2
10

4.5

4.9

10.2
5
inner length of room
inner width of room

outer length of room upto ground level


outer length of room upto ground level

inner length of room


inner width of room

outer length of room upto ground level


outer length of room upto ground level
and elevation given use following specifications

Rs /m^3

@390 Rs /m^2
@15 Rs /m^2
ith one coat of colour wash @11 Rs /m^2

Remarks
Height is from ground
level till bottom
length of long wall = 4.3
+ 0.8/2 +0.8/2
length of Short wall = 3.3
- 0.8/2 -0.8/2

length of long wall = 4.3


+ 0.8/2 +0.8/2
length of Short wall = 3.3
- 0.8/2 -0.8/2
length of long wall = 4.3
+ 0.7/2 +0.7/2
length of long wall = 4.3
+ 0.6/2 +0.6/2

length of Short wall = 3.3


- 0.7/2 -0.7/2
length of Short wall = 3.3
- 0.6/2 -0.6/2

length of long wall = 4.3


+ 0.3/2 +0.3/2
length of Short wall = 3.3
- 0.3/2 -0.3/2

length of long wall = 4.3


+ 0.3/2 +0.3/2
length of Short wall = 3.3
- 0.3/2 -0.3/2

VOLUME OF DOOR
VOLUME OF WINDOW
Length of Lintel = length
of opening + 2 side
bearings
Length of Lintel = length
of opening + 2 side
bearings

inner length of room


inner width of room

area occupied by door


area occupied by window

outer length of room upto ground level


outer length of room upto ground level

area occupied by door


area occupied by window

inner length of room


inner width of room

area occupied by door


area occupied by window

outer length of room upto ground level


outer length of room upto ground level

area occupied by door


area occupied by window
Prepare a detailed estimate of a TWO room as per the plan and elevation given use
u1) Earthwork in excavation@375 RS /m^3.
u2)Ist class brickwork in foundation (1:6) @300 Rs /m^3

u3) PCC in foundation (1:2:4) @ 380 Rs /m^3

u4)DPC @ 20 Rs /m^2

u5) Ist class brick work in super structure (1:4)@390 Rs /m^2

u6) Plastering inside @12 Rs /m^2 and outside @15 Rs /m^2

u7)Inside two coats of white wash @9 Rs /m^2 with one coat of colou

u8)Outside two coats of white wash @ 9Rs /^2

6
Center to center +0.3/2+0.
length of long 3+4
wall = +0.3/2 = 9.6 NO
Center to center
length of
shortwall = 4 + 0.3/2 +0.3/2 = 4.3 NO

total center to center length = 9.6X2 + 4.3 x3 = 32.1 m


outside length for plastering = 9.9x2+4.6x 2 = 29 m

DETAIL OF MEASUREMENT FORM


Sno Description No Length Breadth Height Quantity Unit
1 Earthwork in
excavation 1 31.2 0.9 1.4 39.31 M^3
2 PCC in
foundation 1 31.2 0.9 0.3 8.42 M^3
Ist class
3 brickwork in
foundation
Step 1 1 31.3 0.8 0.6 15.02 M^3
step 2 1 31.5 0.6 0.5 9.45 M^3
step 3 1 31.6 0.5 0.4 6.32 M^3
Total 30.79 M^3

4 DPC 1 31.8 0.3 9.54 M^2


Ist Class
5 brickwork in
superstructure 1 31.8 0.3 4 38.16 M^3
6
Plastering Inside 1 34 4 136.00 M^2
7 Outside 1 29 4.4 127.60 M^2
8 White wash
Inside 1 34 4 136.00 M^2
Outside 1 29 4.4 127.60 M^2

Abstract of estimated cost


Sno Description Quantity Unit Rate Per unit Amount Unit
1 Earthwork in
excavation 39.31 M^3 375 Rs /M^3 14742
2 PCC in
foundation 8.42 M^3 380 Rs /M^3 3201.12
Ist class
3 brickwork in
foundation 30.8 M^3 300 Rs /M^3 9238.2
4 DPC 9.54 M^2 20 Rs /M^2 190.8
Ist Class
5 brickwork in
superstructure 38.16 M^3 390 Rs /M^3 14882.4
6
Plastering Inside 136 M^2 12 Rs /M^2 1632
7 Outside 127.6 M^2 15 Rs /M^2 1914
8 white wash
Inside 136 M^2 11 Rs /M^2 1496
9 white wash outsi 127.6 M^2 11 Rs /M^2 1403.6
Total 48700.1 RS

