BNEH 3203 ENVIRONMENT IMPACT ASSESSMENT

Faculty of Allied Health Sciences

STUDENT INFORMATION:

201405040059
201405040069
STUDENT
NO. 201405040052
201405040070
201405040068
HASHIRAN BIN IBRAHIM
NORSARIZAL B. MOHD MOKHTAR
NAME MAZURIANA BINTI MAT SIDEK
HASLIZA BINTI MOHAMMAD
MOHAMAD SYAFIQ BIN SHAFIEI

PHONE NO.
017-3880593

E-MAIL
longchai547@yahoo.com

Faculty of Allied Health Sciences (FOAHS)


BNEH 3203 ENVIRONMENT IMPACT ASSESSMENT
Faculty of Allied Health Sciences

ASSESSMENT INFORMATION:
ENVIRONMENT
SUBJECT SUBJECT BNEH 3203
NAME IMPACT CODE
ASSESSSMENT
The objective of the Mini Project is for the student to have a hands-on
exposure on the process of preparing an EIA report. As EIA report is
ASSIGNMENT usually prepared by a team of EIA consultants, thus the Mini Project is a
DETAILS group assignment. For the Mini Project, students must form groups of 4
(title) members, and select your OWN small project. The group has to prepare
the four chapters: Proposed Project, Existing Environment, Potential
Impacts and Mitigating Measures.

LECTURER /
DR. JURINA BT. PETALING JAYA
TUTORS JAAFAR CAMPUS /
NAME PROVIDER

DUE DATE 11 APRIL 2016 SUBMITTED 11 APRIL 2016


ON

Signature Syafiq Date 11 APRIL 2016

Faculty of Allied Health Sciences (FOAHS)


BNEH 3203 ENVIRONMENT IMPACT ASSESSMENT
Faculty of Allied Health Sciences

PENGENALAN

Syarikat Kaya Raya Sdn. Bhd. berhasrat untuk membangunkan satu lagi tarikan
pelancongan yang berada di sekeliling bekas kapal frigate DiRaja Azlan (KD
Azlan) merangkumi Hotel bertaraf 4-bintang, Muzium Maritim, Marina, Restoran
Terapung dan Kolam Renang. Lokasi kawasan projek terletak berhampiran dengan
beberapa hotel dan resort sedia ada. Kelab Kapal Layar Lumut merupakan tarikan
pelancong yang berhampiran dengan tapak Projek, dengan jarak kira-kira 0.5 km di
bahagian barat tapak Projek. Struktur hotel dan kemudahan-kemudahan yang akan
disediakan direka dengan unik di atas platform konkrit di permukaan Sg. Manjung
(Dinding).

Pelaksanaan projek ini adalah selaras dengan visi Majlis Perbandaran Manjung dan
juga untuk industri pelancongan negara. Ia turut membawa kebaikan dari segi
penyediaan peluang pekerjaan dan keuntungan kepada semua pihak yang terlibat.
Bagi pihak Syarikat Kaya Raya pula, selain memperolehi reputasi yang bagus
apabila projek ini siap, mereka turut mendapat peluang masa hadapan yang cerah
untuk memasarkan perkhidmatan mereka dalam jangkamasa yang lama.

PENGGERAK UTAMA PROJEK DAN PERUNDING ALAM SEKITAR TERLIBAT

Penggerak Projek
SYARIKAT KAYA RAYA SDN. BHD
No. 8, Lorong Intanova,
Intanova Business Centre,
36000 Teluk Intan,Perak.

Individu untuk dihubungi : Dato Syed Ilhas bin Syed Alwi


Telefon : 05 6213457
Faksimili : 05 6213458

Faculty of Allied Health Sciences (FOAHS)


BNEH 3203 ENVIRONMENT IMPACT ASSESSMENT
Faculty of Allied Health Sciences

Perunding Alam Sekitar untuk Kajian EIA

GAHARA IMPAK ENVIRONMENTAL CONSULTANCY SDN. BHD,


No. 5, Jalan Astaka U8/84,
Jelutong Business & Technology Centre,
40150 Shah Alam,
Selangor Darul Ehsan.
Individu untuk dihubungi : Dr. Ir. Mohamad Syafiq Bin Shafiei
Telefon : 03 7842 1856
Faksimili : 03 7842 1859

LOKASI

Tapak projek terletak di bahagian selatan Ipoh, di Mukim Lumut, Daerah Manjung.
Kawasan Projek juga terletak di kawasan yang telah diwartakan sebagai Zon
Ekonomi Eksklusif Manjung Perak Silver Coast. Tapak Projek ini boleh dikunjungi
melalui Jalan Titi Panjang dari Bandar Manjung. Guna tanah di sekitar tapak Projek
ialah kawasan rekreasi yang dilengkapi dengan taman permainan kanak-kanak,
Medan Selera Medan Lumut 2 dan Kelab Kapal Layar Lumut.

