3x15MW WAMPU HEPP PROJECT 1000-0183-EM-462-001(2/2)
Rev. No. : 0
TITLE
Commissioning Procedure of
Electric Equipment Page. No : Cover
Rev. No. : 0
Commissioning Procedure of
TITLE
Electric Equipment Page. No : 1 / 9
For Construction
REV.
DATE DESCRIPTION PREP'N CHECK REVIEW APPROVAL
NO.
REV.
CNEEC PREPARATION CHECK REVIEW APPROVAL
NO.
Rev. No. : 0
Commissioning Procedure of
TITLE
Electric Equipment Page. No : 2 / 9
CONTENT
1. PREFACE .............................................................................................................................................................................................................................. 3
2. STANDARDS ......................................................................................................................................................................................................................... 3
14. TEST OF THE POWER DISTRIBUTION EQUIPMENT AND FEED LINE OF THE VOLTAGE CATEGORY 1KV AND BELOW ..................... 8
Rev. No. : 0
Commissioning Procedure of
TITLE
Electric Equipment Page. No : 3 / 9
1. Preface
The electric equipment of WAMPU Hydropower Station shall be transported to site via ocean
shipping after assembly and test are completed in the factory. During process of installation,
hand-over test of the equipment should be conducted as per the standards of GB or IEC. The items of
hand-over test should be conducted in accordance with the conditions of the site and the
specifications. For those test items of the equipment which cannot be assembled in the factory but
have to be assembled at site, they must be conducted strictly in accordance with the hand-over test
specifications. For those test items which have been tested and the special test items listed in the
specifications, they may be selected to test or not to test according to the site condition.
2. Standards
GB & IEC.
Rev. No. : 0
Commissioning Procedure of
TITLE
Electric Equipment Page. No : 4 / 9
transformer is an oil-immersed one, the excitation transformer is an air-immersed one. The capacities
of the transformers in this power station which is less than 1600kVA should be conducted the
following tests during process of installation:
4.1 Test of the insulation oil,
4.2 Test DC resistance of the windings and the sleeves,
4.3 Inspect the voltage ratio of all taps,
4.4 Inspect the three-phase wiring group category of the transformer,
4.5 Test the insulation resistance of each fastener (for those that connection strap can be removed)
which is insulated to the iron core and the iron core (for those that lead-out grounding wire are
provided).
4.6 Test of non-pure porcelain bushing shells,
4.7 Inspection and test the on-load voltage regulation switchover device,
4.8 Test the insulation resistance, the absorptance or polarizability index of the windings with the
bushing shells,
4.9 Test the dielectric loss angle tangent value tan of the windings with the bushing shells,
4.10 Test the DC leakage current of the windings with the bushing shells,
4.11 Test the AC voltage-withstanding of the windings with the bushing shells,
4.12 Impact switch test under the rated voltage,
4.13 Inspect the phase position,
4.14 Test the noise.
The test of the oil-immersed transformer can be conducted as per the regulations in the sub-claus
e 4.1, 4.2, 4.3, 4.4, 4.5, 4.6, 4.7, 4.8, 4.11, 4.13 and 4.14 in this clause. The test of the air-immersed tr
ansformer can be conducted as per the regulations in the sub-clause 4.2, 4.3, 4.4, 4.5, 4.7, 4.8, 4.11, 4.
13 and 4.14 in this clause.
5. Test of mutual-inductor
The mutual-inductors in WAMPU hydropower station include current transformer and potential
transformer, all of which are manufactured as entirety in the factory. During process of installation,
the mutual-inductors should be tested as the following:
5.1 Test the insulation resistance of the windings,
5.2 Test the dielectric loss angle tangent value tan of the mutual-inductors of voltage category 35kV
and above,
5.3 AC voltage-withstanding test,
5.4 Insulation medium performance test,
5.5 Test the DC resistance of the windings,
DOCU. NO. :
3x15MW WAMPU HEPP PROJECT 1000-0183-EM-462-001(2/2)
Rev. No. : 0
Commissioning Procedure of
TITLE
Electric Equipment Page. No : 5 / 9
6.2.7 Test the synchronous performance and cooperating time of the main and auxiliary contacts of
the breaker,
6.2.8 Test the time that the switch on resistance of the breaker put in and the resistance values,
DOCU. NO. :
3x15MW WAMPU HEPP PROJECT 1000-0183-EM-462-001(2/2)
Rev. No. : 0
Commissioning Procedure of
TITLE
Electric Equipment Page. No : 6 / 9
6.2.9 Test the insulation resistance and DC resistance of the switch on and off coils and switch on
contact coils of the breaker,
6.2.10 Test of the operating mechanism of the breakers.
6.2.11 Test of the bushing current transformer,
5.2.12 Test the moisture content in SF6 gas in the breaker,
6.2.13 Test of tightness,
6.2.14 Inspection of the gas density relay, pressure gauge and pressure action valve.
Rev. No. : 0
Commissioning Procedure of
TITLE
Electric Equipment Page. No : 7 / 9
9.4 Test of the insulation oil (organic compound insulation bushing not included),
9.5 Gas test of the SF6 bushing.
Note: The bushing integrally assembled on the 35kV oil breaker may not be tested for tan.
Note: 1The test items of the rubber-plastic insulation power cable should be conducted as per the
sub-clause 1, 3, 4, 5 and 7 of this clause. If conditions are not provided, it is allowed to substitute the
DC voltage-withstanding test and leakage current test for AC voltage-withstanding test of the cable
which rated voltage is U0U is 1830kV and below,
2The test items of the paper cable should be conducted in accordance with the sub-clause 11.1,
11.2 and 11.5 of this clause, and
3) The test items of the oil-filled cable should be conducted in accordance with the sub-clause
11.1, 11.2, 11.5, 11.6 and 11.7 of this clause.
Rev. No. : 0
Commissioning Procedure of
TITLE
Electric Equipment Page. No : 8 / 9
with the contents of the sub-clause 1, 2, 3 and 4 of this clause, one test can be selected in whichever
the clause 2 and 3, and
2) The test items of the gapped metal oxide lightning arrestor are conducted in accordance
with the contents of the sub-clause 1 and 5 of this clause.
14. Test of the power distribution equipment and feed line of the voltage category
1kV and below
This test should include the following:
14.1 Test the insulation resistance,
14.2 AC voltage-withstanding test of the distribution equipment, and
14.3 Inspect that the phase positions between feed wires or both sides of the feed wire of different po
wer sources in the distribution equipment should be identical.
Rev. No. : 0
Commissioning Procedure of
TITLE
Electric Equipment Page. No : 9 / 9
contactor, controller, control switch, starter, resistor, rheostat, electromagnet and etc. of 601200V.
The test items of the LV electric equipment should include the following:
16.1 Test the insulation resistance of the cable connected with the LV electric equipment and the
secondary circuit,
16.2 Verification of the action value of the potential coil,
16.3 Inspection of the motion by the LV electric equipment, and
16.4 Setting of the trip dog adopted for the LV electric equipment.