Add
Continge
ncy 3% 1461 RS

Add
work
charge
establish
ment 2% 974 RS
Overall
cost 51135.1 RS

Qno 2
Prepare a detailed estimate of a two room as per the plan and elevation given use fo
u 1) Earthwork in excavation@375 RS /m^3.
u2)Ist class brickwork in foundation (1:6) @300 Rs /m^3
u3) PCC in foundation (1:2:4) @ 380 Rs /m^3

u4)DPC @ 20 Rs /m^2

u5) Ist class brick work in super structure (1:4)@390 Rs /m^2

u6) Plastering inside @12 Rs /m^2 and outside @15 Rs /m^2

u7)Inside two coats of white wash @9 Rs /m^2 with one coat of colou

u8)Outside two coats of white wash @ 9Rs /^2

5
Center to center +0.3/2+0.
length of long 3+4
wall = +0.3/2 = 9.6 NO
Center to center
length of
shortwall = 5 + 0.3/2 +0.3/2 = 5.3 NO

total center to center length = 9.6X2 + 5.3 x3 = 29.8 m


outside length for plastering = 9.9x2+5.6x 2 = 31 m

DETAIL OF MEASUREMENT FORM


Sno Description No Length Breadth Height Quantity Unit
1 Earthwork in
excavation 1 M^3
2 PCC in
foundation 1 M^3
Ist class
3 brickwork in
foundation
Step 1 1 M^3
step 2 1 M^3
step 3 1 M^3
Total M^3

4 DPC 1 M^2
Ist Class
5 brickwork in
superstructure 1 M^3
6
Plastering Inside 1 M^2
7 Outside 1 M^2
8 White wash
Inside 1 M^2
Outside 1 M^2

Abstract of estimated cost


Sno Description Quantity Unit Rate Per unit Amount Unit
1 Earthwork in
excavation M^3 375 Rs /M^3
2 PCC in
foundation M^3 380 Rs /M^3
Ist class
3 brickwork in
foundation M^3 300 Rs /M^3
4 DPC M^2 20 Rs /M^2
Ist Class
5 brickwork in
superstructure M^3 390 Rs /M^3
6
Plastering Inside M^2 12 Rs /M^2
7 Outside M^2 15 Rs /M^2
8 white wash
Inside M^2 11 Rs /M^2
9 white wash outside M^2 11 Rs /M^2
Total 0 RS

Add
Continge
ncy 3% RS

Add
work
charge
establish
ment 2% RS
Overall
cost 0 RS

Prepare a detailed estimate of a three room as per the plan and elevation given use
u1) Earthwork in excavation@375 RS /m^3.
u2)Ist class brickwork in foundation (1:6) @300 Rs /m^3

u3) PCC in foundation (1:2:4) @ 380 Rs /m^3

u4)DPC @ 20 Rs /m^2
u5) Ist class brick work in super structure (1:4)@390 Rs /m^2
u6) Plastering inside @12 Rs /m^2 and outside @15 Rs /m^2

u7)Inside two coats of white wash @9 Rs /m^2 with one coat of colou

u8)Outside two coats of white wash @ 9Rs /^2


Calculate deductions where ever applicable

4
+0.3/2+0.
Center to center 3+3
length of long +0.3+2+0.
wall = 3 = 9.9 NO
Center to center
length of
shortwall = 5 + 0.3/2 +0.3/2 = 5.3 NO

total center to center length = 9.9X2 +5.3X3 =35.7


outside length for plastering = 10.2x2+5.6x 2 = 31.6 m

DETAIL OF MEASUREMENT FORM


Sno Description No Length Breadth Height Quantity Unit
1 Earthwork in
excavation 1 M^3