Lokasi dipilih adalah kerana:


a) Terletak jauh daripada kawasan kediaman manusia
b) Berdekatan demgan kemudahan asas sperti medan selera, pejabat kerajaan dan
sebagainya.
c) Berada di dalam kawasan rekreasi air

KEPERLUAN UNDANG-UNDANG

Kajian Penilaian Impak Persekitaran ini dijalankan kerana projek ini tertakluk di
bawah Akta Kualiti Alam Sekeliling (1974) 34A, Kualiti Alam Sekeliling (Aktiviti-
Aktiviti yang Ditetapkan) (Penilaian Impak Terhadap Alam Sekeliling) Order 1987 di
mana Kajian EIA adalah mandatori untuk Projek ini.

Faculty of Allied Health Sciences (FOAHS)


BNEH 3203 ENVIRONMENT IMPACT ASSESSMENT
Faculty of Allied Health Sciences

PENERANGAN PROJEK

Pembangunan Projek ini merangkumi empat (4) komponen utama iaitu, Hotel
bertaraf 4-bintang, Muzium Maritim, Marina, Restoran Terapung dan Kolam Renang
Infinity yang akan dibina di atas platform konkrit di permukaan Sg. Dinding. Jadual
RE2 menunjukkan komponen Projek yang terperinci, manakala Rajah RE2
menunjukkan pelan susunatur Projek dan Rajah RE3 menunjukkan konsep dan
komponen-komponen Projek.

KOMPONEN UNIT KELUASAN (EKAR)


Komponen Utama 4.98
Hotel 338 bilik 0.80
Apartmen 144
Bangunan perniagaan 94 1.66
dan pejabat
Lanskap 0.01
Tempat letak kereta 2.37
Loji rawatan kumbahan 1 0.07
Pencawang elektrik 1 0.07
Komonen lain 1.58
Restoran terapung 1
Kolam renang Infiniti 1
Marina 1
Jeti 1

Faculty of Allied Health Sciences (FOAHS)


BNEH 3203 ENVIRONMENT IMPACT ASSESSMENT
Faculty of Allied Health Sciences

I) Muzium Maritim

Muzium yang dicadangkan merupakan kapal perang Tentera Laut Diraja Malaysia
(TLDM) yang disewakan kepada Syarikat Kaya Raya Sdn. Bhd. oleh Kerajaan
Negeri Perak. Kapal ini akan dibiarkan berlabuh di 10038' 31.52"E dan 414'
5.39"N. Penggerak projek juga berhasrat untuk membangunkan KD-Azlan sebagai
Muzium Maritim untuk menaikkan lagi industri pelancongan di Lumut dan juga
Perak. Tempat berlabuhnya kapal KD-Azlan ini telah dipersetujui oleh Unit
Perancang Ekonomi Negeri (UPEN) Perak. Lokasi ini sangat sesuai untuk
mempamerkan kegagahan kapal perang ini suatu masa dahulu.
Kapal KD-Azlan ini dihubungkan oleh sebuah jeti dari darat.
Aktiviti-aktiviti yang boleh diperolehi di atas Kapal KD-Azlan ialah:

(a) Deck No. 1 Kabin Kapten dan Pusat Kawalan Kapal


(b) Deck No. 2 Kabin Pegawai Kapal, Lounge Pejabat, surau, pantri dan lain-lain.
(c) Deck No.3 Kabin Anak-anak Kapal, Dapur dan dobi.
(d) Deck No. 4 Bilik enjin, kabin-kabin yang boleh dikunjungi dengan bumbung
yang boleh dibuka.
(e) Deck No. 5 Bilik enjin utama, enjin sokongan, pam, motor tangki bahan bakar.
II) Pembangunan Hotel Maritim

Hotel Maritim akan dibina di atas permukaan platform dengan keluasan 4.98 ekar di
Sg. Dinding. Hotel ini akan dibangunkan di bahagian tenggara bekas kapal frigate
KD-Azlan.

No. Komponen Tingkat


1) Tempat letak kereta B1-B3
2) Komersial GF
3) Komersil M
4) Kemudahan hotel 1
5) Kemudahan hotel 2
6) Kemudahan hotel 3

Faculty of Allied Health Sciences (FOAHS)


BNEH 3203 ENVIRONMENT IMPACT ASSESSMENT
Faculty of Allied Health Sciences

7) Bilik-bilik hotel 4-9


8) Apartmen, Playboy Penthouse 10-17

III) Restoran Terapung dan Marina

Restoran Terapung dua tingkat dan Marina terletak di bahagian barat kapal KD-
Azlan. Restoran Terapung berbumbung boleh buka dengan permandangan
menghadap laut. Ia juga boleh diubah kepada restoran berhawa dingin dengan
pemandangan yang unik.

Marina akan dibina di bahagian utara pembangunan hotel. Marina ini akan
menyediakan tempat kapal-kapal layar berlabuh yang selamat dan kemudahan yang
lengkap bagi pemilik kapal layar. Marina ini boleh menempatkan lebih kurang empat
puluh kapal-kapal layar yang mempunyai panjang dalam anggaran 40 hingga 125
kaki.

OBJEKTIF KAJIAN

Objektif Kajian Penilaian Impak Persekitaran ini adalah seperti berikut:

(a) Mengkaji persekitaran sedia ada, yang merangkumi persekitaran fizikal,


biologikal dan persekitaran manusia di dalam lingkungan kawasan projek yang akan
terdedah kepada kesan terhadap projek yang dicadangkan;
(b) Mengenalpasti kawasan di dalam lingkungan kawasan projek yang dicadangkan
dengan menjalankan pemetaan kawasan sensitif alam sekitar (ESA);
(c) Mengenalpasti isu-isu alam sekeliling dan isu-isu yang berbangkit akibat aktiviti-
aktiviti projek yang dicadangkan;
(d) Menilai kesan-kesan terhadap alam sekeliling akibat daripada operasi projek
yang dicadangkan, termasuklah kesan-kesan sampingan;
(e) Mencadangkan langkah-langkah tebatan untuk menghapuskan, mengawal dan
mengurangkan kesan-kesan terhadap alam sekitar akibat daripada projek yang
dicadangkan;

Faculty of Allied Health Sciences (FOAHS)


BNEH 3203 ENVIRONMENT IMPACT ASSESSMENT
Faculty of Allied Health Sciences

(f) Melakukan Pelan Pengurusan Alam Sekitar (EMP) semasa fasa pelaksanaan
projek; dan
(g) Mencadangkan program pemantauan untuk mengurus kesan-kesan terhadap
alam sekitar.

KENYATAAN KEPERLUAN

Keperluan Projek yang dijangkakan adalah seperti berikut:


(a) Memenuhi kenyataan di dalam Rancangan Tempatan Daerah Manjung
(Pengubahan) 2020
(b) Pembangunan hub pelancongan dengan menambahbaik kemudahan rekreasi
dan tempat bermalam pelancong
(c) Penyediaan kemudahan hotel, sosial dan rekreasi
(d) Pembangunan sosio-ekonomi dan peluang pekerejaan dan perniagaan
(e) Pertimbangan alam sekitar.

OPSYEN PROJEK
I) Tiada Opsyen Projek

Jika opsyen Tiada Projek dijalankan, kawasan Projek akan kekal sebagai kawasan
rekreasi dengan taman permainan kanak-kanak, medan selera dan kawasan untuk
penduduk tempatan memancing sebagai hobi di masa lapang. Bilangan pelancong
yang berkunjung di Lumut juga akan kekal tidah berubah.
II) Dengan Opsyen Projek

Opsyen Dengan Projek akan mengambilkira kenyataan di dalam Rancangan


Tempatan Daerah Manjung (Pengubahan) 2020 dan lokasi kajian.