2 PCC in
foundation 1 M^3
Ist class
brickwork in
foundation

Step 1 1 M^3
3

step 2 1 M^3

step 3 1 M^3
Total M^3
DPC 1 M^2
4 Deduct door
sills 3 1.2 0.3 0.36
Total -0.36 M^2
Ist Class
brickwork in
superstructure 1 M^3
DEDUCTIONS
DOORS 3 1.2 0.3 2.1 2.27 M^3
WINDOWS 5 1.4 0.3 1.7 3.57 M^3
5
LINTELS OVER D 3 1.4 0.3 0.15 0.19 M^3

LINTELS OVER W 5 1.6 0.3 0.15 0.36 M^3


Total 6.39
Total quantity -6.39 M^3

Plastering Inside 1 M^2


Deductions
Doors 3 1.2 2.1 7.56 M^2
6
windows 5 1.4 1.7 11.90 M^2
Total 19.46 M^2
Final quantity -19.46 M^2
Outside 1 M^2
Deductions
Doors 3 1.2 2.1 7.56 M^2
7
windows 5 1.4 1.7 11.90 M^2
Total 19.46 M^2
Final quantity -19.46 M^2

White wash
Inside 1 M^2
Deductions
Doors 3 1.2 2.1 7.56 M^2
8
windows 5 1.4 1.7 11.90 M^2
Total 19.46 M^2
Final quantity -19.46 M^2
Outside 1 M^2
Deductions
Doors 3 1.2 2.1 7.56 M^2
9
windows 5 1.4 1.7 11.90 M^2
Total 19.46 M^2
9

Final quantity -19.46 M^2


Abstract of estimated cost
Sno Description Quantity Unit Rate Per unit Amount Unit
1 Earthwork in
excavation M^3 375 Rs /M^3
2 PCC in
foundation M^3 380 Rs /M^3
Ist class
3 brickwork in
foundation M^3 300 Rs /M^3
4 DPC M^2 20 Rs /M^2
Ist Class
5 brickwork in
superstructure M^3 390 Rs /M^3
6
Plastering Inside M^2 12 Rs /M^2
7 Outside M^2 15 Rs /M^2
8 white wash
Inside M^2 11 Rs /M^2
9 white wash outside M^2 11 Rs /M^2
Total 0 RS

Add
Continge
ncy 3% RS

Add
work
charge
establish
ment 2% RS
Overall
cost 0 RS
and elevation given use following specifications

Rs /m^3

@390 Rs /m^2
@15 Rs /m^2
ith one coat of colour wash @11 Rs /m^2

Remarks
Height is from ground
level till bottom

L =Total C/C length - overalap of central wall

L =Total C/C length - overalap of central wall


L =Total C/C length - overalap of central wall
L =Total C/C length - overalap of central wall
L=6X2+4X2 + 3 x2 + 4x 2=34
H = 4+0.4 =4.4

L=6X2+4X2 + 3 x2 + 4x 2=34
H = 4+0.4 =4.4

d elevation given use following specifications


Rs /m^3

@390 Rs /m^2
@15 Rs /m^2
ith one coat of colour wash @11 Rs /m^2

Remarks
Height is from ground
level till bottom

L =Total C/C length - overalap of central wall

L =Total C/C length - overalap of central wall


L =Total C/C length - overalap of central wall
L =Total C/C length - overalap of central wall

L=5X2+5X2 + 4 x2 + 5x 2=38
H = 4.2+0.5 =4.7
L=5X2+5X2 + 4 x2 + 5x 2=38
H = 4.2+0.5 =4.7

and elevation given use following specifications

Rs /m^3
@390 Rs /m^2
@15 Rs /m^2
ith one coat of colour wash @11 Rs /m^2

Remarks
Height is from ground
level till bottom

L =Total C/C length -


overalap of central wall

L =Total C/C length -


overalap of central wall

L =Total C/C length -


overalap of central wall

L =Total C/C length -


overalap of central wall
VOLUME OF DOOR
VOLUME OF WINDOW
Length of Lintel = length
of opening + 2 side
bearings
Length of Lintel = length
of opening + 2 side
bearings

L=4X2+5X2 + 3 x2 + 5x
2+2X2 +5X2 =48

area occupied by door


area occupied by
window

H = 4.2+0.5 =4.7

area occupied by door


area occupied by
window

L=4X2+5X2 + 3 x2 + 5x
2+2X2 +5X2 =48

area occupied by door


area occupied by
window

H = 4.2+0.5 =4.7