Faculty of Allied Health Sciences (FOAHS)


BNEH 3203 ENVIRONMENT IMPACT ASSESSMENT
Faculty of Allied Health Sciences

PERSEKITARAN SEDIA ADA

Parameter Huraian
Fizikal dan Sumber Alam
Geologi Ciri-ciri geologi di dalam lingkungan tapak projek
merupakan batuan granite.
Tanah-tanih Tanih di kawasan Projek terdiri daripada tanah liat,
berlumpur dan batu kerikit di kedalaman kurang dari
20 m dan granite melebihi kedalaman 20 m.
Iklim Tropikal panas dan lembap berserta dengan
perubahan musim monsun. Data Iklim: o Stesen
Sitiawan, 2011 Trend Purata Tahunan
Purata hujan tahunan (2011): 1,039.2 mm
Jumlah hujan tertinggi (2011): 424.4 mm
Jumlah hujan terendah (2011): 80.7 mm

Purata Suhu 24 jam: 27.2C


Purata relatif kelembapan 24 jam tahunan: 86.7%

Kualiti udara
Kualiti udara Persampelan kualiti udara dijalankan di dua (2)
lokasi. Paras 24-jam TSP di stesen A1 hingga A4
ialah 83.3 g/m3 dan 152.8 g/m3, di bawah paras
Malaysian Ambient Air Quality Guidelines iaitu 260
g/m3. Paras PM10 di stesen A1 hingga A4 berada
di antara 55.6 hingga 111.11 g/m3. SO2, NO2, di
kedua-dua stesen berada di bawah paras DOE
Kualiti air
Kualiti air sungai Sampel air diambil di dua (2) (WQ1 dan WQ2)
lokasi berlainan di sekitar tapak Projek pada 14 Jun

Faculty of Allied Health Sciences (FOAHS)


BNEH 3203 ENVIRONMENT IMPACT ASSESSMENT
Faculty of Allied Health Sciences

2012. Keputusan kualiti air dibandingkan dengan


Class II, DOE Malaysia, National Water Quality
Standards for Malaysia. Kedua-dua lokasi
persampelan mematuhi NWQS, kecuali Boron (B)
di WQ1. Nilai Water Quality Index di WQ1 ialah
93.5 (dikelaskan sebagai Class I, Clean) dan 92.6
di WQ2 (dikelaskan sebagai Class I, Clean
Tahap bunyi
Tahap bunyi Pemantauan bunyi telah dilaksanakan di dua (2)
lokasi, iaitu N1dan N2. Keputusan N1 berada di
dalam lingkungan Schedule Maximum Permissible
Sound Level (LAeq) by Receiving Landuse for
Planning and New Development of The Planning
Guidelines for Environmental Noise pada waktu
siang kecuali WQ2 melebihi paras pada waktu
siang dan malam
Profil taburan Penduduk
dan Sosio ekonomi
Kajian sosio ekonomi 250 responden dari kawasan lingkungan 3-km
radius dari kawasan Projek dan 100 pelancong
telah disoal selidik termasuklah nelayan tempatan
pada Jun 2012. 72.5% responden bersetuju
dengan pembangunan projek manakala 20% tidak
bersetuju.
Kajian biologi Persampelan chlorophyll-a, phytoplankton,
zooplankton dan macrobenthos telah dijalankan
pada 24 Jun 2012 di dua (2) lokasi. * Bilangan
taburan chlorophyll a yang tinggi di kawasan
kajian.

Faculty of Allied Health Sciences (FOAHS)


BNEH 3203 ENVIRONMENT IMPACT ASSESSMENT
Faculty of Allied Health Sciences

* Jumlah taburan phytoplankton dan plankton


berada di dalam lingkungan taburan yang
dilaporkan di kawasan muara dan kawasan persisir
pantai Malaysia.
* Taburan makro bentos menunjukkan kawasan
kajian berada did alam keadaan yang natural.
Perikanan Kawasan Manjung Selatan dibahagikan kepada 4
Mukim dan terdiri daripada 17 jeti pendaratan.
Projek ini terletak di Mukim Lumut, dan jeti
pendaratan tidak terletak di dalam 3-km radius
kawasan Projek. Pembangunan Projek ini
dipercayai tidak akan memberi kesan terhadap
aktiviti nelayan
Kajian hidraulik Kerja-kerja computer-modeling akan dijalankan
untuk kajian hidraulik di kawasan Perairan Lumut
dan sungai-sungai utama. Laporan Kajian Hidraulik
akan dihantar dan dibentangkan kepada Jabatan
Pengairan dan Saliran Malaysia untuk kelulusan.
Arus di kawasan project mengalir ke arah Timur
Laut semasa ebb tide dan sebaliknya semasa flood
tide. Arus di kawasan projek antara 0.15 hingga 0.2
m/s.

PENILAIAN KESAN TERHADAP ALAM SEKELILING

Kesan negatif yang utama akibat daripada pembangunan ini telah dikenal pasti.
Kesan semasa fasa pembinaan termasuk pencemaran udara dan bunyi bising, sisa-
sisa pepejal dan cecair. Semasa fasa operasi, sisa-sisa pepejal, kumbahan,
peningkatan pencemaran udara dan bunyi bising dan pelepasan efluen merupakan
merupakan kesan-kesan yang akan timbul.

Faculty of Allied Health Sciences (FOAHS)


BNEH 3203 ENVIRONMENT IMPACT ASSESSMENT
Faculty of Allied Health Sciences

LANGKAH TEBATAN

Langkah-langkah tebatan telah disediakan bagi mengatasi kesan ketara dan huraian
terperinci seperti:
(a) Langkah-langkah kawalan kualiti air termasuk tempat penyimpanan dan kawalan
minyak dan gris, kumbahan dan sisa yang sempurna. Semua air pelepasan akan
dirawat mengikut Class II, National Water Quality Standards of Malaysia;
(b) Pengawalan pencemaran udara termasuklah pengawalan habuk, dan
pemantauan kualiti udara secara berterusan semasa fasa pembinaan;
(c) Pengawalan bunyi termasuklah menghadkan aktiviti pembinaan semasa waktu
siang, penyelenggaraan peralatan dan mesin-mesin, peruntukan kawasan
penampan dan pemantauan tahap bunyi secara berterusan;
(d) Pengurusan biomas yang teratur semasa penebangan tumbuh-tumbuhan di
tapak Projek;
(e) Pengumpulan dan pelupusan sisa-sisa pepejal dan juga rawatan sisa-sisa
kumbahan yang wajar;
(f) Semasa fasa operasi, sisa-sisa pepejal dan kumbahan harus dikendalikan secara
efektif dan
(g) Pelepasan air kumbahan dari loji rawatan kumbahan perlulah mengikut Standard
A, Environmental Quality (Sewage) Regulations, 2009.

PELAN PENGURUSAN ALAM SEKITAR (EMP)

EMP merupakan dokumen bagi kontraktor melaksanakan langkah-langkah tebatan.


bagi memastikan alam sekitar tidak terjejas, EMP ini juga menyediakan Program
Pemantauan Alam Sekitar dengan Petunjuk Prestasi Alam Sekitar dan kriteria
pematuhan bagi memastikan penilaian dijalankan dengan sistematik dan mematuhi
syarat-syarat kelulusan dan piawaian JAS.

Faculty of Allied Health Sciences (FOAHS)


BNEH 3203 ENVIRONMENT IMPACT ASSESSMENT
Faculty of Allied Health Sciences

KESIMPULAN

Rumusan bagi kesan-kesan alam sekitar, langkah-langkah penebatan, kesan-kesan


sampingan, pelan pengurusan alam sekitar dan pelan tindakan kecemasan bagi
Projek telah ditunjukkan dalam Jadual ES2.

Jadual ES3 Ringkasan Impak Signifikan dan Langkah-langkah Mitigasi

AKTIVITI IMPAK LANGKAH-LANGKAH PELAN PELAN


MITIGASI PENGURUSAN TINDAKAN
ALAM SEKITAR KECEMASAN
Fasa
Pembangunan
Aktiviti Kualiti air Pemasangan cerucuk Pelan Kawalan Sekiranya berlaku
Cerucuk merosot keping sementara dan Pencemar Udara keruntuhan
disebabkan kelodak tirai untuk * Pelan Kawalan longgokan atau
oleh mengurangkan Pencemaran bangunan dibina,
peningkatan penyebaran sedimen Bunyi berhenti kerja dan
pepejal Tutup angin ditiup Kawalan melaporkan
terampai, bahan binaan seperti Pengurusan Sisa kepada kakitangan
minyak, gris simen atau pasir. Pelan yang
dan Elakkan daripada Keselamatan dan bertanggungjawab.
tumpahan melaksanakan kerja- Pelan Kesihatan Memindahkan
cecair kerja pembinaan pada semua pekerja
hidraulik musim hujan. dengan tempat
Pencemaran Pengurusan yang betul perhimpunan dan
udara buangan terjadual dan tidak memasuki
penyimpanan. kawasan tersebut
sehingga ia
selamat.

Faculty of Allied Health Sciences (FOAHS)


BNEH 3203 ENVIRONMENT IMPACT ASSESSMENT
Faculty of Allied Health Sciences

Pengangkutan Kemerosotan Kenderaan mengangkut Pelan Kawalan Dalam kes


peralatan dan kualiti udara tanah / pasir hendaklah pencemaran kemalangan
bahan binaan Pencemaran ditutup dengan kain Udara Ubah haluan
bunyi untuk mengurangkan Pelan kenderaan dari
Risiko debu yang ditiup angin. Pengurusan ldan bunyi
Kemalangan Waktu operasi Had Bunyi penggera
disebabkan untuk kenderaan Pelan Kesihatan diaktifkan
oleh pembinaan untuk siang dan Keselamatan Semua
kenderaan hari jam (0700-1900 Pekerjaan kemalangan
berat di jam). Perkhidmatan mestilah dilapor
kawasan kenderaan yang sama kepada pihak
tapak untuk mengurangkan berkuasa yang
pelepasan ekzos. berkaitan dan
Pengurusan.
Pengambilan Perbezaan Langkah-langkah Tiada
pekerja amalan dan keselamatan standard
budaya dan peraturan yang
antara dikuatkuasakan untuk
pekerja asing melindungi kesihatan
dan dan keselamatan
masyarakat awam.
setempat Para pekerja adalah
dilarang sama sekali
berkeliaran di luar tapak
untuk mengelakkan
sebarang konflik sosial
dan salah faham
dengan penduduk
tempatan.

Faculty of Allied Health Sciences (FOAHS)


BNEH 3203 ENVIRONMENT IMPACT ASSESSMENT
Faculty of Allied Health Sciences

Pekerja perlu dipantau


pada setiap masa
supaya mereka tidak
mengganggu penduduk
tempatan.

Penyimpanan Pencemaran Mengurangkan habuk Pelan Kawalan Tiada


barang air daripada dengan kerap Pencemaran Air
minyak, gris menyembur air untuk Dan Udara
atau kimia membasahkan
tumpahan permukaan berdebu.
Peningkatan penyimpanan bahan
dalam habuk api yang akan dipasang
dan zarahan dengan halangan
pelepasan. fizikal.
Satu kit tumpahan
perlu disimpan dalam
tapak projek untuk
membendung dan
menyerap apa-apa
tumpahan sengaja
Fasa Operasi
Operasi Kemerosotan Program pengawasan Pelan Kawalan Tiada
Kemudahan kualiti air. untuk air Dan Pemcemaran Air
Peningkatan pencemaran udara Pelan Penurusan
trafik di perlu dilaksanakan. Sisa
sekitar tapak Pelan
projek. Peningkatan
Sistem pengurusan Persekitaran
trafik perlu

Faculty of Allied Health Sciences (FOAHS)


BNEH 3203 ENVIRONMENT IMPACT ASSESSMENT
Faculty of Allied Health Sciences

dilaksanakan. Operasi
dan penyelenggaraan
semua kemudahan.
Sisa pepejal Penjanaan Kutipan tetap sisa Pelan Kawalan Tada
dan pelepasan pepejal. pencemaran air
pengurusan kumbahan Memastikan Pelan
kumbahan Penjanaan pelupusan buangan Pengurusam Sisa
sisa pepejal pepejal.
Memastikan
pengurusan sisa
berjadual.
Program pengawasan
pencemaran air perlu
dilaksanakan
Pengambilan Pekerjaan Memberi keutamaan Pelan Kesihatan Tiada
pekerja dan peluang kepada warga tempatan Dan
perniagaan; Menyampaikan dasar Keselamatan
dan Kesihatan,
Kesan ke Keselamatan & Alam
atas Sekitar (HSE) kepada
keselamatan pekerja.
dan kesihatan Melaksanakan
pekerja prosedur tindak balas
kecemasan untuk
mengurangkan
sebarang impak buruk
terhadap pekerja /
orang awam dan alam
sekitar.

Faculty of Allied Health Sciences (FOAHS)